| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹1.6 L (1.28%)Admitted-Finance | ₹1.3 Cr+₹1.6 L (1.28%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | D. TAMILRAJAN L1 | M/s PRS Construction L2 |
|---|---|---|---|---|---|
| 1.01 | Picking the existing surface 3 to 5 cm deep removal of picked up staff to the side berms and using the useful metal to the road hand packing to camber sectioning levelling etc.,complete as per including labour charges for picking and other tools and plants etc., complete as per standard specifications. 404 of MORTH | 1,688 | M2 | 21.5 ₹36,292 Lowest | 22.5 ₹37,980 |
| 2.01 | Construction of Granular Sub-base by providing close graded material,mixing in a machanical plant at OMC,carriage of mixed material to work site,spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to acheive the desired density,Complete as per clause 401. | 282 | M3 | 1,877 ₹5,29,314 Lowest | 1,900 ₹5,35,800 |
| 3.01 | Providing, Laying, Spreading and compacting graded stone aggregate to Wet Mix Macadam for 100mm thick specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density,including all cost conveyance of materials and labour charges etc. complete as per standard specifications as per clause 406 of MORTH. | 1,041 | M3 | 2,139.4 ₹22,27,115.4 Lowest | 2,150 ₹22,38,150 |
| 4.01 | Providing and laying Prime Coat over WBM/WMM surface using 7 Kg of Emulsion Bitumen(SS-1) for 10 Sq.m and cost of Emulsion Bitumen which will be supplied and procured by the contractor himself at his own cost as per special condition appended including labour charges for preparing the surface for laying the tack coat and for applying the required quantity of bitumenius Binder as tack Coat by Bitumen sprayer including hire and fuel for all tools and plant employed etc., complete as per clause 502 of MORTH Rev-5 Specification . etc., complete as per standard specification | 6,938 | M2 | 79.55 ₹5,51,917.9 Lowest | 80 ₹5,55,040 |
| 5.01 | Applying Tack Coat over existing Prime coating WMM surface using 2.5 Kg of Bitumen emulsion(RS-1) per 10 Sq.m including labour charges for preparing the surface removing of binder materials and other foreign matter with wire brushes and small picks & axes sweeping with brooms on soft brushes and finally dusting with old gunny bag and/or compressed air and applying the required quantity of bitumen emulsion as tack coat manually etc., Complete complying with 503 of MORTH.Rev-5 specifications. | 6,938 | M2 | 18.15 ₹1,25,924.7 Lowest | 20 ₹1,38,760 |
| 6.01 | Providing and laying Tack Coat over existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for prparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 | 2,438 | M2 | 26.5 ₹64,607 Lowest | 27 ₹65,826 |
| 7.01 | Providing and laying 50 mm conslidated thick Dense Bituminuous macadam using 0.24 cum of 26.50-13.20 mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm and below and with 53.20kg of VG30(60/70Bulk ) Bitumen premixing 10 sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tons capacity,conveying the mix by tipper trucks to work site,spreading the mix uniform thickness of 50mm with paver to the specified grade and cross sections and compaction by vibratory/ pneumatic roller to the required density etc., including labour for accending to pavor at sites etc., including hire charges and fuel charges for 20-30T CMP with bitumen Boiler,tipper trucks, paver finisher/9 m paver finisher,vibratory/ pneumatic rollers and all other tools and plant required including to all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5. | 469 | M3 | 9,878.6 ₹46,33,063.4 Lowest | 9,900 ₹46,43,100 |
| 8.01 | Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 50.30 Kgs of VG30 (60/70Bulk ) Bitumen and for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5 | 282 | M3 | 10,708.5 ₹30,19,797 Lowest | 11,000 ₹31,02,000 |
| 9.01 | Providing and laying of hot applied thermoplastic compound 2.5 mm. thick including reflectorising glass beads @ 250 gms. per sqm. area, thickness of 2.5 mm. is exclusive of surface applied glass beads as per IRC: 35. The finished surface to be level, uniform and free from streaks and holes etc. complete. (as per MORT & H specification No.803). (CE(H) Chennai Memo No.4848/BOE/138/2011-1/ dated:06.01.12) | 500 | M2 | 889 ₹4,44,500 Lowest | 900 ₹4,50,000 |
| 10.01 | Providing and laying Well Gravel for 150 mm thick in layers of finished thickness of 75 mm thick each including cost and conveyance of Gravel from approved quarry to working site and stacking them to departmental gauge for pre measurement including labourcharges for sperading watering including all leads for water and consolidation by power roller rolling including hire and fuel charges for all tools and plants employed and all other incidental charges etc, complete complying as per clause 301&305 of MORTH specification. | 225 | M3 | 254 ₹57,150 Lowest | 265 ₹59,625 |
Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
7 Nov 2024, 3:00 pmClosed
The Executive Officer
Town Panchayat Office, Odaipatti, Theni Dist
NABARD (RIDF-XXX) -2024-2025-Strenghthening of BT Road at Samathuvapuram Arch to Vellaiyammal puram road in Odaipatti Town Panchayat, Theni Dist
2024_DTP_498234_1
65/2024
Open Tender
Civil Works
Works
180 days
Odaipatti Town Panchayat Limit, Theni Dist
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.5 L
Town Panchayat Office, Odaipatti, Theni Dist
3 Dec 2024
2 Nov 2024
7 Nov 2024
2 Nov 2024
7 Nov 2024
4 Nov 2024
4 Nov 2024
Amount
Picking the existing surface 3 to 5 cm deep removal of picked up staff to the side berms and using the useful metal to the road hand packing to camber sectioning levelling etc.,complete as per including labour charges for picking and other tools and plants etc., complete as per standard specifications. 404 of MORTH
Construction of Granular Sub-base by providing close graded material,mixing in a machanical plant at OMC,carriage of mixed material to work site,spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to acheive the desired density,Complete as per clause 401.
Providing, Laying, Spreading and compacting graded stone aggregate to Wet Mix Macadam for 100mm thick specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density,including all cost conveyance of materials and labour charges etc. complete as per standard specifications as per clause 406 of MORTH.
Providing and laying Prime Coat over WBM/WMM surface using 7 Kg of Emulsion Bitumen(SS-1) for 10 Sq.m and cost of Emulsion Bitumen which will be supplied and procured by the contractor himself at his own cost as per special condition appended including labour charges for preparing the surface for laying the tack coat and for applying the required quantity of bitumenius Binder as tack Coat by Bitumen sprayer including hire and fuel for all tools and plant employed etc., complete as per clause 502 of MORTH Rev-5 Specification . etc., complete as per standard specification
Applying Tack Coat over existing Prime coating WMM surface using 2.5 Kg of Bitumen emulsion(RS-1) per 10 Sq.m including labour charges for preparing the surface removing of binder materials and other foreign matter with wire brushes and small picks & axes sweeping with brooms on soft brushes and finally dusting with old gunny bag and/or compressed air and applying the required quantity of bitumen emulsion as tack coat manually etc., Complete complying with 503 of MORTH.Rev-5 specifications.
Providing and laying Tack Coat over existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for prparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying 50 mm conslidated thick Dense Bituminuous macadam using 0.24 cum of 26.50-13.20 mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm and below and with 53.20kg of VG30(60/70Bulk ) Bitumen premixing 10 sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tons capacity,conveying the mix by tipper trucks to work site,spreading the mix uniform thickness of 50mm with paver to the specified grade and cross sections and compaction by vibratory/ pneumatic roller to the required density etc., including labour for accending to pavor at sites etc., including hire charges and fuel charges for 20-30T CMP with bitumen Boiler,tipper trucks, paver finisher/9 m paver finisher,vibratory/ pneumatic rollers and all other tools and plant required including to all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5.
Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 50.30 Kgs of VG30 (60/70Bulk ) Bitumen and for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
Providing and laying of hot applied thermoplastic compound 2.5 mm. thick including reflectorising glass beads @ 250 gms. per sqm. area, thickness of 2.5 mm. is exclusive of surface applied glass beads as per IRC: 35. The finished surface to be level, uniform and free from streaks and holes etc. complete. (as per MORT & H specification No.803). (CE(H) Chennai Memo No.4848/BOE/138/2011-1/ dated:06.01.12)
Providing and laying Well Gravel for 150 mm thick in layers of finished thickness of 75 mm thick each including cost and conveyance of Gravel from approved quarry to working site and stacking them to departmental gauge for pre measurement including labourcharges for sperading watering including all leads for water and consolidation by power roller rolling including hire and fuel charges for all tools and plants employed and all other incidental charges etc, complete complying as per clause 301&305 of MORTH specification.
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS 20B and Sand, silt or other loose soil, wet sand, silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water wherever necessary refilling the sides of foundation with excavated soil other than sand in layers of 15cm thick well rammed and completed, cleaning and levelling the site etc., complete - Footings - First Depth Upto 2.00M SS 20B TNDSS NO. 23 &24 V, VI (S2) VI 9
Plain Cement concrete of mix 1:4:8 (One cement four M-sand and eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including labour charges, transporting and placing in position including shoring, strutting forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification. TNDSS NO.28 V,VI S25
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists(Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for the following items.(RCC floor slab, roof slab, Rectangular/ square, Tee/ Ell beams, Lintels, staircase waist slabs, Landing slabs, Landing beam, Portico beam etc., ). TNDSS NO.86 K, 86 A
side Wall Up to 1 M Hight
Side Wall Above to 1 M Hight
Plain Surface for culvert
Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers -
Supplying, fabricating and placing in position TMT steel Bar for all reinforced cement concrete works as per design given including cost of steel and binding wire with all conveyance and lead charges in all floors etc.complete complying with standard specifications and as directed by the deparmental engineers. TNBP No:30
MAINTENANCE
Towards the charges for routine maintenance of the road work executed under NABARD SCHEME including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works
Clearing and Grubbing by light Jungle removing and disposing of all materials such as bushes, shrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness as rubbish including all other incidental charges etc., complete as per MO
Upkeeping 1st Year (50%)
Upkeeping 2st Year (60%)
Upkeeping 3st Year (60%)
Upkeeping 4st Year (60%)
Upkeeping 5st Year (60%)
Earth work excavting and deposting on bank with initial lead of 10m & initial lift of 2m in Hard sriff clay, Stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with samll size bouders SS20A for making up the berms. as
Upkeeping for 1st Year (40%)
Upkeeping for 2st Year (40%)
Upkeeping for 3st Year (40%)
Upkeeping for 4st Year (40%)
Upkeeping for 5st Year (40%)
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributo at the rate of 0.20 kg/sqm on the prepared bituminous/ granular surface cleaned with mcchanical broom as per clause 503
4 th year 3%
5 th year 5%
Providing and laying bituminous concreete 30 mm Consolidated thick using 0.13 cum of 19.00 - 9.50 mm 0.17 cum of 9.50-2.36 mm and 0.26 cum of 2.36 mm & below with 50.30 kgs of 60/70 Grade Bulk aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mcchanical rollers to the required density etc., including labour for loading bitumen into bitumen tank and metal to feeder unit. labour for attending ot paver site etc., including hire chares nad fuel charges for 20-30 ton CMP With bitumen boiler tipper, trucks, paver Finisher/9M. Vibrator rollers and all other tools and plants required. including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
4 th year 3%
5 th year 5%
M/s PRS Construction (BID ID -1178356)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
Tendernotice_2.pdf
PDF • 0.34 MB
BOQ_592046.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .