Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-Finance CHAR GHOSHHAT FROM RANJIT HAWLADER HOUSE OF BIMAL DEBNATH HOUSE WARD NO 11 UNDER KATWA MUNICIPALITY WEST BENGAL | ₹4.8 L | L1 | Accepted-Finance Accept |
| 2 | L2₹4.8 LAccepted-Finance BARDHAMAN | WEST BENGAL | 713364 | ₹4.8 L | L2 | Accepted-Finance Accept |
| 3 | L3₹4.8 LRejected-Finance KATWA WEST BENGAL | ₹4.8 L | L3 | Rejected-Finance Reject |
Tender Value
₹4.8 L
EMD Value
₹9,648
Closing Date
13 Mar 2026, 3:00 pmClosed
CHAIRMAN KATWA MUNICIPALITY
CHAIRMAN KATWA MUNICIPALITY
Construction of boundary Wall of East Side of the Park Near Thikana , With In Katwa Municipality, P.S- Katwa, Dist Purba Bardhaman.
2026_MAD_1017593_8
WBMAD 93 (DEV/15TH F.C /KM) 2025-2026
Open Tender
CIVIL WORKS
11 days
East Side of the Park Near Thikana
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹9,648
Yes
5 Jun 2026
6 Mar 2026
16 Mar 2026
6 Mar 2026
13 Mar 2026
6 Mar 2026
Earth Work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, leveling, and dressing and ramming the bottom, bailing out water as required complete.
Single brick flat soiling of jhama bricks including ramming and dressing bed to proper level and filling joint with powered earth or local sand.
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation.
125mm thick bricks work with 1st class bricks in cement mortar (1:4) in ground floor
Cement Concrete with graded stone ballast (40 mm size) excluding shuttering in ground floor.(6:3:1)-
Oridinary cement concrete M-20(mix 1:1.5:3) with graded stone chips (20mm down) excluding,Shuttering and reinforcemen.if any,in ground floor. As per IS 456-2000. a) Ground Floor
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. including supply of rods, initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every inter-section, complete as per drawing and direction.
Hire and labors charges for shuttering with centering and necessary staging up to 4 m. using approved stout props thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, column, lintels curved or straight including fitting, fixing and striking out after completion of works. (Up to roof of ground floor). (When the height of a particular floor is moor than 4 m. the equivalent floor ht. Shall be taken as 4 m. and extra for works beyond the initial 4 m. ht. Shall be allowed under 16 (e) for every 4 m. or part there of 25 mm. to 30-mm. thick wooden shuttering as per decision & direction of Engineer-in-Charge.
f) 25mm to 30mm shuttering without staging in foundation
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints or roughening of concrete surface, including throating, nosing and drip course where necessary (ground floor). 15mm thick. (1:6)
Sub Total
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
2911FORM.pdf
Tender Documents • 1.48 MB
BOQ_2500802.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid