| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-AOC | ₹2.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.6 CrRejected-Finance | ₹2.6 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹2.8 CrRejected-Finance M0 NO 211 AWAS VIKAS COLONY POLICE STATION KOTWALI KATRA TEHSIL SADAR DISTRICT MIRZAPUR | ₹2.8 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹3.2 CrRejected-Finance 14 15 VINAY NAGAR VIJITEM PUBLIC SCHOOL QUARSI RAMGHAT ROAD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹3.2 Cr | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | M/S BADRI SINGH L3 | m/s VIJAY CONSTRUTION L2 | GOMATINETRA CONSTRUCTIONS L4 | VINAY KUMAR SINGH L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | E/W in cutting bed of canal including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge. | 8,283.4 | M3 | 50 ₹4.1 L | 44 ₹3.6 L | 56.75 ₹4.7 L | 45 ₹3.7 L |
| 2.00 | E/W in restoration & strengthening of bank's in all type of soil mixed with chharry, karail, black cotton soil or moorum mixed soil including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge. | 69,839.8 | M3 | 150 ₹1.0 Cr | 140 ₹97.8 L | 200.74 ₹1.4 Cr | 100 ₹69.8 L |
| 3.00 | Excavation of foundation and its back filling with all type of soil including labour, T&P etc. for proper completion of work as per direction of Engineer –in-Charge. | 3,299.43 | M3 | 50 ₹1.6 L | 70 ₹2.3 L | 94.86 ₹3.1 L | 90 ₹3.0 L |
| 4.00 | Laying C.C. M-10 (1:3:6) one part of cement three part of coarse sand F.M.>2.00 & six part of stone ballast (size 20 mm to 40 mm) including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 1,156.24 | M3 | 4,300 ₹49.7 L | 3,800 ₹43.9 L | 4,181.17 ₹48.3 L | 3,800 ₹43.9 L |
| 5.00 | C.R.S masonary in 1:3CM (one part of cement, three Part of coarse sand F.M. >2.00) including cost of labour, materials, T&P etc. For Proper completion of work as per direction of Engineer of in - charge. | 2,239.16 | M3 | 4,400 ₹98.5 L | 4,300 ₹96.3 L | 4,505.53 ₹1.0 Cr | 3,900 ₹87.3 L |
| 6.00 | Centering and shuttering of R.C.C. work including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 75.78 | M2 | 400 ₹30,312 | 500 ₹37,890 | 711.48 ₹53,915.95 | 700 ₹53,046 |
| 7.00 | Supplying & fixing 20mm thick joint filler board including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 10.72 | M2 | 500 ₹5,360 | 400 ₹4,288 | 923.23 ₹9,897.03 | 1,000 ₹10,720 |
| 8.00 | S/L 3mm thick multi-plast poly Plus Tar paper including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 14.33 | M2 | 50 ₹716.50 | 70 ₹1,003.10 | 59.29 ₹849.63 | 65 ₹931.45 |
| 9.00 | Reinforcement of RCC work including cost of steel, cutting, bending, placing in position & binding with 16 gauge binding wire including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 2.48 | M.T. | 62,000 ₹1.5 L | 62,000 ₹1.5 L | 55,640.28 ₹1.4 L | 64,000 ₹1.6 L |
| 10.00 | Laying R.C.C. M-20 (1:1.5:3) With cement, crushed grit size 10 mm to 20mm well graded including cost oflabour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 34.14 | M3 | 7,200 ₹2.5 L | 7,000 ₹2.4 L | 7,283.35 ₹2.5 L | 8,400 ₹2.9 L |
Tender Value
₹3.8 Cr
EMD Value
₹7.5 L
Closing Date
18 Mar 2026, 3:00 pmClosed
SE
SE IRRIIGATION WORK CIRCLE PRAYAGRAJ
Restoration of Pucca work of Belan main canal from Km. 53.600 to 58.800
2026_UPIDC_1124343_10
07/SE/2025-26
Open Tender
Civil Works
365 days
BMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹7.5 L
Yes
SE IRRIIGATION WORK CIRCLE PRAYAGRAJ
25 May 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
12 Mar 2026
E/W in cutting bed of canal including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge.
E/W in restoration & strengthening of bank's in all type of soil mixed with chharry, karail, black cotton soil or moorum mixed soil including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge.
Excavation of foundation and its back filling with all type of soil including labour, T&P etc. for proper completion of work as per direction of Engineer –in-Charge.
Laying C.C. M-10 (1:3:6) one part of cement three part of coarse sand F.M.>2.00 & six part of stone ballast (size 20 mm to 40 mm) including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
C.R.S masonary in 1:3CM (one part of cement, three Part of coarse sand F.M. >2.00) including cost of labour, materials, T&P etc. For Proper completion of work as per direction of Engineer of in - charge.
Centering and shuttering of R.C.C. work including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Supplying & fixing 20mm thick joint filler board including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
S/L 3mm thick multi-plast poly Plus Tar paper including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Reinforcement of RCC work including cost of steel, cutting, bending, placing in position & binding with 16 gauge binding wire including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Laying R.C.C. M-20 (1:1.5:3) With cement, crushed grit size 10 mm to 20mm well graded including cost oflabour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Laying C.C. M-20 (1:1.5:3) With cement, crushed grit size 10 mm to 20mm well graded including cost oflabour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Cement pointing 1:2 C.M. including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Dry stone boulder Pitching 200mm thick filling joint with sand including cost of labour, material, T&P etc. for proper completion of work as per direction of in- charge.
Colour washing of two coat of parapet including cost of all materials,labour and T&P etc.
Fixing wheel guard stone inclding cost of all of all materials, labours and T&P etc.
E/W In Embankment for restoration of canal section on Pucca structures Nearby in all type of soil mixed including all lead ,lift dressing , etc.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_2095335.xls
BOQ • 0.26 MB
belanDOC.pdf
Tender Documents • 2.60 MB
Download all tender documents and submit your bid