Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 3 605 G F 105 SECTOR 3 VASUNDHARA GHAZIABAD UTTAR PRADESH 201012 | GHAZIABAD | UTTAR PRADESH | 201012 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
5 Apr 2023, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer, EDC, Hapur
Superintending Engineer, EDC, Hapur
Construction of new additional DP in Business Plan in area of EDD-I/II Hapur and garh, under EDC- Hapur
2023_PVVNL_791186_1
106(W)/EDCH/2022-23
Open Tender
Electrical Works
Lump-sum
Hapur
enclosed
3 documents required · 3 mandatory
₹1,180
SE, EDC, Hapur
₹5,000
6 Apr 2023
29 Mar 2023
5 Apr 2023
29 Mar 2023
5 Apr 2023
29 Mar 2023
Amount
Increasing Capacity of 10 to 25KVA at various places as per sanctioned estimate. (All work will be completed as per sanctioned estimate).
Carriage of line material (Like: clamps, channel, conductor etc.) from Electricity Store Center, Hapur to site of work with loading and unloading at both ends on Kachha Packka road.
Carriage of PCC Pole 8.5 mtrs. Long from Electricity store center, Hapur/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road.
Opening of the Jumper of LT & HT side at Double Pole.
Safely Removal of old 10KVA Transformer from Existing Pole and opening of all accessories.
Carriage of old 25KVA transformer from JE Store/CTR/ESC, Hapur to site of work and safley unloading the same.
Fabrication, erection and fixing of double pole on PCC Pole 8.5 mtr. long (01No. Pole Existing) with fixing of M.S. Top & Dropper Channel, M.S. S/S Angle, E-Bracket, 11 KV Pin insulator with Pin, Disc Insulator with Disc fitting as per RESPO Drawing/Norms by providing top and dropper clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts.
Mounting, Placing and connecting from LT/HT side of 11KV, 25KVA T/F as per RESPO Norms.
Laying of LT XLPE Cable 3.5x70Sqmm., and completion of work properly as per RESPO/Norms.
Grouting & fixing of stay rods (20x1800)mm including all work of excavation, cement concrete in size (0.60x0.60x0.30)m in ratio 1:4:8 cement, sand, 40mm brick ballast as per drg. Including back filling, proper ramming etc and fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing as per RESPO Drawing/Norms by providing all grouting material and stay clamp made of M.S. Flat of size 50x6mm with proper size bolts & nuts & loops.
Earthing of supports with MS earth Rod of (20x2500)mm long including excavation of pit and driving M.S. Rod 3.0 M apart from support and 0.5m below the ground level and connection below the earth electrodes with the help of G.I. wire & earthing lugs as per RESPO Drawing/Norms by providing proper size nuts & bolts.
Grouting of ST/PCC supports in CC 1:4:8 (Cement, sand & 40mm brick ballast) Grouting will be done in the block of size (450x450)mm x1/6th of full length of the support, up to ground level, 300mm plinth above the ground level with CC 1:3:6 (Cement, core sand and Stone grit) with mufting as per drawing, work includes back filling & proper ramming by providing all required grouting materials.
Laying , Stringing and final sagging of ACSR Weasel Conductor after binding from Insulator, as per RESPO/Drawing Norms.
Carriage of old 10KVA transformer from site of work to JE Store/CTR/ESC, Hapur and safley unloading the same.
Constuction of new additional D/P of 25, 63, & 100 KVA T/F at various places as per sanctioned estimate.
Carriage of line material (Like: clamps, channel, conductor etc.) from Electricity Store Center, Hapur to site of work with loading and unloading at both ends on Kachha Packka road.
Carriage of PCC Pole 8.5 mtrs. Long from Electricity store center, Hapur/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road.
Carriage of Single Phase Distribution Box from Electricity store center, Hapur to site of work with loading and unloading at both ends on Kachha Packka road.
Carriage of Three Phase Distribution Box from Electricity store center, Hapur to site of work with loading and unloading at both ends on Kachha Packka road.
Carriage of old 25KVA transformer from JE Store/CTR/ESC, Hapur to site of work and safley unloading the same.
Carriage of old 63KVA transformer from JE Store/CTR/ESC, Hapur to site of work and safley unloading the same.
Carriage of old 100KVA transformer from JE Store/CTR/ESC, Hapur to site of work and safley unloading the same.
Erection & Fixing of PCC Pole 8.5 mtr. long in 11 KV line after digging of suitable pits including fixing of requisite accessories as per RESPO Drawing/Norms by providing F-Bracket made of M.S. Flat of size 50x6 mm, Cross Arm holding Clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts.
Erection & fixing of PCC pole 8.5 mtr. in L.T. Line after digging of suitable pits including fixing of all accessories by providing L.T. Pin Clamp made of M.S. Flat of size 50x6mm & Shackle Insulator of size 90x75 mm & proper size nuts and bolts as per RESPO Drawing/Norms.
Fabrication, erection and fixing of double pole on PCC Pole 8.5 mtr. long with fixing of M.S. Top & Dropper Channel, M.S. S/S Angle, E-Bracket, 11 KV Pin insulator with Pin, Disc Insulator with Disc fitting as per RESPO Drawing/Norms by providing top and dropper clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts.
Laying of ABC Cable (3x120+1x95+1x16)+ (3x95+1x70+1x16) Sqmm., and completion of work properly as per RESPO/Norms.
Laying of overhead 11KV XLPE Cable 3x70sqmm, as per RESPO/Norms.
Making and filling of 11KV Cable Jointing Kit 3x70Sqmm, after duly plumbing and taping of suitable XLPE Cable, providing, fixing and crimping of proper size good quality lugs, including cost of lugs and tape etc., as per RESPO Norms.
Laying, Stringing and final sagging of ACSR Weasl Conductor after binding from Insulator, as per RESPO/Drawing Norms.
Mounting, Placing and connecting from LT/HT side of 11KV, 25KVA T/F as per RESPO Norms.
Mounting, Placing and connecting from LT/HT side of 11KV, 63KVA T/F as per RESPO Norms.
Mounting, Placing and connecting from LT/HT side of 11KV, 100KVA T/F as per RESPO Norms.
Installation of Single Phase Distribution Box, including fixing of all accessories by providing all required materials (like suitable clamps, nuts & bolts etc.) as per RESPO/Drawing Norms.
Installation of Three Phase Distribution Box, including fixing of all accessories by providing all required materials (like suitable clamps, nuts & bolts etc.) as per RESPO/Drawing Norms.
Earthing of supports with MS earth Rod of (20x2500)mm long including excavation of pit and driving M.S. Rod 3.0 M apart from support and 0.5m below the ground level and connection below the earth electrodes with the help of G.I. wire & earthing lugs as per RESPO Drawing/Norms by providing proper size nuts & bolts.
Grouting of ST/PCC supports in CC 1:4:8 (Cement, sand & 40mm brick ballast) Grouting will be done in the block of size (450x450)mm x1/6th of full length of the support, up to ground level, 300mm plinth above the ground level with CC 1:3:6 (Cement, core sand and Stone grit) with mufting as per drawing, work includes back filling & proper ramming by providing all required grouting materials.
Grouting & fixing of stay rods (20x1800)mm including all work of excavation, cement concrete in size (0.60x0.60x0.30)m in ratio 1:4:8 cement, sand, 40mm brick ballast as per drg. Including back filling, proper ramming etc and fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing as per RESPO Drawing/Norms by providing all grouting material and stay clamp made of M.S. Flat of size 50x6mm with proper size bolts & nuts & loops.
Providing and fixing of Dead End Clamps and completion work properly as per RESPO/Norms.
Providing and fixing of Piercing Connector and completion work properly as per RESPO/Norms.
Erection & Fixing of 11KV. Fuse set on ST Pole 11mtr long, by providing all required materials, including cost of 11KV Fuse set.
Erection & Fixing of 11KV. TPMO set on ST Pole 11mtr long, by providing all required materials, including cost of 11KV TPMO Set.
AAYANSH ELECTRICAL SOLUTIONS
M S Electricals
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .