Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.4 LAccepted-AOC AT GOPALPURA COLONY P O MUGMA DIST DHANBAD 828204 | DHANBAD | JHARKHAND | 828204 | ₹1.4 L | L-1 | Accepted-AOC PO AWARDED |
| 2 | L-2₹1.4 LRejected-Finance | ₹1.4 L | L-2 | Rejected-Finance QUOTED HIGHER THAN L-1 |
| 3 | L-3₹1.4 LRejected-Finance | ₹1.4 L | L-3 | Rejected-Finance QUOTED HIGHER THAN L-1 |
Tender Value
₹1.3 L
EMD Value
₹1,600
Closing Date
2 Mar 2026, 5:00 pmClosed
GM CV AREA
OFFICE OF THE GENERAL MANAGER CV AREA XII
CLEANING OF 3 NO CHHAT GHAT AT VARIOUS PLACES UNDER C V AREA
2026_BCCL_353294_1
BCCL/XII/ACE/ e-Tender-86/2025-26/432 Date-16.02.2026
Open Tender
Civil Works - Others
25 days
CV AREA
Please refer to the tender document.
3 documents required · 3 mandatory
₹1,600
25 Mar 2026
18 Feb 2026
3 Mar 2026
18 Feb 2026
2 Mar 2026
19 Feb 2026
18 Feb 2026 - 23 Feb 2026
P CLEARING OF JUNGLE EXCLUDING OF UPROOTING
EARTH WORK Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil
EARTH WORK Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
EARTH WORK Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
FINISHING 12 mm cement plaster finished with a floating coat of neat cement of mix : 1:4 (1 cement: 4 fine sand)
B/W WITH FLY ASH F&P
EARTH WORK Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.
CONCRETE WORK Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources).
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.26 MB
BOQ_366078.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid