Loading…
Loading…
Tender Value
₹1.3 Cr
EMD Value
₹2.5 L
Closing Date
29 Sept 2026, 10:00 am2d left
Executive Engineer Harike Canal Division ferozepur
Executive Engineer Harike Canal Division ferozepur
Estimate for Rehabilitation of Kasubegu Distributary from RD 0 to RD 24650 by repairing brick-lining patches and other associated works, including construction of Head Regulators of Shehzadi Minor and Malwal Minor.
2026_WR_174147_1
0013/Harike Canal Division/2026-27
Open Tender
Civil Works - Canal
Item Rate
Executive Engineer Harike Canal Division ferozepur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹2.5 L
Executive Engineer Harike Canal Division ferozepur
29 Sept 2026
25 Aug 2026
29 Sept 2026
25 Aug 2026
29 Sept 2026
25 Aug 2026
4 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Ordinary jungle clearance of both banks of running distributaries, minors and drains with discharge upto 9cum/s including boundary road a) Discharge upto 1.5 cum/s | 1 | Km | - | - |
| 2 | Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads. | 1 | Cum | - | - |
| 3 | Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. | 1 | Cum | - | - |
| 4 | Rehandling of earth work with average lead 15 mtr complete in all respect, as per instruction of the engineer incharge. The work maye be executed manually or by machinery. | 1 | Cum | - | - |
| 5 | Dismantling of existing brick lining or coping of canal including loading, unloading, carriage and disposal of dismantled materials with all leads and lifts. | 1 | cum | - | - |
| 6 | Extra for laying earth as per specifications for compaction in 200 mm layers & compacted to about 150 mm, watering, rolling and compaction complete in all respect, as per drawings, design, specifications & the instructions of the Engineer incharge. | 1 | Cum | - | - |
| 7 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | 1 | Cum | - | - |
| 8 | Earth work for lip cutting for lining of irrigation channels inclusive of all allowances, lead and dressing (0 m to 1.5m) | 1 | cum | - | - |
| 9 | Dressing of side slopes and preparation of sub grade for lining complete in all respect, as per drawings, design, specifications & the instructions of the Engineer incharge | 1 | Sqm | - | - |
| 10 | Putting 1:3 (Cement:water) cement slurry with cement @ 2.25 kg per sqm on prepared bed and side slopes before laying concrete on bed and side slopes | 1 | Sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
SBD_24650.pdf
Tender Documents • 1.75 MB
BOQ_354461.xls
BOQ • 0.27 MB
corri13.pdf
PDF • 0.58 MB
corri13_2.pdf
PDF • 0.58 MB
corri13_1.pdf
PDF • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .