Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹25.5 L+₹56,104.84 (2.25%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹25.8 L+₹83,583.44 (3.35%)Rejected-AOC M0 NO 211 AWAS VIKAS COLONY POLICE STATION KOTWALI KATRA TEHSIL SADAR DISTRICT MIRZAPUR | L3 | Rejected-AOC L3 | |
| 4 | L4₹26.8 L+₹1.8 L (7.32%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹33.0 L+₹8.1 L (32.3%)Rejected-AOC 11 13 7 TASKAND ROAD CIVIL LINES PRAYAGRAJ | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | M/s Shiv Shakti Constructon L1 | a.k. construction L5 | M/S BADRI SINGH L3 | PANDEY ENTERPRISES L4 | MANJU L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Site Clearence for constructing stream including all leads and lifts, labour charges, T& P etc. required for proper completion of work and its disposal as per direction of Engineer-in-charge. | 64 | sqm | 2.51 ₹160.64 Lowest | 3.4 ₹217.6 | 3.4 ₹217.6 | 3.4 ₹217.6 | 3 ₹192 |
| 2.00 | Earth work in excavation of foundation in all types of soil including all leads and lifts, labour charges, T& P etc. required for proper completion of work and its disposal as per direction of Engineer-in-charge. | 5,857.58 | cum | 120 ₹7,02,909.6 | 167 ₹9,78,215.86 | 100 ₹5,85,758 Lowest | 155 ₹9,07,924.9 | 140 ₹8,20,061.2 |
| 3.00 | Laying C.C. 1:3:6 (M–10) in Foundation with cement, coarse sand of F.M. not less than 2.00 and hard stone ballast as obtained from the excavation of foundation including cost of all material, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge. | 46.52 | cum | 4,250 ₹1,97,710 | 5,758 ₹2,67,862.16 | 5,000 ₹2,32,600 | 4,000 ₹1,86,080 Lowest | 4,500 ₹2,09,340 |
| 4.00 | Laying C.C. 1:2:4 (M–15) in raft with cement, coarse sand of F.M. not less than 2.00 and hard stone ballast as obtained from the excavation of foundation including cost of all material, labour, T&P etc. required for proper completion of work. | 7.28 | cum | 4,873 ₹35,475.44 | 6,597 ₹48,026.16 | 6,000 ₹43,680 | 4,500 ₹32,760 Lowest | 6,000 ₹43,680 |
| 5.00 | Centering & shuttering for C.C./R.C.C. work in different parts of structure as below including cost of all materials, labour, T&P etc. required for proper completion of work. | 25.29 | sqm | 166 ₹4,198.14 | 225 ₹5,690.25 | 150 ₹3,793.5 Lowest | 225 ₹5,690.25 | 150 ₹3,793.5 Lowest |
| 6.00 | Laying R.C.C. (M–20) with cement, coarse sand of F.M. not less than 2.00 and crushed hard stone grit including cost of all material, labour, T&P etc. required for proper completion of work but excluding cost of reinforcement, centering and shuttering. in construction of different parts of structure. | 3.88 | cum | 5,412 ₹20,998.56 Lowest | 7,326 ₹28,424.88 | 6,500 ₹25,220 | 7,326.71 ₹28,427.64 | 6,500 ₹25,220 |
| 7.00 | Carriage, Cutting, Bending, Binding and placing steel for reinforcement with cost of binding wire including cost of all materials, labour, T&P etc. required for proper completion of work. | 0.15 | MT | 51,988 ₹7,902.18 | 70,368 ₹10,695.94 | 40,000 ₹6,080 | 70,359 ₹10,694.57 | 7,000 ₹1,064 Lowest |
| 8.00 | Providing and fixing 1200 mm. Dia HUME Pipe including cost of all materials, labours, T&P etc, required for proper completion of work. | 7.5 | RM | 5,006 ₹37,545 | 6,776 ₹50,820 | 6,000 ₹45,000 | 4,500 ₹33,750 Lowest | 6,100 ₹45,750 |
| 9.00 | Earth work in filling in embankment including all leads and lift, cost of soil, labour charges, manual compaction and T&P etc. with including proper dressing. | 78.88 | cum | 155 ₹12,226.4 | 200 ₹15,776 | 150 ₹11,832 Lowest | 201.75 ₹15,914.04 | 150 ₹11,832 Lowest |
| 10.00 | Supplying and laying Local sand on Top of pipe including cost of all materials, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge. | 66.49 | cum | 750 ₹49,867.5 | 1,002 ₹66,622.98 | 800 ₹53,192 | 450 ₹29,920.5 Lowest | 1,000 ₹66,490 |
Tender Value
Refer Docs
EMD Value
₹67,000
Closing Date
25 Nov 2025, 3:00 pmClosed
Executive Engineer
KCD-2 PIPRI SONBHADRA
Construction of Pipe Culvert on road with drain diversion of drain at Up stream of 14.700 RKC to drain at Up stream of 14.950 RKC
2025_UPIDC_1091340_1
07/EE/2025-26/LOT-1
Open Tender
Civil Works
Item Wise
90 days
village Jampani (Bom-Chhatpur village road) Duddhi
Please refer tender document
2 documents required · 2 mandatory
₹1,180
₹67,000
20 Dec 2025
17 Nov 2025
25 Nov 2025
17 Nov 2025
25 Nov 2025
17 Nov 2025
Amount
Site Clearence for constructing stream including all leads and lifts, labour charges, T& P etc. required for proper completion of work and its disposal as per direction of Engineer-in-charge.
Earth work in excavation of foundation in all types of soil including all leads and lifts, labour charges, T& P etc. required for proper completion of work and its disposal as per direction of Engineer-in-charge.
Laying C.C. 1:3:6 (M–10) in Foundation with cement, coarse sand of F.M. not less than 2.00 and hard stone ballast as obtained from the excavation of foundation including cost of all material, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge.
Laying C.C. 1:2:4 (M–15) in raft with cement, coarse sand of F.M. not less than 2.00 and hard stone ballast as obtained from the excavation of foundation including cost of all material, labour, T&P etc. required for proper completion of work.
Centering & shuttering for C.C./R.C.C. work in different parts of structure as below including cost of all materials, labour, T&P etc. required for proper completion of work.
Laying R.C.C. (M–20) with cement, coarse sand of F.M. not less than 2.00 and crushed hard stone grit including cost of all material, labour, T&P etc. required for proper completion of work but excluding cost of reinforcement, centering and shuttering. in construction of different parts of structure.
Carriage, Cutting, Bending, Binding and placing steel for reinforcement with cost of binding wire including cost of all materials, labour, T&P etc. required for proper completion of work.
Providing and fixing 1200 mm. Dia HUME Pipe including cost of all materials, labours, T&P etc, required for proper completion of work.
Earth work in filling in embankment including all leads and lift, cost of soil, labour charges, manual compaction and T&P etc. with including proper dressing.
Supplying and laying Local sand on Top of pipe including cost of all materials, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge.
Random rubble stone masonery in 1:4 cement (OPC 43 grade) and sand mortar including all leads and lift, cost of soil, labour charges, manual compaction and T&P etc. for Proper Completion of work.
Raised pointing work for exposed surface of stone masonry in 1:2cm with cement OPC-43 grade, sand etc. including all leads and lift, cost of soil, labour charges, manual compaction and T&P etc. for Proper Completion of work.
Proviniding and fixing 100mm dia PVC pipe including cost of all material, labours, T&P, etc. required for proper completion of the work.
Dewatering of Foundation by hiring diesel pump 5 HP/Electric motor of same capacity including operator cost, cost of dewatering equipment and its accessories, labour etc.
MANJU (BID ID -5699554)
M/S BADRI SINGH (BID ID -5701854)
PANDEY ENTERPRISES (BID ID -5702021)
a.k. construction (BID ID -5693348)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
TenderLot1.pdf
Tender Documents • 0.68 MB
BOQ_2004774.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .