| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 LAdmitted-Finance | ₹7.2 L | L1 | Admitted-Finance |
| 2 | L2₹8.4 L+₹1.2 L (16.0%)Admitted-Finance | ₹8.4 L+₹1.2 L (16.0%) | L2 | Admitted-Finance |
| 3 | L3₹10.0 L+₹2.8 L (38.6%)Admitted-Finance | ₹10.0 L+₹2.8 L (38.6%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MS JANMEJAI SINGH CONTRACTOR L2 | M/S SHIVALIK INTERNATIONAL L3 | SHRIMATI RUPWATI CONTRACTOR L1 |
|---|---|---|---|---|---|---|
| 1.00Loading, Unloading and safe cartage of the following materials from Electricity Store Centre, Balrampur to the work site/dump site (Distance up to 50 km) | ||||||
| 1.01 | PCC Poles (8.5 mtr long) | 115 | No | 1,400 ₹1,61,000 | 1,100 ₹1,26,500 | 700 ₹80,500 Lowest |
| 1.02 | LT ABC 3x120+1x95+1x16sq.mm. | 7 | Km | 2,000 ₹14,000 Lowest | 8,000 ₹56,000 | 6,500 ₹45,500 |
| 1.03 | Three Phase Distribution Box. | 111 | No | 100 ₹11,100 Lowest | 900 ₹99,900 | 120 ₹13,320 |
| 1.04 | Other line materials | 34.5 | Qtl | 2,500 ₹86,250 | 1,500 ₹51,750 Lowest | 3,500 ₹1,20,750 |
| 2.00 | Erection of single PCC Poles (8.5 Mtr Long) for 11 KV/L.T. line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site | 115 | No | 1,500 ₹1,72,500 | 1,100 ₹1,26,500 Lowest | 1,100 ₹1,26,500 Lowest |
| 3.00 | Erection and Grouting of stay sets alongwith complete fittings. Cement, Sand & Brick ballast provided by the contractor at his own cost. | 18 | No | 590 ₹10,620 | 800 ₹14,400 | 500 ₹9,000 Lowest |
| 4.00 | Grouting of Poles with 1:4:8 CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely.All required materials provided by the contractor at his own cost. | 112 | No | 500 ₹56,000 Lowest | 800 ₹89,600 | 550 ₹61,600 |
| 5.00 | Laying, Stringing & Sagging of 3x120+1x95+1x16sq.mm. ABC Cable up to proper sag for the following size cable | 7.27 | Km | 5,000 ₹36,350 Lowest | 10,000 ₹72,700 | 10,000 ₹72,700 |
| 6.00 | Fitting of Three Phase Distribution Box. | 111 | No | 800 ₹88,800 | 500 ₹55,500 | 350 ₹38,850 Lowest |
Tender Value
₹9.8 L
EMD Value
₹9,810
Closing Date
17 Jun 2026, 2:00 pmClosed
se edc balrampur
office se edc balrampur
17/EDC(BLP)/2026-27
2026_MVVNL_1154171_5
NVS-13-24/EDC(BLP)/2026-27
Open Tender
Electrical Works
Item Rate
90 days
Balrampur
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
se edc blp
₹9,810
20 Jun 2026
27 May 2026
18 Jun 2026
27 May 2026
17 Jun 2026
27 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Loading, Unloading and safe cartage of the following materials from Electricity Store Centre, Balrampur to the work site/dump site (Distance up to 50 km) | |||||
| 1.01 | PCC Poles (8.5 mtr long) | 115 | No | 1.25 | ₹143.75 |
| 1.02 | LT ABC 3x120+1x95+1x16sq.mm. | 7 | Km | 1.25 | ₹8.75 |
| 1.03 | Three Phase Distribution Box. | 111 | No | 1.25 | ₹138.75 |
| 1.04 | Other line materials | 34.5 | Qtl | 1.25 | ₹43.13 |
| 2 | Erection of single PCC Poles (8.5 Mtr Long) for 11 KV/L.T. line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site | 115 | No | 1.25 | ₹143.75 |
| 3 | Erection and Grouting of stay sets alongwith complete fittings. Cement, Sand & Brick ballast provided by the contractor at his own cost. | 18 | No | 1.25 | ₹22.5 |
| 4 | Grouting of Poles with 1:4:8 CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely.All required materials provided by the contractor at his own cost. | 112 | No | 1.25 | ₹140 |
| 5 | Laying, Stringing & Sagging of 3x120+1x95+1x16sq.mm. ABC Cable up to proper sag for the following size cable | 1 | Km | 1.25 | ₹1.25 |
| 6 | Fitting of Three Phase Distribution Box. | 111 | No | 1.25 | ₹138.75 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
17.pdf
Tender Documents • 1.64 MB
BOQ_2162060.xls
BOQ • 0.39 MB
22.pdf
PDF • 0.28 MB
14.pdf
PDF • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .