Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.7 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹54.9 L+₹7,266 (0.13%)Rejected-Finance MAHALSA ROAD BINAGA KARWAR 581307 | KARWAR | UTTARA KANNADA | KARNATAKA | 581307 | L2 | Rejected-Finance Not Being L1 | |
| 3 | L3₹59.2 L+₹4.3 L (7.85%)Rejected-Finance | L3 | Rejected-Finance Not Being L1 | |
| 4 | L4₹59.2 L+₹4.3 L (7.87%)Rejected-Finance | L4 | Rejected-Finance Not Being L1 | |
| 5 | L5₹62.8 L+₹7.9 L (14.4%)Rejected-Finance LEKSHMI NIVAS TELANG ROAD NANDANGADDA KARWAR 581 304 | KARWAR | UTTARA KANNADA | KARNATAKA | 581304 | L5 | Rejected-Finance Not Being L1 |
| Sl No | Description | Qty | Unit | K.G.SHANKER L3 | Shree Ayyappa Engineering L8 | LEKSHMI ENGINEERS L5 | ABDUL RAHIM L7 | KVL CONSTRUCTION L4 | M/S KAMALKANTH NAIK L2 | RAJESWARI CONSTRUCTIONS L6 | SHRI SHIVANAND S NAYAK L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | M&L for preparation of old plastered / decorated wall surfaces by brooming down or steel wire brushing, scraping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots etc and applying one coat of Oil Bound Distemper using Airless sprayer or HVLP with nozzle size 1.8 to 2.5 mm at a pressure of 40 to 60 PSI including necessary scaffolding and safety measures complete all as specified and directed. | 62,500 | Sqm | 35 ₹21,87,500 | 60 ₹37,50,000 | 41.5 ₹25,93,750 | 42 ₹26,25,000 | 40 ₹25,00,000 | 31 ₹19,37,500 Lowest | 44 ₹27,50,000 | 31 ₹19,37,500 Lowest |
| 2.00 | M&L for preparation of old plastered / decorated ceiling surfaces by brooming down or steel wire brushing, scraping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots etc and applying one coat of Oil Bound Distemper using Airless sprayer or HVLP with nozzle size 1.8 to 2.5 mm at a pressure of 40 to 60 PSI, including necessary scaffolding and safety measures complete all as specified and directed. | 18,000 | Sqm | 38 ₹6,84,000 | 55 ₹9,90,000 | 41.5 ₹7,47,000 | 42 ₹7,56,000 | 52 ₹9,36,000 | 34 ₹6,12,000 Lowest | 54 ₹9,72,000 | 34 ₹6,12,000 Lowest |
| 3.00 | M&L for preparation of old painted wooden surfaces of any description not otherwise described over 10cm width or girth and applying one coat of synthetic enamel paint by mechanical spray including necessary scaffolding and safety measures complete all as specified and directed. | 3,000 | Sqm | 70 ₹2,10,000 | 70 ₹2,10,000 | 67 ₹2,01,000 | 80 ₹2,40,000 | 80 ₹2,40,000 | 64 ₹1,92,000 Lowest | 65 ₹1,95,000 | 64 ₹1,92,000 Lowest |
| 4.00 | M&L for preparation of old painted steel surfaces of any description not otherwise described over 10cm width or girth, and applying one coat of synthetic enamel paint by mechanical spray including necessary scaffolding and safety measures complete all as specified and directed. | 1,800 | Sqm | 70 ₹1,26,000 | 75 ₹1,35,000 | 71.4 ₹1,28,520 | 90 ₹1,62,000 | 90 ₹1,62,000 | 65 ₹1,17,000 Lowest | 76 ₹1,36,800 | 68 ₹1,22,400 |
| 5.00 | M&L for preparation of newly plastered wall surfaces by applying wall care white putty and sanding to achieve a smooth surfaces, and applying two coats of acrylic emulsion paint by mechanical spray of any tint/shade over a coat of cement based primer including washing floors, cleaning glass, joinery, electrical fittings, wiring etc. of drops and splashes complete all as specified and directed. | 1,100 | Sqm | 120 ₹1,32,000 | 108 ₹1,18,800 | 124 ₹1,36,400 | 150 ₹1,65,000 | 90 ₹99,000 Lowest | 109 ₹1,19,900 | 110 ₹1,21,000 | 110 ₹1,21,000 |
| 6.00 | M&L for one coats of French polishing on surface of any description, width or girth including cleaning and preparing the surfaces with a coat of wooden filler on old works etc complete all as specified and directed. | 700 | Sqm | 65 ₹45,500 | 80 ₹56,000 | 59 ₹41,300 | 100 ₹70,000 | 90 ₹63,000 | 50 ₹35,000 Lowest | 78 ₹54,600 | 54 ₹37,800 |
| 7.00 | Dismantling floor, hearth or wall tiling, including cement mortar bedding (but not backing), removing serviceable tiles to store and removing all the rubbish complete all as specified and directed. | 98 | Sqm | 40 ₹3,920 Lowest | 90 ₹8,820 | 70 ₹6,860 | 100 ₹9,800 | 40 ₹3,920 Lowest | 78 ₹7,644 | 80 ₹7,840 | 80 ₹7,840 |
| 8.00 | Demolition of stone slabs and tiles of any description or thickness in floor, aprons, etc., laid, bedded and pointed in any mortar, complete all as specified and directed. | 0.8 | 10 Sqm | 600 ₹480 | 615 ₹492 | 540 ₹432 | 600 ₹480 | 400 ₹320 Lowest | 540 ₹432 | 489 ₹391.2 | 550 ₹440 |
| 9.00 | Taking up or down GI tubing and connections 15mm bore, including cleaning or removal to store complete all as specified and directed. | 20 | Running Metre | 45 ₹900 | 31 ₹620 | 36 ₹720 | 30 ₹600 | 20 ₹400 Lowest | 45 ₹900 | 30 ₹600 | 40 ₹800 |
| 10.00 | Taking up or down GI tubing and connections 20mm bore including cleaning or removal to store complete all as specified and directed. | 25 | Running Metre | 45 ₹1,125 | 37 ₹925 | 36 ₹900 | 35 ₹875 | 25 ₹625 Lowest | 45 ₹1,125 | 32 ₹800 | 40 ₹1,000 |
Tender Value
₹69.9 L
EMD Value
₹1.3 L
Closing Date
10 Jun 2026, 6:00 pmClosed
GE (SB) KARWAR
Garrison Engineer Karwar Naval Base Sankrubag PO Karwar - 581308
COMPREHENSIVE WELCOME MAINTENANCE OF OFFICERS MARRIED ACCOMODATION AT SITE A1 OF NAVAL BASE KARWAR
2026_MES_766767_1
8499/E8
Open Tender
Civil Works
Item Rate
330 days
GE (SB) KARWAR
As per NIT.
8 documents required · 8 mandatory
₹1,000
GE (SB) Karwar
₹1.3 L
Yes
13 Jul 2026
20 May 2026
12 Jun 2026
20 May 2026
10 Jun 2026
3 Jun 2026
20 May 2026 - 27 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M&L for preparation of old plastered / decorated wall surfaces by brooming down or steel wire brushing, scraping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots etc and applying one coat of Oil Bound Distemper using Airless sprayer or HVLP with nozzle size 1.8 to 2.5 mm at a pressure of 40 to 60 PSI including necessary scaffolding and safety measures complete all as specified and directed. | 62,500 | Sqm | 1.25 | ₹78,125 |
| 2 | M&L for preparation of old plastered / decorated ceiling surfaces by brooming down or steel wire brushing, scraping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots etc and applying one coat of Oil Bound Distemper using Airless sprayer or HVLP with nozzle size 1.8 to 2.5 mm at a pressure of 40 to 60 PSI, including necessary scaffolding and safety measures complete all as specified and directed. | 18,000 | Sqm | - | - |
| 3 | M&L for preparation of old painted wooden surfaces of any description not otherwise described over 10cm width or girth and applying one coat of synthetic enamel paint by mechanical spray including necessary scaffolding and safety measures complete all as specified and directed. | 3,000 | Sqm | 10 | ₹30,000 |
| 4 | M&L for preparation of old painted steel surfaces of any description not otherwise described over 10cm width or girth, and applying one coat of synthetic enamel paint by mechanical spray including necessary scaffolding and safety measures complete all as specified and directed. | 1,800 | Sqm | 11 | ₹19,800 |
| 5 | M&L for preparation of newly plastered wall surfaces by applying wall care white putty and sanding to achieve a smooth surfaces, and applying two coats of acrylic emulsion paint by mechanical spray of any tint/shade over a coat of cement based primer including washing floors, cleaning glass, joinery, electrical fittings, wiring etc. of drops and splashes complete all as specified and directed. | 1,100 | Sqm | 10 | ₹11,000 |
| 6 | M&L for one coats of French polishing on surface of any description, width or girth including cleaning and preparing the surfaces with a coat of wooden filler on old works etc complete all as specified and directed. | 700 | Sqm | 11 | ₹7,700 |
| 7 | Dismantling floor, hearth or wall tiling, including cement mortar bedding (but not backing), removing serviceable tiles to store and removing all the rubbish complete all as specified and directed. | 98 | Sqm | 12 | ₹1,176 |
| 8 | Demolition of stone slabs and tiles of any description or thickness in floor, aprons, etc., laid, bedded and pointed in any mortar, complete all as specified and directed. | 0.8 | 10 Sqm | 13 | ₹10.4 |
| 9 | Taking up or down GI tubing and connections 15mm bore, including cleaning or removal to store complete all as specified and directed. | 20 | Running Metre | 14 | ₹280 |
| 10 | Taking up or down GI tubing and connections 20mm bore including cleaning or removal to store complete all as specified and directed. | 25 | Running Metre | 15 | ₹375 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_858734.xls
BOQ • 0.37 MB
Tender8499.pdf
Tender Documents • 1.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .