| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.3 LAccepted-AOC | L1 | Accepted-AOC Accept |
| Sl No | Description | Qty | Unit | ARUN CONSTRUCTIONS L1 |
|---|---|---|---|---|
| 1.00 | Earth work excavation in all soils with initial lead & lift etc. complete as per direction of departmental officers etc. completed. | 15 | m³ | 181 ₹2,715 Lowest |
| 2.00 | Filling with gravel including watering and consolidation complete as per direction of departmental officers etc. | 3 | m³ | 580 ₹1,740 Lowest |
| 3.00 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 10 | m³ | 5,590 ₹55,900 Lowest |
| 4.00 | Supply and erecting shuttering including necessary supports for plane surfaces such as RCC column, footing,plinth beam, stair case etc., in all floors using mild steel sheets of 90cm X 60cm and 10 gauge stiffened with welded mild steel angle for boarding supported by casurina props at suitable intervals etc., completed complying with standard specification and as directed. | 25 | m² | 1,112 ₹27,800 Lowest |
| 5.00 | Providing centering using M.S.Sheet sides and soffits for R.C.C column raising including all cost and conveyance etc complete | 18 | m² | 1,304 ₹23,472 Lowest |
| 6.00 | Centering with MS sheet sides and supports for Lintel including all cost etc complete | 12 | m² | 1,086 ₹13,032 Lowest |
| 7.00 | Centering with MS sheet sides and supports for R.C.C Roof beams and slabs including all cost etc complete | 44 | m² | 1,290 ₹56,760 Lowest |
| 8.00 | Reinforced Cement concrete 1:1.5 :3 (one cement, one and half sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 20 | m³ | 9,373 ₹1,87,460 Lowest |
| 9.00 | Supply and fabrication of R.T.S. rods in various dia including cutting bending placing in position and tying etc. | 22 | Qtl | 9,321 ₹2,05,062 Lowest |
| 10.00 | Fly ash Brick work in CM 1:5 (one cement & five sand)using size 9"X4 3/8"X 2 3/4" including finishing, curing, etc., complete complying with standard specification (GF) | 20 | m³ | 6,840 ₹1,36,800 Lowest |
Tender Value
₹15 L
EMD Value
₹15,000
Closing Date
13 Oct 2025, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Construction of Toilet at Corporation elementary school Kandhasamy Nagar in Ward no.04, North zone
2025_MAWS_612339_11
e48/2025
Open Tender
Civil Works
Works
120 days
Coimbatore corporation
As per Tender Document
5 documents required · 5 mandatory
₹0
₹15,000
10 Nov 2025
8 Oct 2025
14 Oct 2025
8 Oct 2025
13 Oct 2025
8 Oct 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .