Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹16.9 LAdmitted-Fee/PreQual/Technical/Finance | -36.99% | ₹16.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹17.0 LAdmitted-Fee/PreQual/Technical/Finance | -36.86% | ₹17.0 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹17.5 LAdmitted-Fee/PreQual/Technical/Finance WARD NO 11 PARASIA DISTT CHHINDWARA M P PIN 480441 | PARASIA | CHHINDWARA | MADHYA PRADESH | 480441 | -34.88% | ₹17.5 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹19.7 LAdmitted-Fee/PreQual/Technical/Finance | -26.75% | ₹19.7 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹21.2 LAdmitted-Fee/PreQual/Technical/Finance | -21.00% | ₹21.2 L | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹26.9 L
EMD Value
₹33,600
Closing Date
10 Aug 2026, 5:00 pmClosed
Staff Officer (Civil)
Staff Officer (Civil), G.M. Office, WCL Pathakhera Area, P.O. Pathakhera, District Betul, Madhya Pradesh, PIN 460449
Ground preparation work for various sports event at Vijay Kreedangan stadium of Pathakhera Area
2026_WCL_362820_2
PK3550-CIV-E-08-2026-27
Open Tender
Civil Works - Others
Percentage
90 days
Pathakhera Area
Please refer Tender documents.
3 documents required · 3 mandatory
₹33,600
11 Aug 2026
31 Jul 2026
11 Aug 2026
31 Jul 2026
10 Aug 2026
31 Jul 2026
31 Jul 2026 - 7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Item code 2.29.1
Ploughing the existing ground to a depth of 15 cm to 25 cm and watering the same. All kinds of soil | 20,000 | Sqm | 19.5 | ₹3,90,000 |
| - | Item code 3.10 UPDATED SCHEDULE OF RATES (SOR) FOR ROAD & BRIDGE WORKS (2024-25)
Construction of embankment with approved material having CBR>7 obtained from boro pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1, 300-2 and as per relevent clause of section-300 | 3,000 | Cum | 175 | ₹5,25,000 |
| - | Item code 2.8.1
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains
(not exceeding 1.5 m in width or 10 sqm on plan), including
dressing of sides and ramming of bottoms, for all lift, including
getting out the excavated soil and disposal of surplus
excavated soil as directed, within a lead of 50 m. All kinds of soil. | - | Cum | 188.5 | - |
| - | Item code 4.1.8
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | Cum | 5,052.05 | - |
| - | Item code 6.34.2 - (6.4.2 - 6.1.2)
Brick work with non modular fly ash bricks conforming to IS:12894, class designation 10 average compressive strength in foundation and plinth in : Cement mortar 1:6 (1 cement : 6 coarse sand). | - | Cum | 5,028 | - |
| - | Item code 6.34.2
Brick work with non modular fly ash bricks conforming to
IS:12894, class designation 10 average compressive strength
in super structure above plinth level up to floor V level in :Cement mortar 1:6 (1 cement : 6 Coarse sand) | - | Cum | - | - |
| - | Item code 2.25
Filling available excavated earth (excluding rock) in
trenches, plinth. sides of foundations etc. in layers not
exceeding 20cm in depth, consolidating each deposited
layer by ramming and watering, lead up to 50 m and for all lift | - | cum | - | - |
| - | Item code 16.3.9
Supplying and stacking at site.Good earth | - | cum | - | - |
| - | Item code 2.32
Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared | - | Sqm | - | - |
| - | Item code 2.27
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | - | Cum | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.45 MB
BOQ_375744.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].