| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.6 LAccepted-Finance | ₹23.6 L | L1 | Accepted-Finance L1 |
| 2 | L2₹25.6 L+₹2.0 L (8.26%)Rejected-Finance 6 204 TIKONIYAN BELANGANJ AGRA | AGRA | AGRA | UTTAR PRADESH | ₹25.6 L+₹2.0 L (8.26%) | L2 | Rejected-Finance L2 |
| 3 | L3₹26.5 L+₹2.9 L (12.1%)Rejected-Finance | ₹26.5 L+₹2.9 L (12.1%) | L3 | Rejected-Finance L3 |
| 4 | L4₹26.6 L+₹3.0 L (12.5%)Rejected-Finance 13B ELLORA ENCLAVE DAYAL BAGH AGRA U P | AGRA | AGRA | UTTAR PRADESH | ₹26.6 L+₹3.0 L (12.5%) | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | M/s B.B.Goyal L2 | G.G.Earthmovers L3 | NIKHIL CONSTRUCTION L4 | M/S NEELKANTH ENGINEERS L1 |
|---|---|---|---|---|---|---|---|
| 1.01 | Providing and laying in position M-15 grade plain cement concrete (cement content considered @ 240Kg/cum) ready mixed plain cement concrete, with cement content as per approved design mix and manufactured in fully autometic batching plant and transported to site of work in transit mixer all leads, having continuous agitated mixer, manufactured ad per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS :9103 to accelerate/ retard setting of concrete, inprove workability without impairing strength and durability as per direction of the Engineer-in charage. All works upto plinth level:Note :1) Excess/ less cement used than specified in this item is payable/ recoverable separately. | 137 | M³ | 5,000 ₹6,85,000 | 5,250 ₹7,19,250 | 5,400 ₹7,39,800 | 4,500 ₹6,16,500 Lowest |
| 1.02 | Providing and laying in position M-25 grade ready mixed reinforcement cement concrete (cement content considered @ 330 Kg/cum) with cement content as per approved design mix and manufactured in fully autometic batching plant and transported to site of work in transit mixer all leads, having continuous agitated mixer, manufactured ad per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS :9103 to accelerate/ retard setting of concrete, inprove workability without impairing strength and durability as per direction of the Engineer-in charage. All works above plinth level to floor level: Note :1) Excess/ less cement used than specified in this item is payable/ recoverable separately. | 183 | M³ | 6,200 ₹11,34,600 | 6,450 ₹11,80,350 | 6,400 ₹11,71,200 | 6,000 ₹10,98,000 Lowest |
| 1.03 | Centering and shuttering including strutting, propping etc. and removal of form for columns Pillars Piers, Abutments, Posts and struts. | 82.5 | M2 | 700 ₹57,750 | 720 ₹59,400 | 710 ₹58,575 | 500 ₹41,250 Lowest |
| 1.04 | Centering and shuttering including strutting, propping etc. and removal of form for Foundation, footings, bases of columes etc. for mass concrete. | 29.4 | M2 | 525 ₹15,435 | 520 ₹15,288 | 510 ₹14,994 | 500 ₹14,700 Lowest |
| 1.05 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 9.1 | MT | 73,000 ₹6,64,300 | 74,000 ₹6,73,400 | 74,000 ₹6,73,400 | 65,000 ₹5,91,500 Lowest |
Tender Value
₹31.0 L
EMD Value
₹62,000
Closing Date
27 Jun 2026, 3:00 pmClosed
Executive Engineer
office of executive engineer head work division Agra canal Okhla
Repairing and Restoration of Damaged Road on Right Bank of Noida Main Drain in Between Km. 11.605 and Km. 11.703 in Distt. G.B. Nagar
2026_UPIDC_1161696_6
04/EE/2026-27
Open Tender
Civil Works
Item Rate
30 days
Between Km. 11.605 and Km. 11.703 in Distt. G.B. N
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹62,000
17 Jul 2026
20 Jun 2026
27 Jun 2026
20 Jun 2026
27 Jun 2026
20 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Providing and laying in position M-15 grade plain cement concrete (cement content considered @ 240Kg/cum) ready mixed plain cement concrete, with cement content as per approved design mix and manufactured in fully autometic batching plant and transported to site of work in transit mixer all leads, having continuous agitated mixer, manufactured ad per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS :9103 to accelerate/ retard setting of concrete, inprove workability without impairing strength and durability as per direction of the Engineer-in charage. All works upto plinth level:Note :1) Excess/ less cement used than specified in this item is payable/ recoverable separately. | 137 | M³ | - | - |
| 1.02 | Providing and laying in position M-25 grade ready mixed reinforcement cement concrete (cement content considered @ 330 Kg/cum) with cement content as per approved design mix and manufactured in fully autometic batching plant and transported to site of work in transit mixer all leads, having continuous agitated mixer, manufactured ad per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS :9103 to accelerate/ retard setting of concrete, inprove workability without impairing strength and durability as per direction of the Engineer-in charage. All works above plinth level to floor level: Note :1) Excess/ less cement used than specified in this item is payable/ recoverable separately. | 183 | M³ | - | - |
| 1.03 | Centering and shuttering including strutting, propping etc. and removal of form for columns Pillars Piers, Abutments, Posts and struts. | 82.5 | M2 | - | - |
| 1.04 | Centering and shuttering including strutting, propping etc. and removal of form for Foundation, footings, bases of columes etc. for mass concrete. | 29.4 | M2 | - | - |
| 1.05 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1 | MT | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
lot6.pdf
Tender Documents • 2.25 MB
BOQ_2177744.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .