Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.0 LAdmitted-Finance B 134 GANESH MURTHI NAGAR PART III COLABA MUMBAI 400 005 | MUMBAI | MAHARASHTRA | 400005 | L1 | Admitted-Finance | |
| 2 | L2₹38.0 L+₹1,442 (0.04%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹43.6 L+₹5.6 L (14.8%)Admitted-Finance 26 3 BOMBAY PUNE ROAD LAXMI APARTMENT OPP BU BHANDARI SHOWROOM PUNE 411003 | PUNE | MAHARASHTRA | 411003 | L3 | Admitted-Finance | |
| 4 | L4₹45.1 L+₹7.1 L (18.7%)Admitted-Finance FLAT NO 10 S NO 98 PLAT NO 78 SAI SAYAJI PARK A RIGHT BHUSARI COLONY KOTHRUD PUNE 411 038 | PUNE | MAHARASHTRA | 411038 | L4 | Admitted-Finance | |
| 5 | L5₹46.2 L+₹8.2 L (21.7%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | sanjay m. suryawanshi L6 | M/S NILESH BUILDERS L3 | S.K.HARAL L4 | Rays Breakers L8 | Sunil Constructions L11 | AJAY ENTERPRISES L12 | Vipul Enterprises L7 | ADITYA LAXMAN PASALKAR L2 | SHRI SAI ENTERPRISES L1 | M/S SAMRUDHI CONSTRUCTION L10 | ISHITARAJ ENTERPRISES L9 | DARSHAN ENTERPRISES L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of Kerb stone/brickwork or stone/boulder masonry,built in cement mortar or cement lime mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles complete all as specified and directed. | 167 | Cubic Metre | 540 ₹90,180 | 378 ₹63,126 | 540 ₹90,180 | 600 ₹1,00,200 | 440 ₹73,480 | 1,000 ₹1,67,000 | 525 ₹87,675 | 250 ₹41,750 Lowest | 450 ₹75,150 | 800 ₹1,33,600 | 610 ₹1,01,870 | 1,200 ₹2,00,400 |
| 2.00 | Material and labour for walling of random rubble, uncoursed, well bonded, bedded and solidly hearted brought up to course built in CM 1:6 complete all as specified and directed. | 100 | Cubic Metre | 3,600 ₹3,60,000 | 3,780 ₹3,78,000 | 3,600 ₹3,60,000 | 3,700 ₹3,70,000 | 4,400 ₹4,40,000 | 5,200 ₹5,20,000 | 3,700 ₹3,70,000 | 3,800 ₹3,80,000 | 3,333 ₹3,33,300 Lowest | 5,500 ₹5,50,000 | 3,750 ₹3,75,000 | 6,000 ₹6,00,000 |
| 3.00 | Material and labour for walling of random rubble, brought upto course, well bonded, bedded and solidly hearted, built in CM (1:6) but except stone complete all as specified and directed. | 50 | Cubic Metre | 2,700 ₹1,35,000 | 2,457 ₹1,22,850 | 2,790 ₹1,39,500 | 3,000 ₹1,50,000 | 4,400 ₹2,20,000 | 2,800 ₹1,40,000 | 3,100 ₹1,55,000 | 2,800 ₹1,40,000 | 2,520 ₹1,26,000 | 3,500 ₹1,75,000 | 2,900 ₹1,45,000 | 2,000 ₹1,00,000 Lowest |
| 4.00 | Material and labour for extra over granite or trap stone walling for hammer dressing to face stones and dressing of face beds and joints as specified of face beds and joints as specified of random rubble walling uncoursed or brought upto course with 40mm maximum depression on face from straight edge held against the dressed surface complete all as specified and directed. | 260 | Square Metre | 360 ₹93,600 | 284 ₹73,840 | 540 ₹1,40,400 | 400 ₹1,04,000 | 500 ₹1,30,000 | 250 ₹65,000 | 410 ₹1,06,600 | 250 ₹65,000 | 72 ₹18,720 Lowest | 450 ₹1,17,000 | 405 ₹1,05,300 | 300 ₹78,000 |
| 5.00 | Raking out joints/pointing built in cement mortar to random rubble masonry, uncoursed or brought upto course complete all as specified and directed. | 36 | 10 Square Metre | 180 ₹6,480 Lowest | 189 ₹6,804 | 1,260 ₹45,360 | 200 ₹7,200 | 400 ₹14,400 | 2,200 ₹79,200 | 186 ₹6,696 | 2,000 ₹72,000 | 450 ₹16,200 | 600 ₹21,600 | 200 ₹7,200 | 1,000 ₹36,000 |
| 6.00 | Material and labour for flush pointing to random rubble, uncoursed or brought upto courses in CM 1:4 complete all as specified directed. | 10 | 10 Square Metre | 2,700 ₹27,000 | 2,835 ₹28,350 | 1,800 ₹18,000 | 2,500 ₹25,000 | 2,800 ₹28,000 | 2,300 ₹23,000 | 2,500 ₹25,000 | 2,500 ₹25,000 | 1,170 ₹11,700 | 1,560 ₹15,600 | 2,550 ₹25,500 | 1,100 ₹11,000 Lowest |
| 7.00 | Demolition of cement concrete of any description and in any position not otherwise specifically provided for, Complete all as specified and as directed by Engineer-in-Charge. | 18 | Cubic Metre | 630 ₹11,340 | 473 ₹8,514 | 630 ₹11,340 | 700 ₹12,600 | 450 ₹8,100 | 1,500 ₹27,000 | 695 ₹12,510 | 300 ₹5,400 Lowest | 540 ₹9,720 | 1,200 ₹21,600 | 700 ₹12,600 | 1,200 ₹21,600 |
| 8.00 | Material and labour for Providing PCC (1:2:4) type B1 using 20 mm graded aggeregate as in coping/Channel of drain etc including necessary formwork complete all as specified and directed. | 18 | Cubic Metre | 5,850 ₹1,05,300 | 5,670 ₹1,02,060 | 7,200 ₹1,29,600 | 6,000 ₹1,08,000 | 400 ₹7,200 Lowest | 6,800 ₹1,22,400 | 6,000 ₹1,08,000 | 4,800 ₹86,400 | 5,450 ₹98,100 | 8,500 ₹1,53,000 | 6,000 ₹1,08,000 | 4,000 ₹72,000 |
| 9.00 | Excavation in trenches, not exc 1.50 metre depth & n. Exc 1.50metre wide for foundation etc & getting out in soft/loose soil complete all as specified and directed. | 135 | Cubic Metre | 450 ₹60,750 | 378 ₹51,030 | 360 ₹48,600 | 500 ₹67,500 | 350 ₹47,250 | 380 ₹51,300 | 500 ₹67,500 | 300 ₹40,500 | 278 ₹37,530 Lowest | 450 ₹60,750 | 520 ₹70,200 | 300 ₹40,500 |
| 10.00 | Returning filling including spreading, leveling watering & Well ramming in layers n.exc 25 cm thick in any type of soil complete all as specified and directed. | 28 | Cubic Metre | 108 ₹3,024 | 113 ₹3,164 | 135 ₹3,780 | 110 ₹3,080 | 400 ₹11,200 | 300 ₹8,400 | 110 ₹3,080 | 200 ₹5,600 | 77 ₹2,156 Lowest | 150 ₹4,200 | 110 ₹3,080 | 200 ₹5,600 |
Tender Value
Refer Docs
EMD Value
₹90,000
Closing Date
28 Sept 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE RnD Pashan
GE RnD Pashan
REPAIRS TO COMPOUND WALL, CHAIN LINK FENCING AREA / STORM DRAINAGE, TRAVERSE WALL AT TECHNICAL AREA OF ARDE, JCDA, DSC LINE, GOL MARKET UNDER GE (I) RnD PASHAN, PUNE
2026_MES_788242_1
GERD/PSN/TOKEN/57 OF 2026-27
Open Tender
Civil Works
Item Rate
180 days
GE RnD Pashan
As per tender documents
8 documents required · 8 mandatory
₹500
GE RnD Pashan
₹90,000
Yes
16 Oct 2026
7 Sept 2026
6 Oct 2026
7 Sept 2026
28 Sept 2026
21 Sept 2026
7 Sept 2026 - 14 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of Kerb stone/brickwork or stone/boulder masonry,built in cement mortar or cement lime mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles complete all as specified and directed. | 167 | Cubic Metre | 100 | ₹16,700 |
| - | Material and labour for walling of random rubble, uncoursed, well bonded, bedded and solidly hearted brought up to course built in CM 1:6 complete all as specified and directed. | 100 | Cubic Metre | 100 | ₹10,000 |
| - | Material and labour for walling of random rubble, brought upto course, well bonded, bedded and solidly hearted, built in CM (1:6) but except stone complete all as specified and directed. | 50 | Cubic Metre | 100 | ₹5,000 |
| - | Material and labour for extra over granite or trap stone walling for hammer dressing to face stones and dressing of face beds and joints as specified of face beds and joints as specified of random rubble walling uncoursed or brought upto course with 40mm maximum depression on face from straight edge held against the dressed surface complete all as specified and directed. | 260 | Square Metre | 100 | ₹26,000 |
| - | Raking out joints/pointing built in cement mortar to random rubble masonry, uncoursed or brought upto course complete all as specified and directed. | 36 | 10 Square Metre | 100 | ₹3,600 |
| - | Material and labour for flush pointing to random rubble, uncoursed or brought upto courses in CM 1:4 complete all as specified directed. | 10 | 10 Square Metre | 100 | ₹1,000 |
| - | Demolition of cement concrete of any description and in any position not otherwise specifically provided for, Complete all as specified and as directed by Engineer-in-Charge. | 18 | Cubic Metre | 100 | ₹1,800 |
| - | Material and labour for Providing PCC (1:2:4) type B1 using 20 mm graded aggeregate as in coping/Channel of drain etc including necessary formwork complete all as specified and directed. | 18 | Cubic Metre | 100 | ₹1,800 |
| - | Excavation in trenches, not exc 1.50 metre depth & n. Exc 1.50metre wide for foundation etc & getting out in soft/loose soil complete all as specified and directed. | 135 | Cubic Metre | 100 | ₹13,500 |
| - | Returning filling including spreading, leveling watering & Well ramming in layers n.exc 25 cm thick in any type of soil complete all as specified and directed. | 28 | Cubic Metre | 100 | ₹2,800 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
8757.pdf
Tender Documents • 1.80 MB
BOQ_883513.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .