| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.4 CrAdmitted-Finance PLOT NO 1 GIRAMRUT NIWAS MUKTESHWAR NAGAR SINNAR SHIRDI ROAD SINNAR TALUKA SINNAR DISTRICT NASHIK | +0.00% | ₹7.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹7.6 Cr+₹16.5 L (2.21%)Admitted-Finance | +2.21% | ₹7.6 Cr+₹16.5 L (2.21%) | L2 | Admitted-Finance |
| 3 | L3₹8.0 Cr+₹52.1 L (7.00%)Admitted-Finance KUBRA SANKUL HDFC BANK LING ROAD SAMOR VEER SAVARKAR MARG SANGAMNER TALUKA SANGAMNER DISTRICT AHMEDNAGAR | AHMEDNAGAR | MAHARASHTRA | 413201 | +7.00% | ₹8.0 Cr+₹52.1 L (7.00%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical 102 HILL VIEW APARTMENT TIDKE COLONY NASHIK 422 002 | MUMBAI | RAIGAD | MAHARASHTRA | 422002 | - | - | - | Rejected-Technical All required document are not submitted |
| 5 | Rejected-Technical SARARSWATI NAGAR SARADWADI ROAD SINNAR COLLEGE MARG SINNAR DIST NASHIK | NASHIK | MAHARASHTRA | 422001 | - | - | - | Rejected-Technical All required document are not submitted |
Tender Value
₹7.4 Cr
EMD Value
₹7.4 L
Closing Date
27 Mar 2026, 6:00 pmClosed
SINNAR MUNICIPAL COUNCIL, SINNAR
SINNAR MUNICIPAL COUNCIL, SINNAR
PROPOSED CONSTRUCTION IN VARIOUS AREAS OF SINNAR MUNICIPAL COUNCIL. (6 WORKS)
2026_DMA_1285552_1
SMC/CIVIL/6Works/2025-26
Open Tender
Civil Works
Percentage
180 days
SINNAR MUNICIPAL COUNCIL, SINNAR
As Per Tender Documents
11 documents required · 11 mandatory
₹74,000
₹7.4 L
SINNAR MUNICIPAL COUNCIL, SINNAR
7 Aug 2026
10 Mar 2026
30 Mar 2026
10 Mar 2026
27 Mar 2026
10 Mar 2026
23 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (A)Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed. 2.11 | 1 | Cubic Metre | - | - |
| 2 | (A)Providing soling using 80 mm size trap metal in 15 cm. layer including filling voids with Crushed sand/grit, ramming, watering etc. complete.21.40 | 0.8 | Cubic Metre | - | - |
| 3 | (A)Providing and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, Steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)24.01 | 0.4 | Cubic Metre | 1 | ₹0.4 |
| 4 | (A)Providing and laying 125 micron Low Density Polyethylene (LDPE) sheet confirming to IS 3395 : 1997 below concrete pavement including all materials and labour complete.5.19 | 1 | Square Metre | 1 | ₹1 |
| 5 | Providing and laying in situ cement concrete M -30 with tremix treatment for 200 mm thickness for Concrete Road is including laying plastic sheet for 125 micron thickness with groove cutting of 4 mm wide and 20 mm deep with necessary refilling with bitumen ( excluding reinforcement) with coarse and fine aggregate ( natural sand/ VSI grade finely washed crushed sand) etc. complete with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete.5.22 a | 0.2 | Cubic Metre | - | - |
| 6 | (A)Providing and fixing in position TMT - FE - 500 bar reinforcement of various diameters for R.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete. Item no 26.33 Bd.F.17, Page No. 306 | 1 | MT | 1 | ₹1 |
| 7 | Excavation for catch / side water gutter in Soft rock strata to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed. 2.21minous paint as directed etc. complete.5.15 | 1 | Cubic Metre | - | - |
| 8 | (A)Excavation for catch / side water gutters in Hard rock strata to the specified section including stacking the excavated stuff in a regular bund by chiselling and wedging and disposing of unsuitable or excess stuff as directed. 2.22 | - | Cubic Metre | - | - |
| 9 | (A)Supplying hard murum/ kankar at the road site, including conveying and stacking complete. 2.29a | - | Cubic Metre | - | - |
| 10 | (A)Spreading hard murum/ soft murrum/ gravel or kankar for side width complete.2.30 | - | Cubic Metre | 1 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
T_F.pdf
Tender Documents • 0.62 MB
BOQ_2210760.xls
BOQ • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .