Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.7 LAdmitted-Fee/PreQual/Technical/Finance | -28.25% | ₹2.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Not Admitted-Fee/PreQual/Technical/Finance ANANTNAG ANANTNAG JAMMU AND KASHMIR | ANANTNAG | JAMMU AND KASHMIR | 192101 | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Deficiency of additionality security performance |
Tender Value
₹3.8 L
EMD Value
₹7,520
Closing Date
15 Jul 2026, 4:00 pmClosed
Executive Engineer
Irrigation Division Shopian
Construction of lining protection wall on Awneera Canal land of Mohd Hussain Bhat and others at Yaripora
2026_IFC_315232_4
e-NIT 16 of 2026-27
Open Tender
Civil Works
Percentage
20 days
Shopian
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer
₹7,520
18 Jul 2026
9 Jul 2026
16 Jul 2026
9 Jul 2026
15 Jul 2026
9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil | 28.35 | Cum | 187.3 | ₹5,309.96 |
| 2 | Dumping stone excluding cost of stones. in Horizontal on level | 5.88 | Cum | 237.9 | ₹1,398.85 |
| 3 | Supply of Nallah Stones | 5.88 | Cum | 700 | ₹4,116 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 3.92 | Cum | 5,202.9 | ₹20,395.37 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 37.8 | Cum | 6,591.25 | ₹2,49,149.25 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 168 | sqm | 286.35 | ₹48,106.8 |
| 7 | Carriage of material by Mechanical Transport .
Cement avg. lead of 05km | 13.62 | MT | 178.43 | ₹2,430.22 |
| 7.01 | Sand and crussed Agg. Lead of 20Kms | 52.69 | Cum | 409.94 | ₹21,599.74 |
| 7.02 | 40 mm agg. Avg. lead of 20 kms | 3.5 | Cum | 445.64 | ₹1,559.74 |
| 7.03 | Stone soleing avg. of 05kms | 5.88 | Cum | 236.16 | ₹1,388.62 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_1021899.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .