| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹32.0 LAccepted-AOC DHARGULI BAGODAR GIRIDIH | ₹32.0 L | 1 | Accepted-AOC WORK ALLOTTED TO ASHOK KUMAR, AT - DHARGULI, BAGODAR, DISTRICT - GIRIDIH AND AGREEMENT DONE |
| 2 | 2₹32.4 L+₹40,491.82 (1.26%)Rejected-AOC 143 SHASTRI NAGAR LAKHIMPUR KHERI | ₹32.4 L+₹40,491.82 (1.26%) | 2 | Rejected-AOC WORK ALLOTTED TO ASHOK KUMAR, AT - DHARGULI, BAGODAR, DISTRICT - GIRIDIH AND AGREEMENT DONE |
| 3 | 3₹32.7 L+₹64,145.45 (2.00%)Rejected-AOC | ₹32.7 L+₹64,145.45 (2.00%) | 3 | Rejected-AOC WORK ALLOTTED TO ASHOK KUMAR, AT - DHARGULI, BAGODAR, DISTRICT - GIRIDIH AND AGREEMENT DONE |
| 4 | 4₹40.1 L+₹8.1 L (25.1%)Rejected-AOC N A | NA | NA | 121004 | ₹40.1 L+₹8.1 L (25.1%) | 4 | Rejected-AOC WORK ALLOTTED TO ASHOK KUMAR, AT - DHARGULI, BAGODAR, DISTRICT - GIRIDIH AND AGREEMENT DONE |
| 5 | 5₹40.1 L+₹8.1 L (25.2%)Rejected-AOC DR ZAKIR HUSSAIN ROAD BARA BAZAR HAZARIBAGH | HAZARIBAGH | HAZARIBAGH | JHARKHAND | ₹40.1 L+₹8.1 L (25.2%) | 5 | Rejected-AOC WORK ALLOTTED TO ASHOK KUMAR, AT - DHARGULI, BAGODAR, DISTRICT - GIRIDIH AND AGREEMENT DONE |
Tender Value
₹40.1 L
EMD Value
₹80,200
Closing Date
17 Mar 2026, 5:00 pmClosed
E.E., NREP, HAZARIBAG
E.E., NREP, HAZARIBAG
Construction of New RCC Drain Inside Gandhi Maidan in Matwari Gali No. 05 and from Matwari Main Road to H/O P K Singh and Repair of PCC Road from H/O Satyam Paswan to H/O Rakesh Gupta via H/O Chintu Sinha in Ward No 12 (Twelve) Under M.C., HAZARIBAG
2026_NREPH_110990_1
NREP/HAZARIBAG/05/2025 - 26 (GROUP NO. 04)
Open Tender
Civil Works
Percentage
270 days
HAZARIBAG
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Yes
₹80,200
11 Sept 2026
9 Mar 2026
18 Mar 2026
9 Mar 2026
17 Mar 2026
9 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W in excavation in foundation trenches in hard soil (vide classification of soil item - A+B ) and disposal of excavated earth as obtained to a distance up to 50M including all lifts with leveling, ramming the foundtion trenches, removing roots of trees, shrubs all complete as per approved design, specification and direction of E/I B.C.D.S.O.R No 5.1.1 | 463.72 | M3 | 151.82 | ₹70,401.97 |
| - | Providing sand filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all load and lifts including cost of all materials, labours, royelty and taxes all complete as per building specification & direction of E/I B.C.D.S.O.R No 5.1.10 | 33.69 | M3 | 589.51 | ₹19,860.59 |
| - | Providing Class 75B brick flat soling joint filled with local sandincluding cost of watering taxes, royelty all complete as per building specification and direction of E/I B.C.D.S.O.R No 5.6.3 | 442.19 | M2 | 330.34 | ₹1,46,073.04 |
| - | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size. B.C.D.S.O.R No 5.3.9.1 | 207.99 | M3 | 5,218 | ₹10,85,291.82 |
| - | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size. B.C.D.S.O.R No 5.3.9.1 | 70.8 | M3 | 4,961.73 | ₹3,51,290.48 |
| - | Centering and shuttering including strutting, propping etc. and removal of from for - Foundations,footings, bases of columns etc for mass concrete B.C.D.S.O.R No 5.3.17.1 | 1,587.45 | M2 | 194.5 | ₹3,08,759.03 |
| - | providing Tor steel reinforcement of 8mm dia rods as per approved design and drawing exclusive carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I. TMT Fe 500 (only valid for SAIL & TATA STEEL) B.C.D.S.O.R No 5.5.4 | 10.63 | MT | 83,314.02 | ₹8,85,961.29 |
| - | providing Tor steel reinforcement of 10mm,12mm,& 16mm. dia bars as per approved design and drawing inclusive carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I. (a) 10mm (TMT coil Fe 500) (only valid for Tata (Tiscon), SAIL, JSPL,Electrosteel Steels Ltd. Bokaro and Vizag (RINL) } B.C.D.S.O.R No 5.5.5 (a) | 5.1 | MT | 82,096.54 | ₹4,18,281.87 |
| - | Carriage of materials including loading, unloading, stacking -do- -do- all complete job as per specification and direction of E/I.(i) Cement | 47.5 | MT | 428.2 | ₹20,339.5 |
| - | Carriage of materials including loading, unloading, stacking -do- -do- all complete job as per specification and direction of E/I. (ii) Sand | 57.93 | M3 | 338.2 | ₹19,591.93 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_149985.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
BOQ_149985.xls
BOQ • 0.38 MB
TENDER_DOCUMENTS_05_04.pdf
Tender Documents • 1.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .