Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.8 LAccepted-AOC MAIN ROAD LATEHAR | LATEHAR | JHARKHAND | 822111 | L1 | Accepted-AOC L1 | |
| 2 | L3₹17.6 L+₹1.8 L (11.7%)Rejected-Finance | L3 | Rejected-Finance REJECTED | |
| 3 | L4₹18.6 L+₹2.8 L (17.9%)Rejected-Finance NAGAR AYUKT SAH PRASHASAK MEDININAGAR NAGAR NIGAM | L4 | Rejected-Finance REJECTED | |
| 4 | L5₹20.1 L+₹4.3 L (27.5%)Rejected-Finance | L5 | Rejected-Finance REJECTED | |
| 5 | Rejected-Technical LATEHAR JHARKHAND | LATEHAR | JHARKHAND | 822111 | - | Rejected-Technical REJECTED |
Tender Value
₹25.0 L
EMD Value
₹50,000
Closing Date
17 Jul 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
E.O. NAGAR PANCHAYAT LATEHAR
E.O. NAGAR PANCHAYAT LATEHAR
Construction of PCC Road from Dharampur Bypass road to house of Janeshwar Ram before house of Kojha Bhuiyan at ward 11 under Nagar Panchayat Latehar
2026_UDD_115601_11
UDD/LNP/04/2026-27
Open Tender
Civil Works
Works
90 days
LATEHAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹50,000
Yes
29 Oct 2026
27 Jun 2026
18 Jul 2026
27 Jun 2026
17 Jul 2026
27 Jun 2026
180 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in soil by Manual means (excavation for road way in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto 100 meter. Including royalty Rs. 30.00 per cum but excluding the cost of watering, rolling & compaction -do- E/I. | - | M3 | - | - |
| 2 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting | - | M3 | - | - |
| 3 | Construction of dry lean cement concrete sub base over a prepared sub grade with coarse and fine aggregate conforming to IS:383 ,the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1 , aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/cum ,optimum moisture content to be determind during trial length construction . | - | M3 | 1 | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) | - | M3 | 1 | - |
| 5 | Centering and shuttering including structting propping etc and -–do-- E/I. | - | m2 | - | - |
| 6 | FOR GUARD WALL
Earthwork in soil by Manual means (excavation for road way in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto 100 meter. Including royalty Rs. 30.00 per cum but excluding the cost of watering, rolling & compaction -do- E/I. | - | M3 | - | - |
| 7 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not Exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction E/I. | - | m3 | 1 | - |
| 8 | 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | - | m3 | - | - |
| 9 | Providing designation 75A brick work in C.M (1;4) in foundation ---------all complete as per building specification and direction E/I. | - | m3 | 1 | - |
| 10 | Providing designation 75 A brick work in C.M. (1: 3) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including, providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth curing, taxes and royalty all complete as per building specification and direction of E/I. | - | m3 | 1 | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_156346.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.41 MB
BOQ_156346.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .