| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.8 LAccepted-AOC SITHARKADU MAYILADUTHURAI | MAYILADUTHURAI | MAYILADUTHURAI | TAMIL NADU | L1 | Accepted-AOC accepted | |
| 2 | L2₹11.8 L+₹59.13 (<0.01%)Rejected-Finance | L2 | Rejected-Finance rejected |
Tender Value
₹12 L
EMD Value
₹12,000
Closing Date
3 May 2023, 3:00 pmClosed
Block Development officer (V.P) Mayiladuthurai
Block Development office Mayiladuthurai
Construction Of 30000 LTR OHT (7.50m Stage) and New Borewell at AD Colony Mela theru in Arunmozhidevan panchayat Mayiladuthurai Block
2023_RDTN_306128_1
1020/2023/B2 24.04.2023
Open Tender
Civil Works
Item Rate
180 days
Block Development office Mayiladuthurai
Refer Tender Document
9 documents required · 9 mandatory
₹0
₹12,000
Yes
Block Development office Mayiladuthurai
24 Jun 2023
25 Apr 2023
3 May 2023
25 Apr 2023
3 May 2023
25 Apr 2023
25 Apr 2023 - 26 Apr 2023
27 Apr 2023
Amount
Construction Of 30000 Lit OHT(7.5m Stage) @ SC Mela Theru in Arunmozhidevan Panchayat
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supply and Filling Foundation and basement with Filling sand in layers not more than 15cm thick well ramed watered and compacted complete complying with standard specification
Cement Concerte 1:4:8 Mix using 40mm HBG Metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick Compacting etc complete complting with Standard Specification and as directed
RCC M30 GRADE using graded aggregate of HBGs excluding cost reinforcement centering shuttering but including cost of concrete placing vibrating etc complete
A) For items 1.5m -4.5m Below GL
B) For items 0m -1.5m Below GL
C) For items 0m -3.205 m Above GL
D) For items 3.505m to 7.50m Above GL
E) For Items 7.35 to 10.43m Above GL
Supplying & Erecting Centering For sides & Soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90x 60cm & 10 gauge stiffened, welded with steel angle of size 25x25x3mm for Boarding laid over Silver oak joists (country wood ) of size 10x 6.5cm spaced @ about 90cm c/c and supported by casurina
For Column Footing and GL Brace
For Brace and middle brace B1
For Brace and middle brace B2
For Floor Beam and Bottom of Floor slab
Curved surface 0-3.30m
For side wall & Roof Slab sides Hanch
Square Column
For column Below GL
For column Below GL
For Column 3.505m to 4.505m
For Column 4.505m to 5.505m
For Column 5.505m to 6.505m
For column 6.505m to 6.71m
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Exterior Emulsion two coats of approved colour Including cost and conveyance and all labour Charges etc complete
Fabrication ,supply, delivery and fixing of outside MS ladder of 45cm wide 50x50x6mm Ms angle for side Steps in 16mm MS plain rods Fixed at 30mm c/c welded, joinded etc
Providing and Fixing of RCC access ladder in Rcc 1:1.5:3 mix using 20mm HBG metal including cost and conveyance and all Labour Charges etc Complete
Providing PVC ventilating Arrangements, Mosquito Proof nylon net With 110mm PVC Pipes and Cowl etc Complete
Providing Manhole Cover of Size 0.60x0.60m in RCC 1:1.5:3 mix with suitable reinforcement and 50x50x6mm MS along edges etc complete
Refilling with Excavated earth (other than sand complying with standard specification for filling in trenches
65mm dia GI pipes for tank connection
65mm dia G.M Gate Valve
65mm dia Non return valve
65mm dia GI Coupling
65mm dia GI Elbow
65mm dia GI Bend
65mm dia GI Flange set
65mm dia GI union
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
M/s. M.F.Construction
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .