| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAccepted-AOC | ₹4.5 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹4.5 L+₹1,304.51 (0.29%)Rejected-Finance | ₹4.5 L+₹1,304.51 (0.29%) | L2 | Rejected-Finance Quoted Higher than Estimate Rate |
| Sl No | Description | Qty | Unit | GOVINDHASAMY L1 | EBK Constructions L2 |
|---|---|---|---|---|---|
| 1.00Construction of Compound Wall PUM School at Cheyyatraivendran Panchayat Under General Fund 2025-2026 | |||||
| 1.01 | Earth work excavation and depositing on bank with initial lead and lift and complete for foundation retaining wall alround | 21 | cu.m | 265 ₹5,565 Lowest | 267 ₹5,607 |
| 1.02 | Base course concrete with C.C.1:4:8 mix using 40mm I.S.S. size HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing for base course as per standared specification. | 2.57 | cu.m | 5,500 ₹14,135 Lowest | 5,505 ₹14,147.85 |
| 1.03 | Supply, fabrication and placing of reinforcement steel of high yield strength ribbed bars of various diameters and grade conforming to IS 1786 for reinforced concrete work. The work includes recoiling, straightening, cutting, bending, fabricating, and placing in position, at all levels including lead and lift, according to drawings, specifications etc. complete and supply & use of 18G black annealed binding wire double fold to tie the bars in position and providing precast cement/ PVC cover blocks for main reinforcement to ensure specified cover and complete., including all labor charges etc as directed by departmental officers. | 0.9 | Mt | 91,885 ₹82,788.39 Lowest | 91,888 ₹82,791.09 |
| 1.04Supplying and erecting centring for sides and suffits including supports and structing upto 3.29m height for plane surface in all cross bracting using MS sheets of size 90 x 60cm and 10kg stiffened with angle of size 25 x 25 x 3mm for boarding laid over s | |||||
| 1.05 | Below GL | 34.47 | sqm | 545 ₹18,786.15 Lowest | 548 ₹18,889.56 |
| 1.06 | Above GL | 24.57 | sqm | 1,095 ₹26,904.15 Lowest | 1,098 ₹26,977.86 |
| 1.07 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 11.17 | cu.m | 7,503 ₹83,808.51 Lowest | 7,505 ₹83,830.85 |
| 1.08 | Brick work in following Cement Mortar 1:5 using best quality II class table moulded bricks 8"3/4 x 41/4" X23/4" for foundation and basement including curing etc.,complete complying with standard specification.including scaffolding curing cost of reinforcement etc.all complete as per specifications and drawings as directed by the Engineer in-charge. | 8.93 | cu.m | 6,120 ₹54,651.6 Lowest | 6,122 ₹54,669.46 |
| 1.09 | Providing & applying 12 mm thick cement plaster in CM 1:5 (1 part of cement: 5 parts of sand) to walls internally in single coat at all levels to correct line and level including chicken wire mesh at all joints of brick and concrete surfaces with minimum overlap of 150 mm in all directions, scaffolding, rounding off or chambering of corners, offsets, fin/ bands, projections, etc. and cleaning of surface, raking out joints, roughening of surface, chiseling the undulated surface wherever necessary and curing, etc., all materials and labor complete in all respects including all lead, lift and descent and as directed. | 163.92 | sqm | 285 ₹46,717.2 Lowest | 288 ₹47,208.96 |
Tender Value
₹4.5 L
EMD Value
₹4,500
Closing Date
10 Nov 2025, 3:00 pmClosed
Block Development Officer
Block Development Office Anakkavoor
Construction of Compound Wall PUM School at Cheyyatraivendran Panchayat Under General Fund 2025-2026
2025_RDTN_619295_1
Roc. No. A6/565/2024 Date. 25.10.2025 ANK6
Open Tender
Civil Works - Others
Item Rate
90 days
Anakkavoor
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,500
12 Nov 2025
3 Nov 2025
10 Nov 2025
3 Nov 2025
10 Nov 2025
3 Nov 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
0.06 MB
BOQ
BOQ • 0.39 MB
Tender Documents
Tender Documents • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .