Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.5 LAdmitted-Finance | ₹12.5 L | L1 | Admitted-Finance |
| 2 | L2₹13.5 L+₹1.0 L (8.09%)Admitted-Finance | ₹13.5 L+₹1.0 L (8.09%) | L2 | Admitted-Finance |
| 3 | L3₹13.6 L+₹1.1 L (8.42%)Admitted-Finance | ₹13.6 L+₹1.1 L (8.42%) | L3 | Admitted-Finance |
| 4 | L4₹14.4 L+₹1.9 L (15.1%)Admitted-Finance | ₹14.4 L+₹1.9 L (15.1%) | L4 | Admitted-Finance |
| 5 | L5₹14.4 L+₹1.9 L (15.6%)Admitted-Finance | ₹14.4 L+₹1.9 L (15.6%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Vashista and Co L5 | M/s Anand Prakash Gupta L3 | RAJ KUMAR SHARMA L2 | RAKESH KUMAR SHARMA L1 | DROOM CONSTRUCTION L4 | R.P.SINGH L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Renovating lawns including weeding, cheeling the grass, forking the ground, top dressing with sludge or manure, mixing the same with forked soil, watering and maintaining the lawn for 30 days or more till the grass forms a thick lawn free from weeds and fit for mowing and disposal of rubbish as directed, including supplying of good earth if needed. (The cost of sludge, manure and good earth shall be paid for separately). | 5,261.1 | Sqm | 20 ₹1,05,222 Lowest | 40 ₹2,10,444 | 25 ₹1,31,527.5 | 60 ₹3,15,666 | 25 ₹1,31,527.5 | 35 ₹1,84,138.5 |
| 2.00 | Preparation of beds for hedging and shrubbery by excavating 60 cm deep and trenching the excavated base to a further depth of 30 cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 (8 parts of stacked volume of earth after reduction by 20% : one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth if necessary, watering and finally fine dressing, leveling etc. including stacking and disposal of materials declared unserviceable and surplus earth by spreading and leveling as directed, within a lead of 50 m, lift up to 1.5 m complete (cost of sludge, manure or extra earth to be paid for separately) For shrubs | 720 | cum | 200 ₹1,44,000 | 200 ₹1,44,000 | 180 ₹1,29,600 Lowest | 200 ₹1,44,000 | 200 ₹1,44,000 | 250 ₹1,80,000 |
| 3.00 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any with all leads and lift ( cost of manure , sludge or extra good earth if needed to be paid for separately)(Holes. 0.45m. dia and 0.45m. deep) | 2,000 | Each | 14 ₹28,000 | 20 ₹40,000 | 12 ₹24,000 | 10 ₹20,000 Lowest | 15 ₹30,000 | 18 ₹36,000 |
| 4.00 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. | 2,023.5 | cum | 300 ₹6,07,050 | 250 ₹5,05,875 | 250 ₹5,05,875 | 223 ₹4,51,240.5 Lowest | 400 ₹8,09,400 | 499 ₹10,09,726.5 |
| 5.00P/o Shrub Plants | |||||||||
| 5.10 | Providing and stacking of Bougainvillea (Variety Butiana, Lady Mary Baring, Mahara,Mohan,Scarlet Queen, Variegated, Glabra Formosa, Peruvian Odissi, Paratha, Subhra,Thimma, Spectabilis L.N Birla, Refulgence) plant of height 30 cm. to 45 cm. with 2-3 branches in 20 cm size of Earthen pot / Plastic pot as per direction of the officer-in-charge | 2,000 | Each | 50 ₹1,00,000 | 42 ₹84,000 | 40 ₹80,000 | 35 ₹70,000 | 50 ₹1,00,000 | 25 ₹50,000 Lowest |
| 5.20 | Providing and stacking of Nerium oleander variegated of height 60-75 cm., multibranched in earthen pot of size 25 cm as per direction of the officer-in-charge. | 2,000 | Each | 25 ₹50,000 | 43 ₹86,000 | 50 ₹1,00,000 | 28 ₹56,000 | 18 ₹36,000 Lowest | 25 ₹50,000 |
| 6.00P/o Hedge Plants | |||||||||
| 6.10 | Providing and stacking of Murraya exotica of height 45-60 cm. in poly bag of size 15 cm as per direction of the officer-in-charge. | 4,000 | Each | 20 ₹80,000 | 17 ₹68,000 | 25 ₹1,00,000 | 10 ₹40,000 Lowest | 15 ₹60,000 | 12 ₹48,000 |
| 7.00P/o Ground Covers | |||||||||
Tender Value
₹24.8 L
EMD Value
₹49,576
Closing Date
29 Jul 2026, 3:00 pmClosed
DD/HD-5/DDA
Horticulture Division-5, Rohini, Sector-10
Name of work Mo Various Schemes under NA -II under Hort Zone. i. Green Area near Govt Senior Secondary School, Sector 27, Rohini. ii. Green Area near Mandir Wala Park, Sector 27, Rohini. iii. 30 Meter wide Road at Sector 27, Rohini. Sub Head Renovati
2026_DDA_918612_1
21/DD/Hort.-V/DDA/2026-27
Open Tender
Agricultural or Forestry
Item Rate
45 days
Horticulture Division-5, Rohini, Sector-10
Please refer Tender documents.
11 documents required · 11 mandatory
₹0
₹49,576
3 Aug 2026
22 Jul 2026
30 Jul 2026
22 Jul 2026
29 Jul 2026
22 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Renovating lawns including weeding, cheeling the grass, forking the ground, top dressing with sludge or manure, mixing the same with forked soil, watering and maintaining the lawn for 30 days or more till the grass forms a thick lawn free from weeds and fit for mowing and disposal of rubbish as directed, including supplying of good earth if needed. (The cost of sludge, manure and good earth shall be paid for separately). | 5,261.1 | Sqm | - | - |
| 2 | Preparation of beds for hedging and shrubbery by excavating 60 cm deep and trenching the excavated base to a further depth of 30 cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 (8 parts of stacked volume of earth after reduction by 20% : one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth if necessary, watering and finally fine dressing, leveling etc. including stacking and disposal of materials declared unserviceable and surplus earth by spreading and leveling as directed, within a lead of 50 m, lift up to 1.5 m complete (cost of sludge, manure or extra earth to be paid for separately) For shrubs | 720 | cum | - | - |
| 3 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any with all leads and lift ( cost of manure , sludge or extra good earth if needed to be paid for separately)(Holes. 0.45m. dia and 0.45m. deep) | 2,000 | Each | - | - |
| 4 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. | 2,023.5 | cum | - | - |
| 5P/o Shrub Plants | |||||
| 5.1 | Providing and stacking of Bougainvillea (Variety Butiana, Lady Mary Baring, Mahara,Mohan,Scarlet Queen, Variegated, Glabra Formosa, Peruvian Odissi, Paratha, Subhra,Thimma, Spectabilis L.N Birla, Refulgence) plant of height 30 cm. to 45 cm. with 2-3 branches in 20 cm size of Earthen pot / Plastic pot as per direction of the officer-in-charge | 2,000 | Each | - | - |
| 5.2 | Providing and stacking of Nerium oleander variegated of height 60-75 cm., multibranched in earthen pot of size 25 cm as per direction of the officer-in-charge. | 2,000 | Each | - | - |
| 6P/o Hedge Plants | |||||
| 6.1 | Providing and stacking of Murraya exotica of height 45-60 cm. in poly bag of size 15 cm as per direction of the officer-in-charge. | 4,000 | Each | - | - |
| 7P/o Ground Covers | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
2478777NIT.pdf
Tender Documents • 2.12 MB
BOQ_965354.xls
BOQ • 0.31 MB
TC21.pdf
Additional Documents • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .