| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-Finance | ₹3.0 L | L1 | Accepted-Finance Quoted Lowest Rate |
| 2 | L2₹3.1 L+₹2,977.15 (0.98%)Accepted-Finance | ₹3.1 L+₹2,977.15 (0.98%) | L2 | Accepted-Finance Quoted 2nd Lowest Rate |
| 3 | L3₹3.1 L+₹3,007.53 (0.99%)Accepted-Finance | ₹3.1 L+₹3,007.53 (0.99%) | L3 | Accepted-Finance Quoted Highest Rate |
Tender Value
₹3.0 L
EMD Value
₹6,076
Closing Date
29 May 2026, 6:00 pmClosed
PRADHAN, LEBONG VALLEY-II GP
OFFICE OF THE LEBONG VALLEY-II GRAM PANCHAYAT P.O. LEBONG DIST. DARJEELING 734105 DARJEELING PULBAZAR BLOCK DEV. BLOCK
Construction of Drinking Water Tank with Pipe Line at Sansad no.- VI, Lebong Valley-II Gram Panchayat, under Darjeeling Pulbazar Dev. Block Bijanbari, during 2025-2026.
2026_GTA_1019787_2
05 / LV-IIGP/XVFC/2025-26
Open Tender
CIVIL WORKS
Percentage
30 days
Lebong Valley-II GP
Please refer Tender documents
4 documents required · 4 mandatory
₹1,519
₹6,076
6 Aug 2026
22 May 2026
1 Jun 2026
22 May 2026
29 May 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing,spreading or stacking the spoils within a lead of 75m.as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm | 6.79 | Cu.M | 119.27 | ₹809.84 |
| 2 | Labour for laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth. | 9.7 | Sq.M | 50 | ₹485 |
| 3 | Cost of stone boulder 150 mm size delivered ans stacked at site. | 1.46 | Cu.M | 1,526.4 | ₹2,228.54 |
| 4 | Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any. | 6.79 | Cu.M | 3,964.8 | ₹26,920.99 |
| 5 | Ordinary Cement Concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement , if any, in ground floor as per revelant IS codes. (b ) River bazree | 1.1 | Cu.M | 6,370.8 | ₹7,007.88 |
| 6 | Ordinary Cement Concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement , if any, in ground floor as per revelant IS codes.(ii) River Bazaree | 3.51 | Cu.M | 7,238.4 | ₹25,406.78 |
| 7 | Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor). (a) 25 mm. to 30 mm. thick wooden shuttering as per decision & direction of the Engineer-in-charge. | 45.86 | Sq.M | 400.8 | ₹18,380.69 |
| 8 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation and upto roof of ground floor/upto 4 m , (i) Tor steel/Mild Steel , I. SAIL/ TATA/RINL | 0.33 | MT | 79,822.8 | ₹26,341.52 |
| 9 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor).[Excluding cost of chipping over concrete surface] , (ii) With 1:4 cement mortar , (a) 20 mm thick plaster | 45.86 | Sq.M | 247.2 | ₹11,336.59 |
| 10 | Neat cement punning about 1.5 mm thick in wall, dado, window sill, floor etc. | 45.86 | Sq.M | 40.8 | ₹1,871.09 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_2518856.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .