| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-AOC | ₹2.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.6 Cr+₹32.3 L (14.1%)Rejected-Finance | ₹2.6 Cr+₹32.3 L (14.1%) | L2 | Rejected-Finance L2 |
| 3 | L3₹2.8 Cr+₹48.4 L (21.0%)Rejected-Finance M0 NO 211 AWAS VIKAS COLONY POLICE STATION KOTWALI KATRA TEHSIL SADAR DISTRICT MIRZAPUR | ₹2.8 Cr+₹48.4 L (21.0%) | L3 | Rejected-Finance L3 |
| 4 | L4₹3.2 Cr+₹89.7 L (39.0%)Rejected-Finance 14 15 VINAY NAGAR VIJITEM PUBLIC SCHOOL QUARSI RAMGHAT ROAD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹3.2 Cr+₹89.7 L (39.0%) | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | M/S BADRI SINGH L3 | m/s VIJAY CONSTRUTION L2 | GOMATINETRA CONSTRUCTIONS L4 | VINAY KUMAR SINGH L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | E/W in cutting bed of canal including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge. | 8,283.4 | M3 | 50 ₹4,14,170 | 44 ₹3,64,469.6 Lowest | 56.75 ₹4,70,082.95 | 45 ₹3,72,753 |
| 2.00 | E/W in restoration & strengthening of bank's in all type of soil mixed with chharry, karail, black cotton soil or moorum mixed soil including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge. | 69,839.8 | M3 | 150 ₹1,04,75,970 | 140 ₹97,77,572 | 200.74 ₹1,40,19,641.45 | 100 ₹69,83,980 Lowest |
| 3.00 | Excavation of foundation and its back filling with all type of soil including labour, T&P etc. for proper completion of work as per direction of Engineer –in-Charge. | 3,299.43 | M3 | 50 ₹1,64,971.5 Lowest | 70 ₹2,30,960.1 | 94.86 ₹3,12,983.93 | 90 ₹2,96,948.7 |
| 4.00 | Laying C.C. M-10 (1:3:6) one part of cement three part of coarse sand F.M.>2.00 & six part of stone ballast (size 20 mm to 40 mm) including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 1,156.24 | M3 | 4,300 ₹49,71,832 | 3,800 ₹43,93,712 Lowest | 4,181.17 ₹48,34,436 | 3,800 ₹43,93,712 Lowest |
| 5.00 | C.R.S masonary in 1:3CM (one part of cement, three Part of coarse sand F.M. >2.00) including cost of labour, materials, T&P etc. For Proper completion of work as per direction of Engineer of in - charge. | 2,239.16 | M3 | 4,400 ₹98,52,304 | 4,300 ₹96,28,388 | 4,505.53 ₹1,00,88,602.55 | 3,900 ₹87,32,724 Lowest |
| 6.00 | Centering and shuttering of R.C.C. work including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 75.78 | M2 | 400 ₹30,312 Lowest | 500 ₹37,890 | 711.48 ₹53,915.95 | 700 ₹53,046 |
| 7.00 | Supplying & fixing 20mm thick joint filler board including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 10.72 | M2 | 500 ₹5,360 | 400 ₹4,288 Lowest | 923.23 ₹9,897.03 | 1,000 ₹10,720 |
| 8.00 | S/L 3mm thick multi-plast poly Plus Tar paper including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 14.33 | M2 | 50 ₹716.5 Lowest | 70 ₹1,003.1 | 59.29 ₹849.63 | 65 ₹931.45 |
| 9.00 | Reinforcement of RCC work including cost of steel, cutting, bending, placing in position & binding with 16 gauge binding wire including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 2.48 | M.T. | 62,000 ₹1,53,760 | 62,000 ₹1,53,760 | 55,640.28 ₹1,37,987.89 Lowest | 64,000 ₹1,58,720 |
| 10.00 | Laying R.C.C. M-20 (1:1.5:3) With cement, crushed grit size 10 mm to 20mm well graded including cost oflabour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 34.14 | M3 | 7,200 ₹2,45,808 | 7,000 ₹2,38,980 Lowest | 7,283.35 ₹2,48,653.57 | 8,400 ₹2,86,776 |
Tender Value
₹3.8 Cr
EMD Value
₹7.5 L
Closing Date
18 Mar 2026, 3:00 pmClosed
SE
SE IRRIIGATION WORK CIRCLE PRAYAGRAJ
Restoration of Pucca work of Belan main canal from Km. 53.600 to 58.800
2026_UPIDC_1124343_10
07/SE/2025-26
Open Tender
Civil Works
Item Wise
365 days
BMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹7.5 L
Yes
SE IRRIIGATION WORK CIRCLE PRAYAGRAJ
25 May 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
12 Mar 2026
E/W in cutting bed of canal including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge.
E/W in restoration & strengthening of bank's in all type of soil mixed with chharry, karail, black cotton soil or moorum mixed soil including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge.
Excavation of foundation and its back filling with all type of soil including labour, T&P etc. for proper completion of work as per direction of Engineer –in-Charge.
Laying C.C. M-10 (1:3:6) one part of cement three part of coarse sand F.M.>2.00 & six part of stone ballast (size 20 mm to 40 mm) including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
C.R.S masonary in 1:3CM (one part of cement, three Part of coarse sand F.M. >2.00) including cost of labour, materials, T&P etc. For Proper completion of work as per direction of Engineer of in - charge.
Centering and shuttering of R.C.C. work including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Supplying & fixing 20mm thick joint filler board including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
S/L 3mm thick multi-plast poly Plus Tar paper including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Reinforcement of RCC work including cost of steel, cutting, bending, placing in position & binding with 16 gauge binding wire including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Laying R.C.C. M-20 (1:1.5:3) With cement, crushed grit size 10 mm to 20mm well graded including cost oflabour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Laying C.C. M-20 (1:1.5:3) With cement, crushed grit size 10 mm to 20mm well graded including cost oflabour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Cement pointing 1:2 C.M. including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Dry stone boulder Pitching 200mm thick filling joint with sand including cost of labour, material, T&P etc. for proper completion of work as per direction of in- charge.
Colour washing of two coat of parapet including cost of all materials,labour and T&P etc.
Fixing wheel guard stone inclding cost of all of all materials, labours and T&P etc.
E/W In Embankment for restoration of canal section on Pucca structures Nearby in all type of soil mixed including all lead ,lift dressing , etc.
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_2095335.xls
BOQ • 0.26 MB
belanDOC.pdf
Tender Documents • 2.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .