| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹65.3 LAccepted-AOC 00 MEERANPUR SADARALI FAREEDPUR KALAN TANDA AMBEDKAR NAGAR UTTAR PRADESH 224145 | AMBEDKAR NAGAR | UTTAR PRADESH | 224145 | ₹65.3 L Quoted ₹97.2 L | L1 | Accepted-AOC Due to L1 |
| 2 | L2₹1.0 Cr+₹3.2 L (3.27%)Rejected-Finance ADD SHIV SHANKARPURAM SHIVPURI DISTT SITAPUR | ₹1.0 Cr+₹3.2 L (3.27%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.1 Cr+₹15.5 L (16.0%)Rejected-Finance | ₹1.1 Cr+₹15.5 L (16.0%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical E1 Sheet not Uploaded |
Tender Value
₹1.2 Cr
EMD Value
₹8.0 L
Closing Date
25 Nov 2025, 12:00 pmClosed
SE LKO CIR PWD LKO
SE LKO CIR PWD LKO
Construction of Hostel/Barrack for 32 Persons and 01 no Vivechna room at Thana Kakori Lucknow.
2025_CEUCZ_1089737_2
6259/523(2)C-Lko.Cir/2025-26 Dated 24-10-2025
Open Tender
Civil Works - Buildings
Percentage
365 days
LUCKNOW
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹8.0 L
SE LKO CIR PWD LKO
30 Jul 2026
11 Nov 2025
25 Nov 2025
11 Nov 2025
25 Nov 2025
11 Nov 2025
12 Nov 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil Work
Excavation in foundation in ordinary Soil ( Loam clay or sand ) including lift upto 1.5m lead upto 30.0 m & including filling watering and ramming of excavated earth into the space between the building & sides of foundation trenches or into the plinth and removal & disposal surplus earth as directed by the engineer I/C within a lead of 30 m.from foundation trenches.
a)विवेचना कक्ष-47.39
b)बैरक-233.86 | 281.25 | Cum | 140 | ₹39,375 |
| 2 | Supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.
a)विवेचना कक्ष-8.90
b)बैरक-17.61 | 26.51 | Cum | 1,670 | ₹44,271.7 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-lll) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
a)विवेचना कक्ष-12.24
b)बैरक-34.49 | 46.73 | Cum | 5,375 | ₹2,51,173.75 |
| 4 | 1:2:4 (1 cement: 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources)
a)विवेचना कक्ष-0.81
b)बैरक-0.76 | 1.57 | Cum | 6,220 | ₹9,765.4 |
| 5 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge.
(All Works upto Plinth level)
a)विवेचना कक्ष-9.86
b)बैरक-51.36 | 61.22 | Cum | 7,500 | ₹4,59,150 |
| 6 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge.
(All Works above Plinth level upto floor V level)
a)विवेचना कक्ष-17.35
b)बैरक-138.30 | 155.65 | Cum | 7,500 | ₹11,67,375 |
| 7 | Brick work with non modular fly ash bricks conforming to IS:12894, class designation 10 average compressive strength in foundation :
Cement mortar 1:6 (1 cement : 6 Coarse sand).
a)विवेचना कक्ष-12.66
b)बैरक-10.59 | 23.25 | Cum | 6,900 | ₹1,60,425 |
| 8 | Providing and laying autoclaved aerated cement blocks masonry with 150mm/230mm/300 mm thick AAC blocks in super structure above plinth level up to floor V level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar all complete as per direction of Engineer-in-Charge. (The payment of RCC band and reinforcement shall be made for seperately). for 230 mm thick wall.
a)विवेचना कक्ष-22.71
b)बैरक-137.10 | 159.81 | Cum | 6,580 | ₹10,51,549.8 |
| 9 | Providing and laying autoclaved aerated cement blocks masonry with 100 mm thick AAC blocks in super structure above plinth level up to floor V level in cement mortar 1:4 (1 cement : 4 coarse sand ). The rate includes providing and placing in position 2 Nos 6 mm dia M.S. bars at every third course of masonry work.
a)विवेचना कक्ष-10.98
b)बैरक-51.68 | 62.66 | Cum | 8,050 | ₹5,04,413 |
| 10 | Providing and laying damp-proof course 40 mm thick with cement concrete 1:2:4 (1 cement: 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 12.5 mm nominal size derived from natural sources)
a)विवेचना कक्ष-12.71
b)बैरक-28.37 | 41.08 | Sqm | 324 | ₹13,309.92 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.18 MB
BOQ_2000932.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .