| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹97.5 LAccepted-AOC | ₹97.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹97.5 L+₹444.29 (<0.01%)Rejected-AOC | ₹97.5 L+₹444.29 (<0.01%) | L2 | Rejected-AOC L2 |
| 3 | L3₹97.5 L+₹592.38 (<0.01%)Rejected-AOC | ₹97.5 L+₹592.38 (<0.01%) | L3 | Rejected-AOC L3 |
Tender Value
₹97.5 L
EMD Value
₹2.0 L
Closing Date
21 Jan 2023, 4:00 pmClosed
EE(Pt-II) IMC
Office of the Executive Engineer(Pt-II),IMC Opposite Energy Park,Itanagar
C/o Box Culvert with retaining wall at Nirjuly village-II to Yogin village ,C/o Formation cutting of road with retaining wall at Nirjuly village-II to Hosh Village via Bichom, C/O Box Cutting with retaining wall at Nirjuly village-II to Bichom vill
2023_IMCAP_1065_1
IMC/EE(Pt-II)/15 FC/RFP/NIT-251/22-23/39
Open Tender
Civil Works
Item Rate
90 days
Nirjuli
Refer Tender Document
2 documents required · 2 mandatory
₹10,000
Yes
EE(Pt-II) IMC
₹2.0 L
Yes
2 Feb 2023
16 Jan 2023
23 Jan 2023
16 Jan 2023
21 Jan 2023
16 Jan 2023
16 Jan 2023 - 18 Jan 2023
Amount
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to be extent required and utilising the remaining earth locally for road work). (i) Ordinary soil Manual Means (Depth upto 3 m)
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Coursed rubble masonry (first sort )
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification. (A)RCC Grade M20. Using Concrete Mixer. For solid slab super-structure, 20-30% of (a+b+c). (B) Height upto 5m
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification a) Granular material
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification.
Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m.
Providing and laying in foundations and plinth cement concrete 1 : 3 : 6 (1cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
Centring and shuttering including strutting proping etc. and removal of form work for: a) Footing in foundation
b) For walls
Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in : (b)1 : 1.5 : 3 (1 cement : 1.5 coarse sanda) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size) : 3 stone aggregate 20 mm nominal size).
Reinforced cement concrete in walls (any thickness) including attached pilasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding co(b)1 : 1.5:3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).st of centring, shuttering and reinforcement in :
Reinforcement of RCC work including bending, binding and placing in position complete. b) Tar/ TMT steel
Providing weep holes in Brick masonry/Plain/Reinforced concrete concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification B) Sandy material
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to be extent required and utilising the remaining earth locally for road work). (i)Ordinary soil Manual Means (Depth upto 3 m)
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Coursed rubble masonry (first sort )
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification. (A). RCC Grade M20. Using Concrete Mixer. For solid slab super-structure, 20-30% of (a+b+c). (B) Height upto 5m
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification a) Granular material
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification.
Excavation in Hilly Areas in Soil by Manual Means (Excavation in soil in Hilly Area by Manual Means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per drawing and Technical Specification Clause 1603.1)
Excavation in Hilly Area in Ordinary Rock by Manual Means (Excavation in Ordinary Rock using Manual Means including loading in a truck and carrying of excavated material to embankment site with a lift upto 1.5 m and lead upto 20 m as per Clause 1603.2.)
Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m.
Providing and laying in foundations and plinth cement concrete 1 : 3 : 6 (1cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
Centring and shuttering including strutting proping etc. and removal of form work for: a) Footing in foundation
b) For walls
Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in : (b)1 : 1.5 : 3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)
Reinforced cement concrete in walls (any thickness) including attached pilasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in :(b)1 : 1.5:3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
Reinforcement of RCC work including bending, binding and placing in position complete.b) Tar/ TMT steel
Providing weep holes in Brick masonry/Plain/Reinforced concrete concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification B) Sandy material
DOnyi Lella Enterprises
M/s R Y Z J Enterprises
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1174.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .