Loading…
Loading…
Tender Value
₹93.5 L
EMD Value
₹1.9 L
Closing Date
27 Oct 2026, 3:00 pm
DC ENGR SHQ HGI ITBP
OFFICE OF THE DIG SHQ HGI
Construction of FSB at Bara Camp Goying in Kilo 4 Axis (Location is Approx. 35 Km away From Last Road Head HOTAR) under AOR OF 60 BN ITBP (Ar.P
2026_ITBP_928696_1
NO-1040-47 DTD-01/10/2026
Open Tender
Civil Works - Bridges
Percentage
360 days
Location is 35 Km away From Last Road Head HOTAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.9 L
5 Oct 2026
5 Oct 2026
28 Oct 2026
5 Oct 2026
27 Oct 2026
5 Oct 2026
5 Oct 2026 - 27 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. (AOR 1997, Vol-I Item 2.6.1) All kinds of soil | 116.09 | cum | 669.13 | ₹77,679.3 |
| 2.01 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-Ill) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | 3.4 | cum | 47,370.51 | ₹1,61,059.73 |
| 3.01 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3(1 cement: 1.5 coarse sand (zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 20.29 | cum | 1,27,815.18 | ₹25,93,370 |
| 4.01 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 13.9 | cum | 1,29,375.92 | ₹17,98,325.29 |
| 5.01 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 55.2 | sqm | 441.21 | ₹24,354.79 |
| 6.01 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers | 6.24 | sqm | 1,010.56 | ₹6,305.89 |
| 7.01 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 74.74 | sqm | 987.94 | ₹73,838.64 |
| 8.01 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1,752.04 | Kg | 447.63 | ₹7,84,266.56 |
| 9.01 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1,200.27 | Kg | 447.63 | ₹5,37,274.62 |
| 10.01 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 891.79 | Kg | 449.33 | ₹4,00,708 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_975958.xls
BOQ • 0.30 MB
TDBERACAMPGOYING.pdf
Tender Documents • 5.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .