| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹391.5 CrAccepted-AOC | ₹391.5 Cr Quoted ₹416.0 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹459.3 CrRejected-AOC | ₹459.3 Cr | L2 | Rejected-AOC Not awarded |
Tender Value
Refer Docs
Closing Date
10 Sept 2021, 12:00 pmClosed
Chief Engineer, PHED, Govt. of Manipur
O/o Chief Engineer, PHED, Khuyathong, Govt. of Manipur.
Water Supply Project for Manipur State.(SH Providing Drinking Water Supply to Rural Area of Manipur(408 schemes), works) Package RWS P X (W)
2021_PHED_1299_1
CE/PHE/3-94/NDB(W)/P-X/4017
Open Tender
Miscellaneous Works
1095 days
Imphal
Please refer Tender documents.
2 documents required · 2 mandatory
₹1 L
EE Kakching PHE Division, PHED, Manipur.
Exempted
Through Video Conference.
3 Nov 2021
27 Feb 2021
10 Sept 2021
27 Feb 2021
10 Sept 2021
27 Feb 2021
4 Mar 2021
Amount
Kakching PHE Division:
Augmentation of water treatment plant at Khunu Laba Ching (0.6 MLD). The source of raw water is Nambul river which is at a distance of 284.00 m from the treatment plant including site levelling/land development (i/c demolition of old structure if any)m; approach road etc. complete and the following items as below :
Design, Drawing, Construction, Testing and Commissioning of Intake Weir of length 4.75m, width 3.50m and height 2m including necessary R.C.C/Masonry Chambers, site developmentworks i/cproviding fixing and testing pipes, pipe specials, pipe supports etc. complete.
Design, Drawing, Construction, Testing and Commissioning of R.C.C. Aerator Fountain of about 4.5m height above GL consisting of at least 4 to 6 cascades with space requirement of 0.70 sq.m. per MLD exposed faces line with china glazed colour tiles of approved pattern i/c fixing & providing inlet pipe of suitable pipes i/c smooth finishing of supporting columns and verticalwalls, watering, curing, weatherproof painting two coats and giving water tightness test, etc. complete.
Design, Drawing & Construction of pump house with RCC Column, lintel, brickwall, ramp, suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 12 sqm with pump foundation for 2 nos. of pumpset complete. Supply and Installation of electrical pumpset with necessary component, fitting & Electrical work complete for raw water pumps (Worthington/ Mather Platt/ Kirloskar make) with motors (2 working and 1 stand by) i/cmanually operated travelling crane with girder for lifting the pumps at Intake site.
Design, Drawing & Construction of pump house with RCC Column, lintel, brickwall, ramp, suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 12 sqm with pump foundation for 2 nos. of pumpset complete at WTP Site.
Design, Drawing, Construction, Testing and Commissioning of RCC settling tank with necessary pipe fittings for raw water inlet, outlet & sludge washout system etc. complete
Design, Drawing, Construction, Testing and Commissioning of RCC Slow Sand Filter with suitable under-drainage system & collection chamber for clear water along with pipe fitting and wash out system with necessary inspection chamber including necessary internal fitting and suitable filter media etc. complete.
Design, Drawing, Construction, Testing and Commissioningof RCC clear water reservoir (0.432 ML) with slab roofing, necessary pipe fitting, manhole with cover, air vent & fitted with disinfection dosing unit etc. complete.
Design, Drawing, Enerzisation, Procurement and Installation of suitable transformer i/cerection & stringing of necessary HT & LT line for power supply having capacity enough to operate the pumping machineries for the scheme/intake, including internal and external lighting, testing etc. all complete.
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge, laying of DI fittings (specials)/CI fittings (specials)mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete :(a)DI250mmdia.= 1071.00 m (b)DI200mmdia.= 1286.00 m (c)DI150mmdia.= 2500.00 m Total = 4857.00 m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :GI Pipes (Medium) (a)GI 100mmdia.= 4470.00m (b) GI80mmdia. = 2112.00m (c)GI65mmdia.= 2015.00m (d)GI 50mmdia.= 3975.00m Total = 12572.00m
Providing & laying of DI Raw Water Pipes (K-7 class) conforming to IS 12288:2002 specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of DI fittings(specials)/CI fittings (specials) and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and chambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings etc. and disinfection of all pipes, trial run and commissioning etc. complete from Intake to Khunu Laba WTP:DI 150mm dia. - 284.00 m
Design, Drawing and Construction of Brick wall fencing with RCC Column of suitable foundation of length 116m and height 2.5m with 2 shutter of length 1.85m and height 1.85m each with accessories, fitting etc. complete.
Design, Drawing and Construction of approach road i/c land development from Imphal Sugnu road to WTP site of length 350m
Design, Drawing and Construction of Pond :- 1no.of (52 x 42) sqm of required depth etc. complete.
Augmentation of water treatment plant at Waikhong Uchanpokpi Hill(0.17 MLD). The source of raw water is ToujengMaril (Natural Stream)which is at a distance of 802.00 m from the treatment plant including site levelling/land development ( i/c demolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing, Construction, Testing and Commissioning of Intake Weir of length 4.75m, width 3.50m and height 2m including necessary R.C.C /Masonry Chambers, site development works i/c providing fixing and testing pipes, pipe specials, pipe supports, etc. complete.
Design, Drawing & Construction of pump house with RCC Column, lintel, brickwall, ramp, suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 12 sqm with pump foundation for 2 nos. of pumpset complete. Supply and Installation of electrical pumpset with necessary component, fitting & Electrical work complete for raw water pumps (Worthington/ Mather Platt/ Kirloskar make) with motors (2 working and 1 stand by) i/c manually operated travelling crane with girder for lifting the pumps at Intake site.
Design, Drawing and Construction of pump house with RCC Column, lintel, brickwall, ramp, suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 12sqm with pump foundation for 2 nos. of pumpset complete at WTP site.
Design, Drawing, Construction, Testing and Commissioning of RCC settling tank with necessary pipe fittings for raw water inlet, outlet & sludge washout system etc. complete.
Design, Drawing, Enerzisation, Procurement and Installation of suitable transformer i/c erection & stringing of necessary HT & LT line for power supply having capacity enough to operate the pumping machineries for the scheme/intake, including internal and external lighting, testing etc. all complete.
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge, laying of DI fittings (specials)/CI fittings (specials) mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitable masonry chambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete :DI150mmdia.= 1000.00m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming to IS:1239(Pt-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonry chambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :GI Pipes (Medium) (a)GI 100mmdia.= 2000.00m (b)GI 80mmdia.= 1500.00m (c)GI 65mmdia.=1500.00m (d)GI 50mmdia.=800.00m Total = 5800.00m
Providing & laying of GI Raw main Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985, socket at one end and the protected with plastic thread protector, socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete From Intake to WTP : GI 100mmdia. - 500.00 m
Design, Drawing, Construction of angle iron fencing- 1.22.00 m high fencing with angle iron posts 1.80.00 m long 50x50x6 mm plates at every 2.44.00 m apart embedded in cement concrete blocks of mix 1:5:10 (1 cement : 5 fine sand :10 stone/agg/40mm gauge) 30.5x30.5x61 cm corner and at every 12th posts to be strutted, provided with 10 (ten) horizontal lines and 2(two) diagonals of G.I barbed wire 0.124 kg/m between two posts filled and fixed with G.I. staples i/c earth work in excavation etc complete of length 276.00m i/c standard steel gate of 2 shutter of length 1.85m and height 1.85m with necessary mechanical fittings etc. complete.
Repairing/making good of the following existing treatment units :
a) RCC Slow Sand Filter including removal, washing, cleaning and relaying of filter media including make up of deficit media etc. complete- 2 units of (13.80 x 13.80m).
b) RCC Service Reservoir – 0.087ML capacity
Augmentation of water treatment plant at Mantak (0.11 MLD). The source of raw water is Manipur river which is at a distance of 1000.00 m from the treatment plant including site levelling/land development (i/c demolition of old structure if any)m ; approach road etc. complete and the following items as below :
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonry chambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :GI Pipes (Medium)(a)GI 100mm dia.= 1000.00 m(b)GI 80mm dia.=900.00 m(c)GI 65mm dia.=700.00 mTotal = 2600.00 m
Procurement and installation of electrical pumpset with necessary component, fitting & electrical work etc. complete:a) Mantak Intake – 2nos.
Repairing/making good of the following existing treatment units :
a) RCC Settling Tank - 1 unit of (10.30m x 2m x 2.5m).
b) RCC Slow Sand Filter including removal, washing, cleaning and relaying of filter media including make up of deficit media etc. complete- 2 units of size (5.5m x 5.5m).
c) RCC Service Reservoir – 0.123ML capacity
d) RCC Service Reservoir – 0.068ML capacity
e) Repairing of the existing Step type intake which have 1 flight of 3.00 m length with landing(platform) for pumping i/c pump house and extension of 1 flight of 3m length by providing one no. of suitable pile foundation and landing(platform) with necessary mechanical and electrical fittings complete i/c manually operated travelling crane with girder for lifting the pumps.
Augmentation of water treatment plant at Hiyanglam (Sekmaijin) (0.38 MLD). The source of raw water is Sekmai Riverwhich is at a distance of 1000.00 m from the treatment plant including site levelling/land development ( i/c demolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing and Construction of pump house with RCC Column, lintel, brickwall, ramp, suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 12sqm with pump foundation for 2 nos. of pumpset complete.
Design, Drawing, Construction, Testing and Commissioning of RCC clear water underground zonal reservoir (0.147 ML) with slab roofing, necessary pipe fitting, manhole with cover, air vent & fitted with disinfection dosing unit etc. complete.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints,fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete : GI Pipes(Medium) (a)GI 100mm dia.= 3000.00 m (b)GI 80mm dia.= 2000.00 m (c)GI 65mm dia.= 2000.00 m Total = 7000.00 m
Procurement and installation of 15 HP electrical pumpset with necessary component, fitting & electrical work etc. complete at Laipangamba Zonal – 2nos.
Augmentation of water treatment plant at Mayenglamjao GP (Langmeidong) (1.44 MLD). The source of raw water is Sekmai Riverwhich is at a distance of 1000.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing, Construction, Testing and Commissioning of RCC Step Type Intake with suitable pile foundation, having 3 nos. of landing, 3 nos. of flight of 3m with necessarymechanical & electrical works including connecting walkway cum pipe carrying girder from Intake to river bund and construction of pump house with RCC Column, lintel, brick wall, ramp, suitable trusses with CGI roofing, doors, windows, electrification with good with pump foundation for 2 nos. of pumpset complete. Supply and installation of electrical pumpset with necessary component, fitting & Electrical work complete for raw water pumps (Worthington/ Mather Platt/ Kirloskar make) with motors(2 working and 1 stand by) i/c manually operated travelling crane with girder for lifting the pumps.
Design, Drawing, Construction, Testing and Commissioning of RCC clear water underground reservoir (0.309 ML) with slab roofing , necessary pipe fitting, manhole with cover , air vent& fitted with disinfection dosing unit etc. complete at Machin Manao Ching (Keirak).
Design, Drawing, Enerzisation, Procurement and Installation of suitable transformer i/cerection & stringing of necessary HT & LT line for power supply having capacity enough to operate the pumping machineries for the scheme/intake, including internal and external lighting, testing etc. all complete.
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge, laying of DI fittings (specials)/CI fittings (specials) mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete :(a)DI 200mm dia.= 1600.00m(b)DI 150mm dia.= 1200m Total = 2800m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :GI Pipes(Medium)(a)GI 100mm dia.= 4200.00m(b) GI 80mm dia. = 2500.00m(c)GI 65mm dia.= 2000.00m(d) GI 50 mm dia = 800.00m Total = 9500.00m
Augmentation of water treatment plant at Chingbei Toukhaibi under Kharungpat (0.02 MLD). The source of raw water is Natural Stream and Lakewhich is at a distance of 500.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing, Construction, Testing and Commissioning of Intake Weir at Natural Stream near Kharungpat of length 4.75m, width 3.50m and height 2m including necessaryR.C.C/Masonry Chambers, site developmentworks &Providing fixing and testing pipes, pipe specials, pipe supports, complete.
Design, Drawing, Construction, Testing and Commissioning of R.C.C. Aerator Fountain of about 4.5m height above GL consisting of atleast 4 to 6 cascades with space requirement of 0.70m2 per MLD exposed faces line with chinaglazed colourtiles of approved pattern i/c fixing &providing inlet pipe of suitable pipes i/csmooth finishing of supporting columns and verticalwalls, watering, curing, weatherproof painting two coats and giving water tightness test, etc.complete.
Design, Drawing & Construction of pump house with RCC Column, lintel, brickwall, ramp, suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 12 sqm with pump foundation for 2 nos. of pumpset complete. Supply and Installation of electrical pumpset with necessary component, fitting & Electrical work complete for raw water pumps (Worthington/ Mather Platt/ Kirloskar make) with motors (2 working and 1 stand by) i/cmanually operated travelling crane with girder for lifting the pumps at Intake site.
Design, Drawing & Construction of pump house with RCC Column, lintel, brickwall, ramp, suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 12 sqm with pump foundation for 2 nos. of pumpset complete. Supply and Installation of electrical pumpset with necessary component, fitting & Electrical work complete for raw water pumps (Worthington/ Mather Platt/ Kirloskar make) with motors (2 working and 1 stand by) i/cmanually operated travelling crane with girder for lifting the pumps at WTP site.
Design, Drawing, Construction, Testing and Commissioning of RCC settling tank with necessary pipe fittings for raw water inlet, supports outlet & sludge washout system etc. complete
Design, Drawing, Construction, Testing and Commissioning of RCC Slow Sand Filter with suitable under-drainage system & collection chamber for clear water along with pipe fitting and wash out system with necessary inspection chamber including necessary internal fitting and suitable filter media etc. complete.
Design, drawing & construction of RCC clear water underground reservoir (0.075 ML) with slab roofing , necessary pipe fitting, manhole with cover , air vent & fitted with disinfection dosing unit etc. complete.
Design, Drawing, Enerzisation, Procurement and Installation of suitable transformer i/cerection & stringing of necessary HT & LT line for power supply having capacity enough to operate the pumping machineries for the scheme/intake, including internal and external lighting, testing etc. all complete.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :GIPipes(Medium) (a)GI 100mmdia.= 500.00m (b) GI80mmdia. = 700.00m (c)GI65mmdia.= 600.00m (d) GI 50mm dia. = 500.00m Total = 2300.00m
Providing & laying of GI Raw main Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete from Intake to WTP : GI 80mmdia. - 300m
Design, Drawing and Construction of angle iron fencing- 1.22.00 m high fencing with angle iron posts 1.80.00 m long 50x50x6 mm plates at every 2.44.00 m apart embedded in cement concrete blocks of mix 1:5:10 (1 cement : 5 fine sand :10 stone/agg/40mm gauge) 30.5x30.5x61 cm corner and at every 12th posts to be strutted, provided with 10 (ten) horizontal lines and 2(two) diagonals of G.I barbed wire 0.124 kg/m between two posts filled and fixed with G.I. staples i/cearth work in excavation etc complete of length 116.00m i/cstandard steel gate of 2 shutter of length 1.85m and height 1.85m with necessarymechanical fittings complete.
Design, Drawing and Construction of approach road i/c land development from Kharungpat road to WTP site of length 80m.
Augmentation of water treatment plant at Loushipat (0.01 MLD). The source of raw water is Natural Stream and Lakewhich is at a distance of 750.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design and Drilling of 125/150mm dia Bore Hole by Drilling.00 machine including necessary site development works &Providing fixing and testing Internal pipes, pipespecials, pipesupports, etc. complete.
Design, Drawing & Construction of pump house with RCC Column, lintel, brickwall, ramp, suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 12 sqm with pump foundation for 2 nos. of pumpset complete. Supply and Installation of electrical pumpset with necessary component, fitting & Electrical work complete for raw water pumps (Worthington/ Mather Platt/ Kirloskar make) with motors (2 working and 1 stand by) i/cmanually operated travelling crane with girder for lifting the pumps at Intake site.
Design, Drawing, Construction, Testing and Commissioning of RCC settling tank with necessary pipe fittings for raw water inlet, supports outlet & sludge washout system etc. complete.
Design, Drawing, Construction, Testing and Commissioning of RCC clear water underground reservoir (0.075 ML) with slab roofing , necessary pipe fitting, manhole with cover , air vent& fitted with disinfection dosing unit etc. complete.
Design, Drawing, Enerzisation, Procurement and Installation of suitable transformer i/cerection & stringing of necessary HT & LT line for power supply having capacity enough to operate the pumping machineries for the scheme/intake, including internal and external lighting, testing etc. all complete.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :GIPipes(Medium) (a) GI80mmdia. = 1000.00m (b) GI 50mm dia. = 1000.00m Total = 2000.00m
Design, Drawing and Construction of angle iron fencing- 1.22.00 m high fencing with angle iron posts 1.80.00 m long 50 x 50 x 6 mm plates at every 2.44.00 m apart embedded in cement concrete blocks of mix 1:5:10 (1 cement : 5 fine sand :10 stone/agg/40mm gauge) 30.5x30.5x61 cm corner and at every 12th posts to be strutted, provided with 10 (ten) horizontal lines and 2(two) diagonals of G.I barbed wire 0.124 kg/m between two posts filled and fixed with G.I. staples i/cearth work in excavation etc complete of length 66.00m i/cstandard steel gate of 2 shutter of length 1.85m and height 1.85m with necessary mechanical fittings complete.
Design, Drawing and Construction of approach road i/c land development from Loushipat road to WTP site of length 80m
Augmentation of water treatment plant at Serou(0.54 MLD). The source of raw water is Chakpi Riverwhich is at a distance of 350.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing, Construction, Testing and Commissioning of RCC Step Type Intake with suitable pile foundation, having 3 nos. of landing, 3 nos. of flight of 3m with necessarymechanical & electrical works including connecting walkway cum pipe carrying girder from Intake to river bund and construction of pump house with RCC Column, lintel, brick wall, ramp, suitable trusses with CGI roofing, doors, windows, electrification with good finish with pump foundation for 2 nos. of pumpset complete. Supply and installation of electrical pumpset with necessary component, fitting & Electrical work complete for raw water pumps (Worthington/ Mather Platt/ Kirloskar make) with motors (2 working and 1 stand by) i/cmanually operated travelling crane with girder for lifting the pumps.
Design, Drawing, Construction, Testing and Commissioning of R.C.C. Aerator Fountain of about 4.5m height above GL consisting of atleast 4 to 6 cascades withspacerequirement of 0.70m2 perMLDexposedfaceslinewithchinaglazedcolourtilesofapprovedpattern i/cfixing &providing inlet pipe of suitable pipes i/csmooth finishing ofsupporting columns and vertical walls, watering, curing, weatherproof painting two coats and giving water tightness test, etc. complete.
Design, drawing & construction of pump house with RCC Column, lintel, brickwall, ramp, suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 12sqm with pump foundation for 2 nos. of pumpset complete. Supply and installation of electrical pumpset with necessary component, fitting & Electrical work complete for raw water pumps (Worthington/ Mather Platt/ Kirloskar make) with motors (2 working and 1 stand by) i/cmanually operated travelling crane with girder for lifting the pumps at WTP.
Design, drawing & construction of RCC settling tank (0.54 ML) capacity with necessary pipe fittings for raw water inlet, outlet& sludge washout system etc. complete.
Design, Drawing & Construction of RCC Slow Sand Filter with suitable under-drainage system & collection chamber for clear water along with pipe fitting and wash out system with necessary inspection chamber including necessary internal fitting and suitable filter media etc. complete
Design, Drawing, Construction, Testing and Commissioning of RCC clear water underground reservoir (0.33 ML) with slab roofing , necessary pipe fitting, manhole with cover , air vent& fitted with disinfection dosing unit etc. complete.
Design, Drawing , Enerzisation, Procurement and Installation of suitable transformer i/cerection & stringing of necessary HT & LT line for power supply having capacity enough to operate the pumping machineries for the scheme/intake, including internal and external lighting, testing etc. all complete.
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge, laying of DI fittings (specials)/CI fittings (specials)mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete :DI 100mmdia.= 1300.00m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :GIPipes(Medium) (a)GI 100mm dia.= 1450.00m (b) GI 80mm dia. = 1500.00m (c) GI 65mm dia. = 2080.00m (d) GI 50mm dia. = 3170.00m Total = 8200.00m
Providing & laying of GI Raw main Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete from Intake to WTP : GI 80mmdia. - 350.00m
Design, Drawing and Construction of angle iron fencing- 1.22.00 m high fencing with angle iron posts 1.80.00 m long 50x50x6 mm plates at every 2.44.00 m apart embedded in cement concrete blocks of mix 1:5:10 (1 cement : 5 fine sand :10 stone/agg/40mm gauge) 30.5x30.5x61 cm corner and at every 12th posts to be strutted, provided with 10 (ten) horizontal lines and 2(two) diagonals of G.I barbed wire 0.124 kg/m between two posts filled and fixed with G.I. staples i/cearth work in excavation etc complete of length 275.00m i/cstandard steel gate of 2 shutter of length 1.85m and height 1.85m with necessarymechanical fittings complete around WTP.
Design, Drawing and Construction of approach road i/c land development from Serou road to WTP Site of length 80m.
Augmentation of water treatment plant at Nurathel Hill, Sagolambi (0.12 MLD). The source of raw water is NongmaikhongMaril (Stream) which is at a distance of 150.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing, Construction, Testing and Commissioning of RCC Step Type Intake with suitable pile foundation, having 3 nos. of landing, 3 nos. of flight of 3m with necessarymechanical & electrical works including connecting walkway cum pipe carrying girder from Intake to river bund and construction of pump house with RCC Column, lintel, brick wall, ramp, suitable trusses with CGI roofing, doors, windows, electrification with good finish with pump foundation for 2 nos. of pumpset complete. Supply and installation of electrical pumpset with necessary component, fitting & Electrical work complete for raw water pumps (Worthington/ Mather Platt/ Kirloskar make) with motors (2 working and 1 stand by) i/cmanually operated travelling crane with girder for lifting the pumps.
Design, Drawing, Construction, testing and Commissioning of RCC clear water underground reservoir (0.075 ML) with slab roofing , necessary pipe fitting, manhole with cover , air vent& fitted with disinfection dosing unit etc. complete
Design, Drawing, Enerzisation, Procurement and Installation of suitable transformer i/cerection & stringing of necessary HT & LT line for power supply having capacity enough to operate the pumping machineries for the scheme/intake, including internal and external lighting, testing etc. all complete.
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge, laying of DI fittings (specials)/CI fittings (specials)mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete : DI150mmdia.= 850.00m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :GIPipes(Medium) (a)GI 100mmdia.= 1850.00m (b) GI80mmdia. = 1000.00m (c)GI65mmdia.= 1350.00m (d) GI 50mm dia. = 2300.00m Total = 6500.00m
Providing & laying of GI Raw main Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete : From Intake to WTP : GI 100mmdia. - 150m
Design, Drawing, Construction of angle iron fencing- 1.22.00 m high fencing with angle iron posts 1.80.00 m long 50x50x6 mm plates at every 2.44.00 m apart embedded in cement concrete blocks of mix 1:5:10 (1 cement : 5 fine sand :10 stone/agg/40mm gauge) 30.5x30.5x61 cm corner and at every 12th posts to be strutted, provided with 10 (ten) horizontal lines and 2(two) diagonals of G.I barbed wire 0.124 kg/m between two posts filled and fixed with G.I. staples i/cearth work in excavation etc complete of length 226.00m i/cstandard steel gate of 2 shutter of length 1.85m and height 1.85m with necessarymechanical fittings complete at WTP.
Repairing/ making good of the following existing treatment units :
a) RCC Settling Tank - 1 unit of (10.30m x 3.25m x 2.50m).
b) RCC Slow Sand Filter including removal, washing, cleaning and relaying of filter media including make up of deficit media - 2 units of (6m x 6m).
Augmentation of water treatment plant at Sora Karanchi (0.32 MLD). The source of raw water is Pond & natural stream near WTP which is at a distance of 250.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, drawing & Construction of pump house with RCC Column, lintel, brick wall, ramp, suitable trusses with CGI roofing, doors, windows, electrification with good finish with pump foundation for 3 nos. of pumpset complete. Supply and installation of electrical pumpset with necessary component, fitting & Electrical work complete for raw water pumps (Worthington/ Mather Platt/ Kirloskar make) with motors (2 working and 1 stand by) i/cmanually operated travelling crane with girder for lifting the pumps) at Intake.
Design, drawing & Construction of pump house with RCC Column, lintel, brick wall, ramp, suitable trusses with CGI roofing, doors, windows, electrification with good finish with pump foundation for 2 nos. of pumpset complete. Supply and installation of electrical pumpset with necessary component, fitting & Electrical work complete for raw water pumps (Worthington/ Mather Platt/ Kirloskar make) with motors (2 working and 1 stand by) i/cmanually operated travelling crane with girder for lifting the pumps at WTP.
Design, Drawing, Enerzisation, Procurement and Installation of suitable transformer i/cerection & stringing of necessary HT & LT line for power supply having capacity enough to operate the pumping machineries for the scheme/intake, including internal and external lighting, testing etc. all complete.
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge, laying of DI fittings (specials)/CI fittings (specials)mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete :DI 150mmdia.= 500.00m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete : GIPipes(Medium) (a)GI 100mmdia.= 2050.00m (b) GI80mmdia. = 1400.00m (c)GI65mmdia.= 1000.00m (d) GI 50mm dia. = 700.00m Total = 5150.00m
Providing & laying of GI Raw main Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete from Intake to WTP : GI 100mmdia. - 250.00m
Design, Drawing and Construction of Pukhri (Pond) as Source. (50m x 45m) of required depth at field.
Repairing/ making good of the following existing treatment units :
a) RCC Settling Tank - 1 unit of (12.60x4m x 2.50m)
b) RCC Slow Sand Filter including removal, washing, cleaning and relaying of filter media including make up of deficit media -2 units of (9m x 9m).
c) RCC Service Reservoir - 1 units of 0.108ML
Augmentation of water treatment plant at Bijoypur (0.04MLD). The source of raw water is Bijoypur Pond which is at a distance of 340.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing, Construction, Testing and Commissioning of RCC Step Type Intake with suitable pile foundation, having 3 nos. of landing of, 3 nos. of flight of 3m with necessarymechanical & electrical works including connecting walkway cum pipe carrying girder from Intake to river bund and construction of pump house with RCC Column, lintel, brick wall, ramp, suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 12sqm with pump foundation for 2 nos. of pumpset complete. Supply and installation of electrical pumpset with necessary component, fitting & Electrical work complete for raw water pumps (Worthington/ Mather Platt/ Kirloskar make) with motors (2 working and 1 stand by) i/cmanually operated travelling crane with girder for lifting the pumps at intake.
Design, Drawing & Construction of pump house with RCC Column, lintel, brickwall, ramp, suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 12sqm with pump foundation for 2 nos. of pumpset complete at WTP
Design, Drawing, Enerzisation, Procurement and Installation of suitable transformer i/cerection & stringing of necessary HT & LT line for power supply having capacity enough to operate the pumping machineries for the scheme/intake, including internal and external lighting, testing etc. all complete.
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge, laying of DI fittings (specials)/CI fittings (specials)mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete :DI 150mmdia.= 300.00m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete : GIPipes(Medium) (a)GI 100mmdia.= 2000.00m (b) GI80mmdia. = 3000.00m (c)GI65mmdia.= 1500.00m (d) GI 50mm dia. = 1500.00m Total = 8000.00m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete from Intake to WTP :GI 80mmdia. = 1000.00m
Design, Drawing, Construction of angle iron fencing- 1.22.00 m high fencing with angle iron posts 1.80.00 m long 50x50x6 mm plates at every 2.44.00 m apart embedded in cement concrete blocks of mix 1:5:10 (1 cement : 5 fine sand :10 stone/agg/40mm gauge) 30.5x30.5x61 cm corner and at every 12th posts to be strutted, provided with 10 (ten) horizontal lines and 2(two) diagonals of G.I barbed wire 0.124 kg/m between two posts filled and fixed with G.I. staples i/cearth work in excavation etc complete of length 155.00m i/cstandard steel gate of 2 shutter of length 1.85m and height 1.85m with necessarymechanical fittings complete at WTP.
Repairing/ making good of the following existing treatment units :
a) RCC Settling Tank - 1 unit of (10.40m x2.6m x 2.50m)
b) RCC Slow Sand Filter including removal, washing, cleaning and relaying of filter media including.00 make up of deficit.00 media- 2 units of (5.5m x 5.5m)
c) RCC Service Reservoir - 1 units of 0.043ML capacity
Design, Drawing and Construction of Pukhri (Pond) as Source. (40m x 35m) of required depth at field.
Augmentation of water treatment plant atArongNongmaikhong(0.53MLD). The source of raw water is Manipur River which is at a distance of 500.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing and Construction of pump house with RCC Column, lintel, brick wall, ramp, suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 12 sqm with pump foundation for 2 nos. of pumpset complete. Supply and installation of electrical pumpset with necessary component, fitting & Electrical work complete for raw water pumps (Worthington/ Mather Platt/ Kirloskar make) with motors (2 working and 1 stand by) i/cmanually operated travelling crane with girder for lifting the pumps at intake.
Design, Drawing, Construction, Testing and Commissioning of RCC settling tank (0.53 ML) with necessary pipe fittings for raw water inlet, outlet& sludge washout system etc. complete.
Design, Drawing, Construction, Testing and Commissioning of RCC Slow Sand Filter with suitable under-drainage system & collection chamber for clear water along with pipe fitting and wash out system with necessary inspection chamber including necessary internal fitting and suitable filter media etc. complete
Design, Drawing, Construction, Testing and Commissioning of RCC clear water underground reservoir (0.363 ML) with slab roofing , necessary pipe fitting, manhole with cover , air vent& fitted with disinfection dosing unit etc. complete.
Design, Drawing, Enerzisation, Procurement and Installation of suitable transformer i/cerection & stringing of necessary HT & LT line for power supply having capacity enough to operate the pumping machineries for the scheme/intake,including internal and external lighting, testing etc. all complete.
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge, laying of DI fittings (specials)/CI fittings (specials)mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete :DI 150mmdia.= 500.00m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :GIPipes(Medium) a)GI 100mmdia.= 2100.00m (b) GI80mmdia. = 2000.00m (c)GI65mmdia.= 960.00m (d) GI 50mm dia. = 945.00m Total = 6,005.00m
Providing & laying of GI Raw main Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :GI 100mmdia. to500.00m
Design, Drawing and Construction of approach road i/c land development from ArongNongmaikhong road to WTP Site for a distance of 80m
Augmentation of water treatment plant at Chairen Khongnang Leikai (0.25MLD). The source of raw water is Manipur River which is at a distance of 300.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge, laying of DI fittings (specials)/CI fittings (specials)mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete :DI 150mmdia.= 220m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :GIPipes(Medium) (a)GI 100mmdia.= 1000.00m (b)GI 80mmdia.= 1500.00m (c)GI 65mmdia.= 900.00m (d) GI 50mm dia = 770.00m Total = 4170.00m
Design, Drawing, Construction of Brick wall fencingwith RCC Column of suitable foundation of length 60m and height 2.5m with 2 shutter of length 1.85m and height 1.85.00 m each with accessories, fitting etc. complete.
Procurement and installation of electrical pumpset with necessary component, fitting & electrical work etc. complete:a) Chairen WTP– 2nos.
Repairing/ making good of the following existing treatment units :
a) RCC Settling Tank - 1 unit of (13.40m x 4m x 2.7m)
b) RCC Slow Sand Filter including removal, washing, cleaning and relaying of filter media including make up of deficit of.00 media- 2 units of (6.5m x 6.5m).
c) RCC Service Reservoir – 0.187MLD capacity
d) RCC Step type intake- Repairing of the existing Step type intake which have 1 flight of 3.00 m length with landing (platform) for pumping i/cpump house and extension of 2 flight of 3m length by providing 2 no. of suitable pile foundation and landing (platform) with necessarymechanical and electrical fittings complete i/cmanually operated travelling crane with girder for lifting the pumps.
(e) Repairing of the existing Chowkidar Quarter of area 64 sqm includingallCivil,Mechanical,Electricalworksetc.all complete
Augmentation of water treatment plant at Sarikkonjil (0.03MLD). The source of raw water is Pumlen Pat which is situated at a distance of around 500m towards the western side of the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing and Construction of pump house with RCC Column, lintel, brick wall, ramp, suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 12 sqm with pump foundation for 2 nos. of pumpset complete. Supply and installation of electrical pumpset with necessary component, fitting & Electrical work complete for raw water pumps (Worthington/ Mather Platt/ Kirloskar make) with motors (2 working and 1 stand by) i/cmanually operated travelling crane with girder for lifting the pumps at intake.
Design, Drawing & construction of pump house with RCC Column, lintel, brick wall, ramp, suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 12sqm with pump foundation for 2 nos. of pumpset complete at WTP
Design, Drawing, Enerzisation, Procurement and Installation of suitable transformer i/cerection & stringing of necessary HT & LT line for power supply having capacity enough to operate the pumping machineries for the scheme/intake, including internal and external lighting, testing etc. all complete
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge, laying of DI fittings (specials)/CI fittings (specials)mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete DI 150mmdia.= 200.00m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :GIPipes(Medium) (a)GI 100mmdia.= 1030.00m (b) GI80mmdia. = 700.00m (c)GI65mmdia.= 800.00m (d) GI 50mm dia. = 600.00m Total = 3130.00m
Providing & laying of GI Raw main Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete from Intake to WTP :GI 80mmdia. - 500.00m
Design, Drawing, Construction of angle iron fencing- 1.22.00 m high fencing with angle iron posts 1.80.00 m long 50x50x6 mm plates at every 2.44.00 m apart embedded in cement concrete blocks of mix 1:5:10 (1 cement : 5 fine sand :10 stone/agg/40mm gauge) 30.5x30.5x61 cm corner and at every 12th posts to be strutted, provided with 10 (ten) horizontal lines and 2(two) diagonals of G.I barbed wire 0.124 kg/m between two posts filled and fixed with G.I. staples i/cearth work in excavation etc complete of length 256.00m i/cstandard steel gate of 2 shutter of length 1.85m and height 1.85m with necessarymechanical fittings complete at WTP.
Design, Drawing and Construction of approach road i/c land development from Tongam road to WTP site of length - 100m
Repairing/ making good of the following existing treatment units :
a) RCC Settling Tank - 1 unit of (9.20m x 3.80m x 2.5m)
b) RCC Slow Sand Filter including removal, washing, cleaning and relaying of filter media including.00 make up of deficit.00 media-1 units of (8.7m x 4.7m).
c) RCC Service Reservoir – 0.044MLD capacity
Design, Drawing and Construction of Pond of (40 x 25) sqm of required depth etc.complete.
Operation and maintenance of the above Schemes for a period of 5years after commission of the project on turn key basis.
Thoubal PHE Division:
Augmentation of water treatment plant at Singa (0.10 MLD). The source of raw water is Thoubal river which is at a distance of 300.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing, Construction, Testing and Commissioning of RCC Step type Intake with suitable pile foundation, having 2 nos. of landing of size (2 x 2)m, 2 nos. of flight of 3m with necessarymechanical & electrical works including connecting walkway cum pipe carrying girder from Intake to river bund and construction of pump house with RCC Column, lintel, brick wall, ramp, suitable trusses with CGI roofing doors, windows, electrificationwithgood finish having a plinth area of (5.00m X 4.00m) with pump foundation for 2 nos of pumpset complete. Supply and Installation of electrical pumpset with necessary component, fitting & Electricalwork complete for raw water pumps (Worthington/Mather Platt/Kirloskar make) with motors (2 working and 1 stand by) ) i/cmanually operated travelling crane with girder for lifting the pumps for Singa(WTP) at Thoubal River.
Design, Drawing, Construction, Testing and Commissioning of R.C.C Slow Sand Filter with suitable underdrainage system and collection chamber for clear water along with pipe fittings and washout system with necessary inspection chamber including necessary internal fitting and suitable filter media etc. complete.
Design, Drawing ,Construction, Testing and Commissioning of RCC clear water Service reservoir (0.21ML) with slab roofing, necessary pipe fitting, manhole with cover, air vent& fitted with disinfection dosing unit etc. complete.
Procurement and installation of electrical pumpsets with necessary component, fitting and electrical works, etc. complete a) 15HP= 1No. For distribution
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge and laying of DI fittings (specials)/CI fittings (specials)mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitablechambers for Air Valve,Anchorblock,Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete (a) 150 mm dia. = 100.00 m (b) 100 mm dia. = 152.00 m Total = 602.00 m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector,socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete a) 80 mm dia. = 615.00 m b) 65 mm dia. = 806.00 m Total = 1421.00 m
Providing & laying of DI Raw Water Pipes (K-7 class) conforming to IS 12288:2002 specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of DI fittings(specials)/CI fittings (specials) and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and chambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings etc. and disinfection of all pipes, trial run and commissioning etc. complete. i) From Intake -to Singa WTP 100mm dia. - 350.00 m
Repairing/ making good of the following existing treatment units :
a) RCC Slow Sand Filter of area 132.0 sqm including removal,cleaning and relaying of filter media i/c makeup of deficit media.
Augmentation of water treatment plant at Phoudel(0.45 MLD). The source of raw water is Thoubal river which is at a distance of 500.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing, construction, Testing and Commissioning of RCC Step type Intake with suitable pile foundation, having 2 nos. of landing of size (2 x 2)m, 2 nos. of flight of 3m with necessarymechanical & electrical works including connecting walkway cum pipe carrying girder from Intake to river bund and construction of pump house with RCC Column, lintel, brick wall,ramp,suitable trusses with CGI roofing, doors, windows, electrification with good finish havinga plinth area of (5.00m X 4.00m) with pump foundation for 2 nos of pumpset complete. Supply and Installation of electrical pumpset with necessary component,fitting&Electricalwork complete for raw water pumps (Worthington/Mather Platt/Kirloskar make) with motors (2 working and 1 stand by) ) i/cmanually operated travelling crane with girder for lifting the pumps for Phoudel(WTP) at Thoubal River
Design, Drawing, Construction ,Testing and Commissioning of RCC clear water Service reservoir (0.18 ML )with slab roofing, necessary pipe fitting, manhole with cover, air vent& fitted with disinfection dosing unit etc. complete.
Design, Drawing, Construction, Testing and trial run of Overhead Tank 15.00 meter staging height of 0.45 ML capacity with suitable pile foundation, ancillary units, stairs/walkway/passage with railing for inspection & maintenance of OHT including RCC clear water Pumping station.Supply& installation of pump sets (Worthington/Mather Platt/Kirloskar make) capable of filling 0.45 ML in one and half hours with motors (two working & one standby)etc. complete.
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge and laying of DI fittings (specials)/CI fittings (specials)mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitablechambers for Air Valve,Anchorblock,Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete a) 200 mm dia. = 100.00 m b) 150 mm dia. = 387.00 m c) 100 mm dia. = 228.00 m Total = 1215.00 m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector,socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete GI 80 mm dia. = 242.00 m GI 65 mm dia. = 1492.00 m Total = 1734.00 m
Providing & laying of DI Raw Water Pipes (K-7 class) conforming to IS 12288:2002 specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of DI fittings(specials)/CI fittings (specials) and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and chambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings etc. and disinfection of all pipes, trial run and commissioning etc. complete. From Intake -to Phoudel WTP 100mm dia. - 500.00 m
Augmentation of water treatment plant at Charangpat Maklang(0.44 MLD). The source of raw water is Thoubal river which is at a distance of 500.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing, Construction of Pump House with RCC column, lintel, brickwall, ramp, suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 8.38 sqm at intake site and WTP respectively. Supply and installation of distribution/raw water pumps (Worthington/Mather Platt/Kirloskar make) with motors (1 working and 1 stand by) etc. all complete.
Design, Drawing, Construction, Testing and Commissioning of RCC settling tank (0.17ML) capacity with necessary pipe fittings for raw water inlet,outlet & sludge washout system etc. complete.
Design, Drawing, Construction ,Testing and Commissioning of R.C.C Slow Sand Filter with suitable underdrainage system and collection chamber for clear water along with pipe fittings and washout system with necessary inspection chamber including necessary internal fitting and suitable filter media, etc. complete.
Design, Drawing, Construction, Testing and Commissioning of RCC clear water Service reservoir (0.22 ML & 0.19 ML) with slab roofing, necessary pipe fitting, manhole with cover, air vent& fitted with disinfection dosing unit etc. complete.
Design, Drawing and Construction of Chowkidar Quarter cum Godown with RCC column of suitable foundation, brickwall, lintel, ramp, suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 32.00 sqm.
Design, Drawingand Construction of RCC Sanitary Toilet having 4.32 sqm area etc. all complete.
Design, Drawing ,Enerzisation, Procurement and Installation of suitable transformer i/cerection & stringing of necessary HT & LT line for power supply having capacity enough to operate the pumping machineries for the scheme/intake, including internal and external lighting, testing etc. all complete.
Design, Drawing, Construction, Testing and trial run of Overhead Tank 15.00 meter staging height of 0.45 ML capacity with suitable pile foundation, ancillary units, stairs/walkway/passage with railing for inspection & maintenance of OHT including RCC clear water Pumping station. Supply & installation of pump sets (Worthington/Mather Platt/Kirloskar make) capable of filling 0.45 ML in one and half hours with motors (two working & one standby)etc. complete.
Design, Drawing, Construction, Testing and trial run of Overhead Tank 15.00 meter staging height of 0.25 ML capacity with suitable pile foundation, ancillary units, stairs/walkway/passage with railing for inspection & maintenance of OHT including RCC clear water Pumping station.Supply & installation of pump sets (Worthington/Mather Platt/Kirloskar make) capable of filling 0.25 ML in one and half hours with motors (two working & one standby)etc. complete.
Procurement and installation of electrical pumpsets with necessary component, fitting and electrical works, etc. complete a) 25HP= 1No. For distribution.
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge and laying of DI fittings (specials)/CI fittings (specials)mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitablechambers for Air Valve,Anchorblock,Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete a) 250 mm dia. = 30.00 m b) 200 mm dia. = 1649.00 m c) 150 mm dia. = 1590.00 m d) 100 mm dia. = 2129.59.00 m Total = 5898.57.00 m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector,socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete a) 80 mm dia. = 3640.77.00 m b) 65 mm dia. = 4594.00 m Total = 8235.43.00 m
Providing & laying of DI Raw Water Pipes (K-7 class) conforming to IS 12288:2002 specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of DI fittings(specials)/CI fittings (specials) and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and chambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings etc. and disinfection of all pipes, trial run and commissioning etc. complete. i) From Pump house to Charangpatmaklang WTP 100mm dia. – 500m
Repairing/ making good of the following existing treatment units :
a) Slow Sand Filter of 202.50 sqm including removal, washing, cleaning and relaying of slow sand filters media i/c makeup of deficit media.
Augmentation of water treatment plant at Lamding(0.49 MLD). The source of raw water is Wangjing river which is at a distance of 400.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing, Construction, Testing and trial run of Overhead Tank 15.00 meter staging height of 0.45 ML capacity with suitable pile foundation, ancillary units, stairs/walkway/passage with railing for inspection &maintenance of OHT including RCC clear water Pumping station.Supply & installation of pump sets (Worthington/Mather Platt/Kirloskar make) capable of filling 0.45 ML in one and half hours with motors (two working & one standby)etc. complete.
Design, Drawing and construction of Brick wall fencing of length 24.00m and height 2.30m with RCC column of suitable foundation with steel gate complete with accessories, fitting etc. complete.
Augmentation of water treatment plant at Sapam(0.84MLD). The source of raw water is Wangjing river which is at a distance of 100.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing, Construction,Testing and Commissioning of RCC settling tank(0.35 ML) capacity with necessary pipe fittings for raw water inlet,outlet& sludge washout system etc. complete.
Design, Drawing, Construction, Testing and Commissioning of R.C.C Slow Sand Filter with suitable underdrainage system and collection chamber for clear water along with pipe fittings and washout system with necessary inspection chamber including necessary internal fitting and suitable filter media, etc.
Design, Drawing, Construction ,Testing and Commissioning of RCC clear waterService Reservoir (0.49 ML) with slab roofing, necessary pipe fitting, manhole with cover, air vent & fitted with disinfection dosing unit etc. complete – 2nos.at Sapam and Papal.
Design, Drawing, Construction, Testing and trial run of Overhead Tank 15.00 meter staging height of 0.25 ML capacity with suitable pile foundation, ancillary units, stairs/walkway/passage with railing for inspection & maintenance of OHT including RCC clear water Pumping station and pump house with RCC column, lintel, brick wall,ramp suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 8.40 sqm with pump foundation for 2 nos of pumpset complete.Supply & installation of pump sets (Worthington/Mather Platt/Kirloskar make) capable of filling 0.25 ML in one and half hours with motors (two working & one standby)etc. complete .
Design, Drawing, Construction of Chowkidar Quarter cum Godown with RCC column of suitable foundation, brickwall, intel, ramp, suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 36.00 sqm.
Design, Drawing and Construction of Pond of 62.24m X 52.98m at Sapam.
Design, Drawing,Enerzisation, Procurement and Installation of suitable transformer i/cerection & stringing of necessary HT & LT line for power supply having capacity enough to operate the pumping machineries for the scheme/intake, including internal and external lighting, testing etc. all complete.
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge and laying of DI fittings (specials)/CI fittings (specials)mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitablechambers for Air Valve,Anchorblock,Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete (a) 150 mm dia. = 2500.00 m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector,socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete a) 100 mm dia = 4275.00 m b) 80 mm dia. = 5000.00 m c) 65 mm dia. = 8000.00 m Total = 17275.00 m
Repairing/ making good of the following existing treatment units :
a) RCC Settling tankof 0.10ML capacity including necessary fittings.
Augmentation of water treatment plant at Samaram(0.49MLD). The source of raw water is Samaram Pond which is at a distance of 20.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing, Construction, Testing and Commissioning of RCC settling tank (0.23 ML) capacity with necessary pipe fittings for raw water inlet, outlet & sludge washout system etc. complete.
Design, Drawing, Construction, Testing anmd Commissioning of R.C.C Slow Sand Filter with suitable underdrainage system and collection chamber for clear water along with pipe fittings and washout system with necessary inspection chamber including necessary internal fitting and suitable filter media, etc. complete
Design, Drawing ,Construction ,Testing and Commissioning of RCC clear waterService Reservoir (0.28 ML) with slab roofing, necessary pipe fitting, manhole with cover, air vent& fitted with disinfection dosing unit etc. complete.
Design, Drawing, Construction, Testing and trial run of Overhead Tank 15.00 meter staging height of 0.45 ML capacity with suitable pile foundation, ancillary units, stairs/walkway/passage with railing for inspection & maintenance of OHT including RCC clear water Pumping station andpump house with RCC column, lintel, brick wall,ramp suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 8.40 sqm with pump foundation for 2 nos of pumpset complete. Supply&installation of pump sets (Worthington/Mather Platt/Kirloskar make) capable of filling 0.45 ML in one and half hours with motors (two working & one standby)etc. complete at Samaram.
Design, Drawing, Construction of Chowkidar qtr cum godown withRCC column of suitable foundation,brickwall, lintel,ramp,suitable trusses with CGI roofing,doors, window, electrification with good finish having a plinth area of of 35.60 sqm
Repairing/ making good of the following existing treatment units :
a) R.C.C. Settling Tank of 0.25 ML capacity including necessary R.C.C/ Masonry chambers, site development works & Providing fixing and testing Internal pipes, pipe specials complete at Samaram.
Augmentation of water treatment plant at Sangaiyumpham Pulleipokpi (0.49MLD). The source of raw water is Wangjing River which is at a distance of 400.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing, Construction, Testing and Commissioning of RCC settling tank(0.32 ML) capacity with necessary pipe fittings for raw water inlet,outlet& sludge washout system etc. complete.
Design, Drawing, Construction Testing & Commissioning of R.C.C Slow Sand Filter with suitable underdrainage system and collection chamber for clear water along with pipe fittings and washout system with necessary inspection chamber including necessary internal fitting and suitable filter media, etc. complete.
Design, Drawing , Construction ,Testing and Commisssioning of RCC clear waterService Reservoir (0.36 ML) with slab roofing, necessary pipe fitting, manhole with cover, air vent& fitted with disinfection dosing unit etc. complete.
Design, Drawing, Construction, Testing and trial run of Overhead Tank 15.00 meter staging height of 0.45 ML capacity with suitable pile foundation, ancillary units, stairs/walkway/passage with railing for inspection & maintenance of OHT including RCC clear water Pumping station and pump house with RCC column, lintel, brick wall,ramp,suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 8.40 sqm with pump foundation for 2 nos of pumpset complete. Supply & installation of pump sets (Worthington/Mather Platt/Kirloskar make) capable of filling 0.45 ML in one and half hours with motors (two working & one standby)etc. complete at Sangaiyumpham
Design, Drawing, Construction of Chowkidar qtr cum godown with RCC column of suitable foundation,brickwall, lintel,ramp,suitable trusses with CGI roofing,doors, window, electrification with good finish having a plinth area of 35.60 sqm.
Design, Drawing and Construction of Pond of 19,239 cum at Sangaiyumpham Pulleipokpi WSS
Augmentation of water treatment plant at Sangaiyumpham kranchi (0.45MLD). The source of raw water is Wangjing River which is at a distance of 500.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing, Construction ,Testing and Commisssioningof R.C.C Settling tank(0.25 ML )capacity with necessary pipe fittings for raw inlet, outlet and sludge washout system, etc. complete .
Design, Drawing , Construction ,Testing and Commisssioningof R.C.C Slow Sand Filter with suitable underdrainage system and collection chamber for clear water along with pipe fittings and washout system with necessary inspection chamber including necessary internal fitting and suitable filter media, etc. complete.
Design, Drawing , Construction ,Testing and Commisssioningof RCC clear waterService Reservoir (0.28 ML) with slab roofing, necessary pipe fitting, manhole with cover, air vent& fitted with disinfection dosing unit etc. complete.
Design, Drawing, Construction, Testing and trial run of Overhead Tank 15.00 meter staging height of 0.25 ML capacity with suitable pile foundation, ancillary units, stairs/walkway/passage with railing for inspection & maintenance of OHT including RCC clear water Pumping station and pump house with RCC column, lintel, brick wall,ramp suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 8.40 sqm with pump foundation for 2 nos of pumpset complete. Supply& installation of pump sets (Worthington/Mather Platt/Kirloskar make) capable of filling 0.25 ML in one and half hours with motors (two working & one standby)etc. complete at SangaiyumphamKranchi.
Design, Drawing, Construction of Chowkidar qtr cum godown with RCC column of suitable foundation,brickwall, lintel,ramp,suitable trusses with CGI roofing,doors, window, electrification with good finish having a plinth area of 35.60 sqm.
Design, Drawing ,Enerzisation, Procurement and Installation of suitable transformer i/cerection & stringing of necessary HT & LT line for power supply having capacity enough to operate the pumping machineries for the scheme/intake, including internal and external lighting, testing etc all complete.
Design, Drawing and Construction of Brick wallfencing of length 50.00m and height 2.30m with RCC column of suitable foundation with steel gate complte with accessories, fitting etc. complete.
Augmentation of water treatment plant at Wangbal Zonal(0.43MLD). The source of raw water is Arong River which is at a distance of 780.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing,Construction, Testing and Commissioning of RCC Step type Intake with suitable pile foundation, having 3 nos. of landing of size (2 x 2)m, 3 nos. of flight of 3m with necessarymechanical & electrical works including connecting walkway cum pipe carrying girder from Intake to river bund andconstruction of pump house with RCC column, lintel,brick wall, ramp ,suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of (5.00m X 4.00m) with pump foundation for 2 nos of pumpset complete. Supply and Installation of electrical pumpset with necessary component, fitting & Electricalwork complete for raw water pumps (Worthington/Mather Platt/Kirloskar make) with motors (2 working and 1 stand by) ) i/cmanually operated travelling crane with girder for lifting the pumps for Wangbal Zonal(WTP) at Arong River.
Design, Drawing, Construction, Testing and Commissioning of R.C.C. Aerator Fountainof about 2.5m height above GL consisting of at least 4 to 6 cascades with space requirement of 0.70 m2 per MLD exposed faces line with china glazed colour tiles of approved pattern i/cfixing & providing inlet pipe of suitable pipes i/csmooth finishing of supporting columns and vertical walls, watering, curing, weatherproof painting two coats and giving water tightness test, etc. complete.
Design, Drawing , Construction ,Testing and Commisssioningof R.C.C Settling tank(0.10 ML) capacity with necessary pipe fittings for raw inlet, outlet and sludge washout system, etc. complete.
Design, Drawing , Construction ,Testing and Commisssioningof R.C.C Slow Sand Filter with suitable underdrainage system and collection chamber for clear water along with pipe fittings and washout system with necessary inspection chamber including necessary internal fitting and suitable filter media, etc. complete.
Design, Drawing , Construction ,Testing and Commisssioningof RCC clear waterService Reservoir (0.16 ML) with slab roofing, necessary pipe fitting, manhole with cover, air vent & fitted with disinfection dosing unit etc. complete.
Design, Drawing,Enerzisation, Procurement and Installation of suitable transformer i/cerection & stringing of necessary HT & LT line for power supply having capacity enough to operate the pumping machineries for the scheme/intake, including internal and external lighting, testing etc. all complete.
Design, Drawing, Construction, Testing and trial run of Overhead Tank 15.00 meter staging height of 0.25 ML capacity with suitable pile foundation, ancillary units, stairs/walkway/passage with railing for inspection & maintenance of OHT including RCC clear water Pumping station andpump house with RCC column, lintel, brick wall,ramp suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 8.40 sqm with pump foundation for 2 nos of pumpset complete.Supply& installation of pump sets (Worthington/Mather Platt/Kirloskar make) capable of filling 0.25 ML in one and half hours with motors (two working & one standby)etc. complete at Wangbal Zonal.
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge and laying of DI fittings (specials)/CI fittings (specials)mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitablechambers for Air Valve,Anchorblock,Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete :(a) DI 250 mm dia. = 15.00 m (b) DI 150 mm dia. = 1630.00 m Total = 1645.00 m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector,socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete Wangbal Zonal a) GI 100 mm dia. = 400.00 m b) GI 80 mm dia. = 312.00 m c) GI 65 mm dia. = 400.00 m Total = 1112.00 m
Providing & laying of GI Raw Water Pipes (K-7 class) conforming to IS 12288:2002 specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of DI fittings(specials)/CI fittings (specials) and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and chambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings etc. and disinfection of all pipes, trial run and commissioning etc. complete.From intake to Wangbal Zonal Treatment Plant a) GI 100 mm dia. = 780.00 m
Augmentation of water treatment plant at Haoreibi Mayai Leikai(0.32MLD). The source of raw water is Arong River which is at a distance of 400.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing, Construction, Testing and trial run of Overhead Tank 15.00 meter staging height of 0.45 ML capacity with suitable pile foundation, ancillary units, stairs/walkway/passage with railing for inspection & maintenance of OHT including RCC clear water Pumping station. Supply& installation of pump sets (Worthington/Mather Platt/Kirloskar make) capable of filling 0.45 ML in one and half hours with motors (two working & one standby)etc. complete.
Design, Drawing & Construction of of pump house with RCC column, lintel,brick wall, ramp ,suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 5.00m X 4.00m with pump foundation for 2 nos of pumpset complete. Procurement and installation of electrical pumpsets with necessary component, fitting and electrical works, etc. complete: a) 10HP-1 nos for Intake of HaoreibiMayaiLeikai WSS.
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge and laying of DI fittings (specials)/CI fittings (specials)mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitablechambers for Air Valve,Anchorblock,Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete HaoreibiMayaiLeikai WSS a) DI 200 mm dia. = 40.00m b) DI 150 mm dia. = 550.00m Total =590.00m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector,socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete HaoreibiMayaiLeikai WSS a) GI 100 mm dia. = 900.00 m b) GI 80 mm dia. = 2050.00 m c) GI 65 mm dia. = 3200.00 m Total = 6150.00 m
Repairing/ making good of the following existing treatment units :
a) Settling Tank (ST) of 0.24 ML capacity at Haoreibi MayaiLeikai.
b) Slow Sand Filter of 198.00 sqm area at HaoreibiMayaiLeikai including removal, Washing, cleaning and relaying of filter media i/c makeup of deficit media.
c) Service Reservoir (SR) of 0.16 ML capacity at Haoreibi MayaiLeikai.
d) Step type intake of 13.44 sqm area of HaoreibiMayaiLeikai.
e) Dismantled P/S tank at Haoreibi MayaiLeikai
Augmentation of water treatment plant at Nepra Company(0.11MLD). The source of raw water is Arong River which is at a distance of 300.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing, construction, Testing and Commissioning of RCC Step type Intake with suitable pile foundation, having 2 nos. of landing of size (2 x 2)m, 2 nos. of flight of 3m with necessarymechanical & electrical works including connecting walkway cum pipe carrying girder from Intake to river bund andconstruction of pump house with RCC column, lintel,brick wall, ramp ,suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of (4.60m X 3.60m) with pump foundation for 2 nos of pumpset complete.Supply and Installation of electrical pumpset with necessary component,fitting&Electricalwork complete for raw water pumps (Worthington/Mather Platt/Kirloskar make) with motors (2 working and 1 stand by) ) i/cmanually operated travelling crane with girder for lifting the pumps for Nepra Company at Khangabok Ph-II W/S Scheme at a distance of 300m from WTP to Arong river.
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge and laying of DI fittings (specials)/CI fittings (specials)mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitablechambers for Air Valve,Anchorblock,Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete (a) DI 150 mm dia. = 1200.00m(b) DI 100 mm dia. = 1000.00m Total = 2200.00m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector,socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete a) GI 80 mm dia. = 1000.00m b) GI 65 mm dia. = 900.00m Total= 1900.00m
Augmentation of water treatment plant at Kairembikhok (0.25MLD). The source of raw water is Pond which is at a distance of 200.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing & Construction of of pump house with RCC column, lintel, brick wall, ramp ,suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 8.37 sqm. with pump foundation for 2 nos of pumpset complete.Supply and installation of electrical pumpsets with necessary component, fitting and electrical works, etc. complete at Kairembikhok&Wangal.
Design, Drawing, Construction ,Testing and Commisssioning of RCC Settling Tank (MLD) capacity with necessary pipe fittings for raw inlet, outlet and sludge washout system etc. complete.
Design, Drawing , Construction ,Testing and Commisssioningof RCC Slow Sand Filter with suitable under drainage system and collection chamber for clear water along with pipe fittings and washout system with necessary inspection chambers including necessary internal pipe fitting and suitable filter media.etc. complete.
Design, Drawing , Construction ,Testing and Commisssioningof RCC clear waterService Reservoir (0.28 ML) with slab roofing, necessary pipe fitting, manhole with cover, air vent & fitted with disinfection dosing unit etc. complete
Design, Drawing, Construction of Chowkidar qtr cum godown with RCC column of suitable foundation,brickwall, lintel,ramp,suitable trusses with CGI roofing,doors, window, electrification with good finish having a plinth area of 31.95 sqm.
Design, Drawing ,Enerzisation, Procurement and Installation of suitable transformer i/cerection & stringing of necessary HT & LT line for power supply having capacity enough to operate the pumping machineries for the scheme/intake, including internal and external lighting, testing etc. all complete
Design, Drawing,Construction of Retaining Wall at (5.00 m length x4.5.00 m height) treatment site and (10.00m length x 4.5.00 m height) UyalPukhri
Design, Drawing , Construction of (100m x 70m ) and expansion (100m x 70m ) of Kairembikhokpukhri (source) having 29760 cum.
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge and laying of DI fittings (specials)/CI fittings (specials)mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitablechambers for Air Valve,Anchorblock,Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete (a) DI 150 mm dia. = 2400.00mb) DI 100 mm dia. = 2000.00m Total = 4400.00m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector,socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete a) GI 80 mm dia. = 1500.00mb) GI 65 mm dia. = 2000.00m Total = 3500.00m
Repairing/ making good of the following existing treatment units :
a) R.C.C. Settling Tank of 0.05 ML capacity including necessary R.C.C/ Masonry chambers, site development works & Providing fixing and testing Internal pipes, pipe specials complete at Kairembikhok.
b) R.C.C. Slow Sand Filter of area 52.02 sqm including removal, Washing, cleaning and relaying of filter media i/c makeup of deficit media.
c) R.C.C. Service Reservoirof 0.05 ML capacity including necessary R.C.C/ Masonry chambers, site development works & Providing fixing and testing Internal pipes, pipe specials complete
d) Chowkidar Quarter cum Godown with necessary electrical andmechanical works, complete
Augmentation of water treatment plant at Lamding Khumanthem Leikai (0.25MLD). The source of raw water is Wangjing River which is at a distance of 300.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing, construction, Testing and Commissioning of RCC Step type Intake for WTP (0.39 MLD) with suitable pile foundation, having 2 nos. of landing of size (2 x 2)m, 2 nos. of flight of 3m with necessarymechanical & electrical works including connecting walkway cum pipe carrying girder from Intake to river bund andconstruction of pump house with RCC column, lintel,brick wall, ramp ,suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 8.38sqm. with pump foundation for 2 nos of pumpset complete.Supply and Installation of electrical pumpset with necessary component,fitting&Electricalwork complete for raw water pumps (Worthington/Mather Platt/Kirloskar make) with motors (2 working and 1 stand by) ) i/cmanually operated travelling crane with girder for lifting the pumps for LamdingKhumanthemLeikai (WTP)to Wangjing river.
Design, Drawing & Construction of of pump house with RCC column, lintel, brick wall, ramp ,suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 8.38 sqm. with pump foundation for 2 nos of pumpset complete .Supply and installation of electrical pumpsets with necessary component, fitting and electrical works, etc. complete at LamdingKhumanthemLeikai for distribution.
Design, Drawing, Construction ,Testing and Commisssioning of R.C.C Settling tank (0.13 ML)capacity with necessary pipe fittings for raw inlet, outlet and sludge washout system, etc. complete.
Design, Drawing , Construction ,Testing and Commisssioningof R.C.C Slow Sand Filter with suitable underdrainage system and collection chamber for clear water along with pipe fittings and washout system with necessary inspection chamber including necessary internal fitting and suitable filter media, etc. complete.
Design, Drawing , Construction ,Testing and Commisssioningof RCC clear waterService Reservoir (0.18 ML) with slab roofing, necessary pipe fitting, manhole with cover, air vent & fitted with disinfection dosing unit etc. complete.
Design, Drawing, Construction of Chowkidar qtr cum godown with RCC column of suitable foundation,brickwall, lintel,ramp,suitable trusses with CGI roofing,doors, window, electrification with good finish having a plinth area of 31.95 sqm.
Design, Drawing, Construction, Testing and trial run of Overhead Tank 15.00 meter staging height of 0.25 ML capacity with suitable pile foundation, ancillary units, stairs/walkway/passage with railing for inspection & maintenance of OHT including RCC clear water Pumping station. Supply & installation of pump sets (Worthington/ Mather Platt/Kirloskar make) capable of filling 0.25 ML in one and half hours with motors (two working & one standby) etc. complete at Lamding Khumanthem Leikai.
Design, Drawing ,Enerzisation, Procurement and Installation of suitable transformer i/cerection & stringing of necessary HT & LT line for power supply having capacity enough to operate the pumping machineries for the scheme/intake, including internal and external lighting, testing etc. all complete.
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge and laying of DI fittings (specials)/CI fittings (specials) mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitable chambers for Air Valve, Anchor block, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete : (a) 150 mm dia. = 500.00m(b) 100 mm dia. = 600.00m Total = 1100.00m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector,socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :a) GI 80 mm dia. = 2000.00m b) GI 65 mm dia. = 2000.00m Total = 4000.00m
Providing & laying of DI Raw Water Pipes (K-7 class) conforming to IS 12288:2002 specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of DI fittings(specials)/CI fittings (specials) and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and chambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings etc. and disinfection of all pipes, trial run and commissioning etc. complete.From Intake to WTP(a) 100 mm dia. = 400m
Augmentation of water treatment plant at Kabrang (0.33 MLD). The source of raw water is Thoubal River which is at a distance of 500.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing & Construction of of pump house with RCC column, lintel, brick wall, ramp ,suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 8.37 sqm. with pump foundation for 2 nos of pumpset complete .Supply and installation of electrical pumpsets with necessary component, fitting and electrical works, etc. complete at Kabrang for :a)treatment plant.
Design, Drawing, Construction, Testing and Commissioning of R.C.C. Aerator Fountain of about 4.5m height above GL consisting of at least 4 to 6 cascades with space requirement of 0.70 m2 per MLD exposed faces line with china glazed colour tiles of approved pattern i/c fixing & providing inlet pipe of suitable pipes i/csmooth finishing of supporting columns and vertical walls, watering, curing, weatherproof painting two coats and giving water tightness test, etc. complete.
Design, Drawing,Construction, Testing and Commisssioning of R.C.C Settling tank (0.13 ML) capacity with necessary pipe fittings for raw inlet, outlet and sludge washout system, etc. complete.
Design, Drawing , Construction ,Testing and Commisssioningof R.C.C Slow Sand Filter with suitable underdrainage system and collection chamber for clear water along with pipe fittings and washout system with necessary inspection chamber including necessary internal fitting and suitable filter media, etc. complete .
Design, Drawing , Construction ,Testing and Commisssioningof RCC clear waterService Reservoir (0.36 ML) with slab roofing, necessary pipe fitting, manhole with cover, air vent & fitted with disinfection dosing unit etc. complete .
Repairing/ making good of the following existing treatment units :
a) RCC Slow Sand Filter of area 194.25 sqm including removal, washing, cleaning and relaying of slow sand filters media i/c makeup of deficit media.
b) R.C.C. Service Reservoir of 0.24 ML capacity including necessary R.C.C/ Masonry chambers, site development works & Providing fixing and testing Internal pipes, pipe specials complete at Kabrang WSS
c) R.C.C. intake of 0.40 ML capacity including necessary R.C.C Masonry chambers, site development works & Providing fixing and testing Internal pipes, pipe specials complete at Kabrang WSS
Design, Drawing & Construction of Approach road of length 500m with concrete side drain of length 200m at Kabrang i/c land development.
Design, Drawing and construction of Brick wall fencing of length 210.00m and height 2.30m with RCC column of suitable foundation i/c standard steel gate of 2 shutter of length 1.60m and height 2.80m each with accessopries, fitting etc.complete-210.00 m.
Design, Drawing,Enerzisation, Procurement and Installation of suitable transformer i/cerection & stringing of necessary HT & LT line for power supply having capacity enough to operate the pumping machineries for the scheme/intake, including internal and external lighting, testing etc. all complete.
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge and laying of DI fittings (specials)/CI fittings (specials)mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitablechambers for Air Valve,Anchorblock,Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete (a) DI 200 mm dia. = 1500.00m(b) DI 150 mm dia. = 2000.00m(c)DI 100 mm dia.= 2500.00m Total = 6000.00m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector,socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete a) GI 80 mm dia. = 3000.00mb) GI 65 mm dia. = 3100.00m Total = 6100.00m
Providing & laying of DI Raw Water Pipes (K-7 class) conforming to IS 12288:2002 specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of DI fittings(specials)/CI fittings (specials) and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and chambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings etc. and disinfection of all pipes, trial run and commissioning etc. complete.From Intake up-to Kabrang WTP(a) 100 mm dia. = 500m
Augmentation of water treatment plant at Laipharakpam (0.12 MLD). The source of raw water is Imphal River which is at a distance of 150.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing, Construction, Testing and trial run of Overhead Tank 15.00 meter staging height of 0.25 ML capacity with suitable pile foundation, ancillary units, stairs/walkway/passage with railing for inspection&.00 maintenance of OHT including RCC clear water Pumping station. Supply & installation of pump sets (Worthington/Mather Platt/Kirloskar make) capable of filling 0.25 ML in one and half hours with motors (two working & one standby)etc. complete at Laipharakpam.
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge and laying of DI fittings (specials)/CI fittings (specials)mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitablechambers for Air Valve,Anchorblock,Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete : i) DI 150 mm dia. = 40.00m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector,socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :(a) GI 100 mm dia. = 700.00m (b) GI 80 mm dia. = 300.00m (c) GI 65 mm dia. = 1350.00m Total = 2350.00m
Repairing/ making good of the following existing treatment units :
a) Service Reservoir of 0.08 ML capacity at Laipharakpam WSS
b) Slow Sand Filter of (Slow Sand Filter = 98 sqm. area) including removal, Washing, cleaning and relaying of filter media i/c makeup of deficit media.
Augmentation of water treatment plant at Atoukhong (0.23 MLD). The source of raw water is Imphal River which is at a distance of 300.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing, construction, Testing and Commissioning of RCC Step type Intake for WTP (0.23MLD) with suitable pile foundation, having nos. of landing of size (2 x 2)m, 2 nos. of flight of 3m with necessarymechanical & electrical works including connecting walkway cum pipe carrying girder from Intake to river bund and construction of pump house with RCC column, lintel ramp ,suitable trusses with CGI roofing, doors, windows, electrification with good finish with pump foundation for 2 nos of pumpset complete. Supply and Installation of electrical pumpset with necessary component, fitting & Electrical work complete for raw water pumps (Worthington/Mather Platt/Kirloskar make) with motors (2 working and 1 stand by) ) i/cmanually operated travelling crane with girder for lifting the pumps for AtoukhongWTPat Imphal River.
Design, Drawing, Construction, Testing and Commissioning of R.C.C. Aerator Fountainof about 2.5m height above GL consisting of at least 4 to 6 cascades with space requirement of 0.70 m2 per MLD exposed faces line with china glazed colour tiles of approved pattern i/cfixing & providing inlet pipe of suitable pipes i/csmooth finishing of supporting columns and vertical walls, watering, curing, weatherproof painting two coats and giving water tightness test, etc. complete.
Design, Drawing , Construction ,Testing and Commisssioningof RCC Slow Sand Filter having area of 200 sqm with suitable underdrainage system & collection chamber for clear water along with pipe fitting and wash out system with necessary inspection chamber including necessary internal fitting and suitable filter media etc.complete
Design, Drawing , Construction ,Testing and Commisssioningof RCC clear waterService Reservoir (0.46 ML) with slab roofing, necessary pipe fitting, manhole with cover, air vent & fitted with disinfection dosing unit etc. complete .
Design, Drawing, Construction, Testing and trial run of Overhead Tank 15.00 meter staging height of 0.25 ML capacity with suitable pile foundation, ancillary units, stairs/walkway/passage with railing for inspection & maintenance of OHT including RCC clear water Pumping station. Supply & installation of pump sets (Worthington/Mather Platt/Kirloskar make) capable of filling 0.25 ML in one and half hours with motors (two working & one standby)etc. complete.
Design, Drawing and construction of Brick wall fencing of length 250.00m and height 2.30m with RCC column of suitable foundation i/cstandard steel gate of 2 shutter of length 1.60m and height 2.80m each complete with accessories, fittings etc.complete.
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge and laying of DI fittings (specials)/CI fittings (specials)mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitablechambers for Air Valve,Anchorblock,Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete :a) DI 150 mm dia. = 105.00mb) DI 100 mm dia. = 1500.00m Total = 1605.00 m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector,socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete a) GI 80 mm dia. = 1850.00mb) GI 65 mm dia. = 3320.00m Total = 5170.00m
Repairing/ making good of the following existing treatment units :
a) Service Reservoir of 0.10 ML (6.5x6.6x2.5 )m at Atoukhong
b) Settling Tank of 0.18 ML (9.9 x7.5 x 2.5 )m at Atoukhong
c) Slow Sand Filter of 4 nos.of 147.62 sqm area including removal, Washing, cleaning and relaying of filter media i/c makeup of deficit media.
Augmentation of water treatment plant at Heibong Makhong (0.28MLD). The source of raw water is Imphal River which is at a distance of 100.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing, Construction, Testing and Commissioning of R.C.C. Aerator Fountainof about 2.5m height above GL consisting of at least 4 to 6 cascades with space requirement of 0.70 m2 per MLD exposed faces line with china glazed colour tiles of approved pattern i/cfixing & providing inlet pipe of suitable pipes i/csmooth finishing of supporting columns and vertical walls, watering, curing, weatherproof painting two coats and giving water tightness test, etc. for the capacity of 0.34 MLD complete.
Design, Drawing , Construction ,Testing and Commisssioningof R.C.C Slow Sand Filter with suitable underdrainage system and collection chamber for clear water along with pipe fittings and washout system with necessary inspection chamber including necessary internal fitting and suitable filter media, etc. complete.
Design, Drawing , Construction ,Testing and Commisssioningof RCC clear waterService Reservoir (0.32 ML) with slab roofing, necessary pipe fitting, manhole with cover, air vent & fitted with disinfection dosing unit etc. complete.
Design, Drawing , Construction ,Testing and Commisssioningof RCC clear water Zonal Reservoir (0.32 ML) with slab roofing, necessary pipe fitting, manhole with cover, air vent & fitted with disinfection dosing unit etc. complete.
Design, Drawing, Construction, Testing and Trial run of Overhead Tank-15.00 meter staging height of 1 no. 0.25ML capacity including suitable pile foundation with ancillary units etc. complete including RCC Clear Water Pumping Station at HeibongMakhong. Supply & installation of Pump sets (Worthington/Mather Platt/ Kirloskar make) capable of filling 0.25 ML in one and half hours with motors (one working & one standby) including all Civil, Mechanical, Electrical works etc. all complete.
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge and laying of DI fittings (specials)/CI fittings (specials)mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitablechambers for Air Valve,Anchorblock,Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete :a) DI 150 mm dia. = 845.00m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector,socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :(i) GI100 mm dia. = 935.00m b) GI 80 mm dia. = 1060.00m (iii) GI 65 mm dia. = 1300.00m Total = 3295.00m
Design,drawing & construction of brick wall fencing with RCC column of suitable foundation with steel gatecomplete with accessories fittingsetc.complete-215.00 m
Design,drawing & construction of brick wall fencing with RCC column of suitable foundation with steel gate complete with accessories fittings etc.complete-300.00 m
Procurement and installation of electrical pumpsets with necessary component, fitting and electrical works, etc. complete:a) 20HP -2 nos (one working & one standby) for Intake at Heibong Makhong
Repairing/ making good of the following existing treatment units :
a) Settling Tank (ST) of 0.24 ML capacity at HeibongMakhong.
b) Slow Sand Filter having area of 128.00 sqm including removal, Washing, cleaning and relaying of filter media i/c makeup of deficit media.
Augmentation of water treatment plant at Wangkhem(0.38 MLD). The source of raw water is Thoubal River which is at a distance of 400.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing, construction, Testing and Commissioning of RCC Step type Intake for WTP (0.38MLD) with suitable pile foundation, having 2 nos. of landing of size (2 x 2)m, 2 nos. of flight of 3m with necessarymechanical & electrical works including connecting walkway cum pipe carrying girder from Intake to river bund and construction of pump house with RCC column, lintel,brick wall, ramp ,suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of (5.00m X 4.00m) with pump foundation for 2 nos of pumpset complete.Supply and Installation of electrical pumpset with necessary component, fitting & Electrical work complete for raw water pumps (Worthington/Mather Platt/Kirloskar make) with motors (2 working and 1 stand by) ) i/cmanually operated travelling crane with girder for lifting the pumps for WangkhemWTPatThoubal River.
Design, Drawing, Construction, Testing and Commissioning of R.C.C. Aerator Fountainof about 4.5m height above GL consisting of at least 4 to 6 cascades with space requirement of 0.70 m2 per MLD exposed faces line with china glazed colour tiles of approved pattern i/cfixing & providing inlet pipe of suitable pipes i/csmooth finishing of supporting columns and vertical walls, watering, curing, weatherproof painting two coats and giving water tightness test, etc. complete.
Design, Drawing , Construction ,Testing and Commisssioningof R.C.C Settling tank (0.17 ML)capacity with necessary pipe fittings for raw inlet, outlet and sludge washout system, etc. complete.
Design, Drawing , Construction ,Testing and Commisssioningof R.C.C Slow Sand Filter with suitable underdrainage system and collection chamber for clear water along with pipe fittings and washout system with necessary inspection chamber including necessary internal fitting and suitable filter media, etc. complete .
Design, Drawing , Construction ,Testing and Commisssioningof RCC clear waterService Reservoir (0.21 ML) with slab roofing, necessary pipe fitting, manhole with cover, air vent & fitted with disinfection dosing unit etc. complete.
Design, Drawing, Construction of Chowkidar Quarter cum Godown with RCC column of suitable foundation,brickwall, lintel, ramp, suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 31.95 sqm.
Design, Drawing, Construction, Testing and Trial run of Overhead Tank-15.00 meter staging height of 0.45 ML capacity including suitable pile foundation with ancillary units etc. complete including RCC Clear Water Pumping Station and pump house with RCC column, lintel, brick wall,ramp suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 6.70 sqm with pump foundation for 2 nos of pumpset complete. Supply & installation of Pump sets (Worthington/Mather Platt/ Kirloskar make) capable of filling 0.45 ML in one and half hours with motors (one working & one standby)) i/cmanually operated travelling crane with girder for lifting the pumps with ancillary units, complete at Wangkhem.
Design, Drawing,Enerzisation, Procurement and Installation of suitable transformer i/cerection & stringing of necessary HT & LT line for power supply having capacity enough to operate the pumping machineries for the scheme/intake, including internal and external lighting, testing etc. all complete.
Procurement and installation of electrical pumpsets with necessary component, fitting and electrical wors, etc. complete works complete:a) 20HP-2No for distribution.
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge and laying of DI fittings (specials)/CI fittings (specials)mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitablechambers for Air Valve,Anchorblock,Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete :a) DI 200 mm dia. = 500.00m b) DI 150 mm dia. = 1000.00m c) DI 100 mm dia. = 600.00m Total = 2100.00m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector,socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :a) GI 80 mm dia. = 1200.00m b) GI 65 mm dia. = 2000.00m Total = 3200.00m
Providing & laying of DI Raw Water Pipes (K-7 class) conforming to IS 12288:2002 specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of DI fittings(specials)/CI fittings (specials) and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and chambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings etc. and disinfection of all pipes, trial run and commissioning etc. complete.From Intake up-to Wangkhem WTP (i) 100 mm dia. = 400m
Augmentation of water treatment plant at Leirongthel(0.31 MLD). The source of raw water is Thoubal River which is at a distance of 400.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing & Construction of pump house with RCC column, lintel ,brick wall, ramp suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 8.37 sqm with pump foundation for 2 nos of pumpset complete.Supply and installation of electrical pumpsets with necessary component, fitting and electrical works, etc. complete at Leirongthel for Intake.
Design, Drawing, Construction, Testing and Commissioning of R.C.C. Aerator Fountainof about 4.5m height above GL consisting of at least 4 to 6 cascades with space requirement of 0.70 m2 per MLD exposed faces line with china glazed colour tiles of approved pattern i/cfixing & providing inlet pipe of suitable pipes i/csmooth finishing of supporting columns and vertical walls, watering, curing, weatherproof painting two coats and giving water tightness test, etc. complete.
Design, Drawing , Construction ,Testing and Commisssioningof R.C.C Settling tank (0.15 ML)capacity with necessary pipe fittings for raw inlet, outlet and sludge washout system, etc. complete.
Design, Drawing , Construction ,Testing and Commisssioningof R.C.C Slow Sand Filter with suitable underdrainage system and collection chamber for clear water along with pipe fittings and washout system with necessary inspection chamber including necessary internal fitting and suitable filter media, etc. complete.
Design, Drawing , Construction ,Testing and Commisssioningof RCC clear waterService Reservoir (0.41 ML) with slab roofing, necessary pipe fitting, manhole with cover, air vent & fitted with disinfection dosing unit etc. complete .
Design, Drawing , Construction ,Testing and Commisssioningof RCC clear water Zonal Reservoir (0.41 ML) with slab roofing, necessary pipe fitting, manhole with cover, air vent & fitted with disinfection dosing unit etc. complete.
Design, Drawing, Construction, Testing and Trial run of Overhead Tank-15.00 meter staging height of 0.25 ML capacity including suitable pile foundation with ancillary units etc. complete including RCC Clear Water Pumping Station and pump house with RCC column, lintel, brick wall,ramp suitable trusses with CGI roofing, doors, windows, area of 6.70sqm. with pump foundation for 2 nos of pumpset complete. Supply & installation of Pump sets (Worthington/Mather Platt/ Kirloskar make) capable of filling 0.25 ML in one and half hours with motors (one working & one standby)) i/cmanually operated travelling crane with girder for lifting the pumps with ancillary units, complete at Leirongthel.
Design, Drawing, Construction of Chowkidar Quarter cum Godown with RCC column of suitable foundation,brickwall, lintel, ramp, suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 31.95 sqm.
Design, Drawing and construction of Brick wall fencing of length 200.00m and height 2.30m with RCC column of suitable foundation i/cstandard steel gate of 2 shutter of length 1.60m and height 2.80m each with accessories, fittings etc.complete -122.00 m.
Designing, Providing and Construction of Approached road and c/o cement concrete side drain having length of Approach road = 380.00m & side drain = 150.00m at Leirongthel W/S Scheme
Design, Drawing ,Enerzisation, Procurement and Installation of suitable transformer i/cerection & stringing of necessary HT & LT line for power supply having capacity enough to operate the pumping machineries for the scheme/intake, including internal and external lighting, testing etc. all complete.
Procurement and installation of electrical pumpsets with necessary component, fitting and electrical works, etc. complete a) 20HP - 2No for distribution
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge and laying of DI fittings (specials)/CI fittings (specials)mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitablechambers for Air Valve,Anchorblock,Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete a) DI 200 mm dia. = 500.00m b) DI 150 mm dia. = 1850.00m c) DI 100 mm dia. = 2000.00m Total = 4350.00m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector,socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.a) GI 80 mm dia. = 2000.00m b) GI 65 mm dia. = 1500.00m Total = 3500.00m
Providing & laying of DI Raw Water Pipes (K-7 class) conforming to IS 12288:2002 specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of DI fittings(specials)/CI fittings (specials) and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and chambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings etc. and disinfection of all pipes, trial run and commissioning etc. complete.From Intake up- to Leirongthel WTP (i) 100 mm dia. = 500m
Augmentation of water treatment plant at Yaithibi Khunou (0.07 MLD). The source of raw water is Yaithibi Pond which is at a distance of 500.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Drilling of Tube well for 150 mm dia. Bore hole by drilling machine at YaithibiKhunou.
Design, Drawing & Construction of pump house with RCC column, lintel ,brick wall, ramp suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 8.37 sqm with pump foundation for 2 nos of pumpset complete.a) Yaithibi WTP & b) Yaithibi Zonal Reservoir.
Design, Drawing, Construction of Pond (source) of 21417.00 cum at YaithibiKhunou.
Design, Drawing, Construction, Testing and Commissioning of R.C.C. Aerator Fountainof about 2.5m height above GL consisting of at least 4 to 6 cascades with space requirement of 0.70 m2 per MLD exposed faces line with china glazed colour tiles of approved pattern i/cfixing & providing inlet pipe of suitable pipes i/csmooth finishing of supporting columns and vertical walls, watering, curing, weatherproof painting two coats and giving water tightness test, etc. complete.
Design, Drawing , Construction ,Testing and Commisssioningof R.C.C Settling tank (0.11 ML)capacity with necessary pipe fittings for raw inlet, outlet and sludge washout system, etc. complete.
Design, Drawing , Construction ,Testing and Commisssioningof R.C.C Slow Sand Filter with suitable underdrainage system and collection chamber for clear water along with pipe fittings and washout system with necessary inspection chamber including necessary internal fitting and suitable filter media , etc. complete.
Design, Drawing , Construction ,Testing and Commisssioningof RCC clear waterService Reservoir (0.30 ML) with slab roofing, necessary pipe fitting, manhole with cover, air vent & fitted with disinfection dosing unit etc.complete.
Design, Drawing , Construction ,Testing and Commisssioningof RCC clear water Zonal Reservoir (0.09 ML) with slab roofing, necessary pipe fitting, manhole with cover, air vent & fitted with disinfection dosing unit etc. complete– 2 nos.
Procurement and installation of electrical pumpsets with necessary component, fitting and electrical works, etc. complete:a) 30HP-2 nos for Intake ( one standby) of YaithibiKhunou WSS
Design, Drawing, Construction of Chowkidar Quarter cum Godown with RCC column of suitable foundation,brickwall, lintel, ramp, suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 31.95 sqm.
Designing, Drawing and Construction of Sanitary Toilet for an area of 4.32 sqm at YaithibiKhunou.
Design,Drawing &construction of brick wall fencing with RCC column of suitable foundation with steel gate complete with accessories, fitting etc.complete-280.00 m.
Designing, Providing and Construction of Approached roadof length 500m with cement concrete side drain having length of 180.00m at YaithibiKhunou.
Design,Drawing and Construction of RCC Retaining wall of (9.70m x 4.50m) sqm at YaithibiKhunou.
Design, Drawing ,Enerzisation, Procurement and Installation of suitable transformer i/c erection & stringing of necessary HT & LT line for power supply having capacity enough to operate the pumping machineries for the scheme/intake, including internal and external lighting, testing etc. all complete. - 2 nos.
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge and laying of DI fittings (specials)/CI fittings (specials)mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitablechambers for Air Valve,Anchorblock,Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete :a) DI 200 mm dia. = 300.00mb) DI 150 mm dia. = 1500.00mc)DI100 mm dia. = 1500.00m Total = 3300.00m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector,socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :a) GI 80 mm dia. = 2500.00m b) GI 65 mm dia. = 3000.00m Total = 5500.00m
Providing & laying of DI Raw Water Pipes (K-7 class) conforming to IS 12288:2002 specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of DI fittings(specials)/CI fittings (specials) and suitable DI valves as per relevant IS Code. Design,drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and chambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings etc. and disinfection of all pipes, trial run and commissioning etc. complete. From Intake to YaithibiKhunou WTP (i) 100 mm dia. = 500m
Augmentation of water treatment plant at Pechi (0.12MLD). The source of raw water is Pond which is at a distance of 300.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing ,Construction of Pond having area of (94m x 94.00 m) with angled iron fencing around pond of lentgth 400.00 m around for Pechi.
Design, Drawing & Construction of pump house with RCC column, lintel ,brick wall, ramp suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 8.40sqmwith pump foundation for 2 nos of pumpset complete.Supply and installation of electrical pumpsets with necessary component, fitting and electrical works, etc. complete at Pechi
Design, Drawing, Construction, Testing and Commissioning of R.C.C. Aerator Fountainof about 2.5m height above GL consisting of at least 4 to 6 cascades with space requirement of 0.70 m2 per MLD exposed faces line with china glazed colour tiles of approved pattern i/cfixing & providing inlet pipe of suitable pipes i/csmooth finishing of supporting columns and vertical walls, watering, curing, weatherproof painting two coats and giving water tightness test, etc.allcomplete.
Design, Drawing , Construction ,Testing and Commisssioningof R.C.C Settling tank (0.09 ML)capacity with necessary pipe fittings for raw inlet, outlet and sludge washout system, etc. complete – 2 nos.
Design, Drawing , Construction ,Testing and Commisssioningof RCC Slow Sand Filter with suitable under drainage system and collection chamber for clear water along with pipe fittings and washout system with necessary inspection chambers including necessary internal pipe fitting and suitable filter media etc.
Design, Drawing , Construction ,Testing and Commisssioningof RCC clear waterService Reservoir (0.07 ML) with slab roofing, necessary pipe fitting, manhole with cover, air vent & fitted with disinfection dosing unit etc. complete - 2 nos.
Design, Drawing, Construction of Chowkidar Quarter cum Godown with RCC column of suitable foundation,brickwall, lintel, ramp, suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 31.95 sqm.
Design, Drawing and construction of Brick wall fencing of length 300.00m and height 2.30m with RCC column of suitable foundation i/cstandard steel gate of 2 shutter of length 1.60m and height 2.80m each with accessories,fitting etc. complete.
Designing, Drawing and Construction of Sanitary Toilet for an area of 4.32 sqm.
Designing, Providing and Construction of Approached road with cement concrete side drain at Pechi – 200m.
Design, Drawing ,Enerzisation, Procurement and Installation of suitable transformer i/cerection & stringing of necessary HT & LT line for power supply having capacity enough to operate the pumping machineries for the scheme/intake, including internal and external lighting, testing etc. all complete.
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge and laying of DI fittings (specials)/CI fittings (specials)mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitablechambers for Air Valve,Anchorblock,Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete :a) DI 150 mm dia. = 1500.00 m b) DI 100 mm dia. = 900.00 m Total = 2400.00 m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector,socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :a) GI 80 mm dia. = 1550.00 m b) GI 65 mm dia. = 1530.00 m Total = 3080.00 m
Providing & laying of DI Raw Water Pipes (K-7 class) conforming to IS 12288:2002 specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of DI fittings(specials)/CI fittings (specials) and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and chambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings etc. and disinfection of all pipes, trial run and commissioning etc. complete.From Intake up- to Pechi WTP (i) 100 mm dia. = 300m
Augmentation of water treatment plant at Chingtham (0.23MLD). The source of raw water is Pond which is at a distance of 300.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing & Construction of pump house with RCC column,lintel,brick wall, ramp suitable trusses, with CGI roofing , doors, windows, electrification with good finish having a plinth area 8.37sqm with pump foundation for 2 nos. of pumpset complete.Supply and installation of electrical pumpsets with necessary component, fitting and electrical works, etc. complete for intake at Chingtham.
Design, Drawing, Construction, Testing and Commissioning of R.C.C. Aerator Fountainof about 2.5m height above GL consisting of at least 4 to 6 cascades with space requirement of 0.70 m2 per MLD exposed faces line with china glazed colour tiles of approved pattern i/cfixing & providing inlet pipe of suitable pipes i/csmooth finishing of supporting columns and vertical walls, watering, curing, weatherproof painting two coats and giving water tightness test, etc.complete.
Design, Drawing, Construction, Testing and Commissioning of R.C.C Settling Tank (0.12 ML) Capacity with necessary pipe fittings for raw water inlet, outlet & sludge washout system etc. complete.
Design, Drawing , Construction ,Testing and Commisssioningof R.C.C Slow Sand Filter with suitable underdrainage system and collection chamber for clear water along with pipe fittings and washout system with necessary inspection chamber including necessary internal fitting and suitable filter media, etc. complete.
Design, Drawing , Construction ,Testing and Commisssioningof RCC clear waterService Reservoir (0.18 ML) with slab roofing, necessary pipe fitting, manhole with cover, air vent & fitted with disinfection dosing unit etc. complete.
Design, Drawing, Construction, Testing and Trial run of Overhead Tank-15.00 meter staging height of 0.25 ML capacity including suitable pile foundation with ancillary units etc. complete including RCC Clear Water Pumping Station and pump house with RCC column, lintel, brick wall,ramp suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of of 8.37 sqm. with pump foundation for 2 nos of pumpset complete. Supply & installation of Pump sets (Worthington/Mather Platt/ Kirloskar make) capable of filling 0.25 ML in one and half hours with motors (one working & one standby)) i/cmanually operated travelling crane with girder for lifting the pumps with ancillary units, complete.
Design, Drawing, Construction of Chowkidar Quarter cum Godown with RCC column of suitable foundation,brickwall, lintel, ramp, suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 31.95 sqm.
Design, Drawing ,Enerzisation, Procurement and Installation of suitable transformer i/cerection & stringing of necessary HT & LT line for power supply having capacity enough to operate the pumping machineries for the scheme/intake, including internal and external lighting, testing etc. all complete.
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge and laying of DI fittings (specials)/CI fittings (specials)mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitablechambers for Air Valve,Anchorblock,Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete:a) DI 150 mm dia. = 1400.00 m b) DI 100 mm dia. = 1200.00 m Total = 2600.00 m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector,socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :a) GI 80 mm dia. = 1000.00 m b) GI 65 mm dia. = 1000.00 m Total = 2000.00 m
Providing & laying of DI Raw Water Pipes (K-7 class) conforming to IS 12288:2002 specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of DI fittings(specials)/CI fittings (specials) and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and chambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings etc. and disinfection of all pipes, trial run and commissioning etc. complete.From Intake up- to Chingtham WTP (i) 100 mm dia. = 300m
Augmentation of water treatment plant at Nungei(0.29 MLD). The source of raw water is Imphal River which is at a distance of 500.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing, construction, Testing and Commissioning of RCC Step type Intake with suitable pile foundation, having 2 nos. of landing of size (2 x 2)m, 2 nos. of flight of 3m with necessarymechanical & electrical works including connecting walkway cum pipe carrying girder from Intake to river bund and construction of pump house with RCC column, lintel ramp ,suitable trusses with CGI roofing, doors, windows, electrification with good finish with pump foundation for 2 nos of pumpset complete.Supply and Installation of electrical pumpset with necessary component, fitting &Electrical work complete for raw water pumps (Worthington/Mather Platt/Kirloskar make) with motors (2 working and 1 stand by) ) i/cmanually operated travelling crane with girder for lifting the pumps for Nungei WTP at Imphal River.
Design, Drawing , Construction ,Testing and Commisssioning of R.C.C Settling tank (0.12 ML) capacity with necessary pipe fittings for raw inlet, outlet and sludge washout system, etc. complete .
Design, Drawing , Construction ,Testing and Commisssioningof R.C.C Slow Sand Filter with suitable underdrainage system and collection chamber for clear water along with pipe fittings and washout system with necessary inspection chamber including necessary internal fitting and suitable filter media, etc. complete .
Design, Drawing , Construction ,Testing and Commisssioningof RCC clear waterService Reservoir (0.31 ML) with slab roofing, necessary pipe fitting, manhole with cover, air vent & fitted with disinfection dosing unit etc. complete.
Design, Drawing, Construction, Testing and Trial run of Overhead Tank-15.00 meter staging height of 0.25 ML capacity including suitable pile foundation with ancillary units etc. complete including RCC Clear Water Pumping Station and pump house with RCC column, lintel, brick wall,ramp suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 8.40 sqm with pump foundation for 2 nos of pumpset complete. Supply & installation of Pump sets (Worthington/Mather Platt/ Kirloskar make) capable of filling 0.25 ML in one and half hours with motors (one working & one standby)) i/cmanually operated travelling crane with girder for lifting the pumps with ancillary units, complete at Nungei.
Design, Drawing, Construction of Chowkidar Quarter cum Godown with RCC column of suitable foundation,brickwall, lintel, ramp, suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 2 nos.-13.69sqm.
Design, Drawing and Construction of Sanitary Toilet for an area of 4.32 sqm at Nungei.
Design, Drawing and construction of Brick wall fencing of length 200.00m and height 2.30m withvRCC column of suitable foundationwith standard steel gate of 2 shutter of length 1.60m and height 2.80m each with accessories, fitting etc.complete.
Design, Drawing,Enerzisation, Procurement and Installation of suitable transformer i/cerection & stringing of necessary HT & LT line for power supply having capacity enough to operate the pumping machineries for the scheme/ intake, including internal and external lighting, testing etc. all complete at Nungei.
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge and laying of DI fittings (specials)/CI fittings (specials)mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitablechambers for Air Valve,Anchorblock,Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete :a) DI 200 mm dia. = 1000.00 m b) DI 150 mm dia. = 1300.00 m c) DI 100 mm dia. = 1000.00 m Total = 3300.00 m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector,socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :a) GI 80 mm dia. = 2000.00 m b) GI 65 mm dia. = 2500.00 m Total = 4500.00
Providing & laying of DI Raw Water Pipes (K-7 class) conforming to IS 12288:2002 specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of DI fittings(specials)/CI fittings (specials) and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and chambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings etc. and disinfection of all pipes, trial run and commissioning etc. complete.From Intake up- to Nungei WTP (i) 100 mm dia. = 500m
Augmentation of water treatment plant at Khellakhong Khong Manung (0.24MLD). The source of raw water is Imphal River which is at a distance of 1000.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing, construction, Testing and Commissioning of RCC Step type Intake for WTP (0.24 MLD) with suitable pile foundation, having 3 nos. of landing of size (2 x 2)m, 3 nos. of flight of 3m with necessarymechanical & electrical works including connecting walkway cum pipe carrying girder from Intake to river bund and construction of pump house with RCC column, lintel ramp ,suitable trusses with CGI roofing, doors, windows, electrification with good finish with pump foundation for 2 nos of pumpset complete. Supply and Installation of electrical pumpset with necessary component, fitting & Electrical work complete for raw water pumps (Worthington/Mather Platt/Kirloskar make) with motors (2 working and 1 stand by) ) i/cmanually operated travelling crane with girder for lifting the pumps for KhellakhongKhongManung WTP at Imphal River.
Design, Drawing, Construction, Testing and Commissioning of R.C.C. Aerator Fountain of about 2.5m height above GL consisting of at least 4 to 6 cascades with space requirement of 0.70 m2 per MLD exposed faces line with china glazed colour tiles of approved pattern i/cfixing & providing inlet pipe of suitable pipes i/csmooth finishing of supporting columns and vertical walls, watering, curing, weatherproof painting two coats and giving water tightness test, etc. complete.
Design, Drawing , Construction ,Testing and Commisssioningof R.C.C Settling tank (0.23 ML) capacity with necessary pipe fittings for raw inlet, outlet and sludge washout system, etc. complete.
Design, Drawing , Construction ,Testing and Commisssioningof R.C.C Slow Sand Filter with suitable underdrainage system and collection chamber for clear water along with pipe fittings and washout system with necessary inspection chamber including necessary internal fitting and suitable filter media , etc. complete.
Design, Drawing, Construction, Testing and Trial run of Overhead Tank-15.00 meter staging height of 0.25 ML capacity including suitable pile foundation with ancillary units etc. complete including RCC Clear Water Pumping Station and pump house with RCC column, lintel, brick wall,ramp,suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 14.45 sqm with pump foundation for 2 nos of pumpset complete. Supply & installation of Pump sets (Worthington/Mather Platt/ Kirloskar make) capable of filling 0.25 ML in one and half hours with motors (one working & one standby)) i/cmanually operated travelling crane with girder for lifting the pumps with ancillary units, complete at KhellakhongKhongManung.
Design, Drawing, Construction of Chowkidar Quarter cum Godown with RCC column of suitable foundation,brickwall, lintel, ramp, suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area 32.00 sqm area.
Design, Drawing ,Enerzisation, Procurement and Installation of suitable transformer i/cerection & stringing of necessary HT & LT line for power supply having capacity enough to operate the pumping machineries for the scheme/intake, including internal and external lighting, testing etc. all complete.
Design, Drawing and construction of Brick wall fencing with RCC Column of suitable foundation with steel gate complete with accessories , fitting etc. complete –128.00 m.
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge and laying of DI fittings (specials)/CI fittings (specials)mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitablechambers for Air Valve,Anchorblock,Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete:a) DI 150 mm dia. = 740m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector,socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete:a) GI 100 mm dia. = 500.00 m b) GI 80 mm dia. = 300.00 m c) GI 65 mm dia. = 1150.00 m Total = 1950.00 m
Providing & laying of GI Raw Transmission Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector,socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of DI fittings(specials)/CI fittings(specials) and suitable DI valves as per relevant IS Code. chambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.From WTP to source – KhellakhongKhongManung i) 100mm dia. - 850m
Augmentation of water treatment plant at Uchiwa (0.24MLD). The source of raw water is Imphal River which is at a distance of 100.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing, construction, Testing and Commissioning of RCC Step type Intake with suitable pile foundation, having 3 nos. of landing of size (2 x 2)m, 3 nos. of flight of 3m with necessarymechanical & electrical works including connecting walkway cum pipe carrying girder from Intake to river bund. Supply and Installation of electrical pumpset with necessary component, fitting & Electrical work complete for raw water pumps (Worthington/Mather Platt/Kirloskar make) with motors (2 working and 1 stand by) ) i/cmanually operated travelling crane with girder for lifting the pumps for Uchiwa WTP at Imphal River.
Design, Drawing, Construction, Testing and Trial run of Overhead Tank-15.00 meter staging height of 0.25 ML capacity including suitable pile foundation with ancillary units etc. complete including RCC Clear Water Pumping Station. Supply & installation of Pump sets (Worthington/Mather Platt/ Kirloskar make) capable of filling 0.25 ML in one and half hours with motors (one working & one standby)) i/cmanually operated travelling crane with girder for lifting the pumps with ancillary units, complete at Uchiwa.
Design, Drawing ,Enerzisation, Procurement and Installation of suitable transformer i/cerection & stringing of necessary HT & LT line for power supply having capacity enough to operate the pumping machineries for the scheme/intake, including internal and external lighting, testing etc. all complete
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge and laying of DI fittings (specials)/CI fittings (specials)mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitablechambers for Air Valve,Anchorblock,Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete (i) DI 150 mm dia. = 740m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector,socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :a) GI 100 mm dia. = 1950.00 m b) GI 80 mm dia. = 800.00 m c) GI 65 mm dia. = 2050.00 m Total = 4800.00 m
Repairing/making good of the following existing treatment units :
a) Settling Tank (ST) of 0.25 ML capacity at Uchiwa.
b) Service Reservoir (SR) of 0.11 ML capacity at Uchiwa.
c) Service Reservoir (SR) of 0.12 ML capacity at Uchiwa.
d) Slow Sand Filter of 109.52 sqm including removal, Washing, cleaning and relaying of filter media i/c makeup of deficit media.
Augmentation of water treatment plant at Leishangthem (0.87 MLD). The source of raw water is Thoubal River which is at a distance of 500.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing , Construction ,Testing and Commisssioningof RCC clear waterService Reservoir (0.19 ML) with slab roofing, necessary pipe fitting, manhole with cover, air vent & fitted with disinfection dosing unit etc.complete.
Design, Drawing, Construction, Testing and Trial run of Overhead Tank-15.00 meter staging height of 0.45 ML capacity including suitable pile foundation with ancillary units etc. complete including RCC Clear Water Pumping Station. Supply & installation of Pump sets (Worthington/Mather Platt/ Kirloskar make) capable of filling 0.45 ML in one and half hours with motors (one working & one standby)) i/cmanually operated travelling crane with girder for lifting the pumps with ancillary units, complete atLeishangthem.
Supply and installation of electrical pumpsets with necessary component, fitting and electrical works, etc. complete a) 30HP – 1No for distribution
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge and laying of DI fittings (specials)/CI fittings (specials)mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitablechambers for Air Valve,Anchorblock,Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete a) DI 150mm dia = 2250.00 m b) DI 100mm dia = 1924.00 m Total = 4174.00 m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector,socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete GI pipes (Medium) a) GI 80mm dia = 982.00 m b) GI 65mm dia = 675.00 m Total = 1657.00 m
Augmentation of water treatment plant at Khekman(1.02 MLD). The source of raw water is Thoubal River which is at a distance of 400.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing, construction, Testing and Commissioning of RCC Step type Intake with suitable pile foundation, having 2 nos. of landing of size (2 x 2)m, 2 nos. of flight of 3m with necessarymechanical & electrical works including connecting walkway cum pipe carrying girder from Intake to river bund and construction of pump house with RCC column, lintel, brick wall, ramp ,suitable trusses with CGI roofing doors, windows, electrification with good finish having a plinth area of (5.00m X 4.00m)with pump foundation for 2 nos of pumpset complete. Supply and Installation of electrical pumpset of 10 HP with necessary component,fitting&Electrical work complete for raw water pumps (Worthington/Mather Platt/Kirloskar make) with motors (2 working and 1 stand by) ) i/cmanually operated travelling crane with girder for lifting the pumps for Khekman.
Supply and installation of electrical pumpsets with necessary component, fitting and electrical works, etc. complete a) 35HP – 1No for distribution b) 20HP=2Nos. for distribution, c) 15HP=2Nos. for distribution
Design, Drawing, Construction,Testing and Commisssioningof R.C.C Settling tank (0.17 ML)capacitywith necessary pipe fittings for raw inlet, outlet and sludge washout system, etc. complete.
Design, Drawing , Construction ,Testing and Commisssioningof R.C.C Slow Sand Filter with suitable underdrainage system and collection chamber for clear water along with pipe fittings and washout system with necessary inspection chamber including necessary internal fitting and suitable filter media, etc. complete.
Design, Drawing , Construction ,Testing and Commisssioningof RCC clear waterService Reservoir (0.25ML & 0.19 ML) with slab roofing, necessary pipe fitting, manhole with cover, air vent & fitted with disinfection dosing unit etc. complete .
Design, Drawing, Construction, Testing and Trial run of Overhead Tank-15.00 meter staging height of (0.45 ML & 0.25 ML) capacity including suitable pile foundation with ancillary units etc. complete including RCC Clear Water Pumping Station and pump house with RCC column, lintel,brick wall,ramp ,suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 14.45 sqm.with pump foundation for 2 nos of pumpset complete.Supply & installation of Pump sets (Worthington/Mather Platt/ Kirloskar make) capable of filling (0.45 ML& 0.25 ML) in one and half hours with motors (one working & one standby)m ; etc. complete at Khekman.
Design, Drawing and construction of Brick wall fencing of length 150.00mand height 2.30m with RCC Column of suitable foundation with steel gate of 2 shutter of length 1.60m and height 2.80m each complete with accessories , fitting etc. complete –150.00 m.
Design, Drawing and construction of Brick wall fencing of length 180.00m and height 2.30m with RCC column of suitable foundation i/cstandard steel gate of 2 shutter of length 1.60m and height 2.80m each complete with accessories ,fitting etc. complete.
Design, Drawing ,Enerzisation, Procurement and Installation of suitable transformer i/cerection & stringing of necessary HT & LT line for power supply having capacity enough to operate the pumping machineries for the scheme/intake, including internal and external lighting, testing etc. all complete.
Repairing of 162.00 sqm area R.C.C. Slow Sand Filter, including necessary R.C.C/ Masonry chambers, site development works & Providing fixing and testing Internal pipes, pipe specials complete at Khekman WSS
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge and laying of DI fittings (specials)/CI fittings (specials)mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitablechambers for Air Valve,Anchorblock,Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete a) DI 200mm dia = 700.00 m b) DI 150mm dia = 2477.00 m c) DI 100mm dia = 1693.00 m Total = 4870.00 m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector,socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete a) GI 80mm dia = 3891.00 m b) GI 65mm dia = 4218.00 m Total = 8109.00 m
Providing & laying of DI Raw Water Pipes (K-7 class) conforming to IS 12288:2002 specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of DI fittings(specials)/CI fittings (specials) and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and chambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings etc. and disinfection of all pipes, trial run and commissioning etc. complete.From Intake -to Khekman WTP i) 100mm dia. - 400.00 m
Augmentation of water treatment plant at Moijing Leingoijing(0.64MLD). The source of raw water is Thoubal River which is at a distance of 800.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing, construction, Testing and Commissioning of RCC Step type Intake with suitable pile foundation, having 3 nos. of landing of size (2 x 2)m, 3 nos. of flight of 3m with necessarymechanical & electrical works including connecting walkway cum pipe carrying girder from Intake to river bund and construction of pump house with RCC column, lintel,brick wall,ramp suitable trusses with CGI roofing, doors, windows, electrification with good finish with pump foundation for 2 nos of pumpset complete .Supply and Installation of electrical pumpset with necessary component, fitting & Electrical work complete for raw water pumps (Worthington/Mather Platt/Kirloskar make) with motors (2 working and 1 stand by) ) i/cmanually operated travelling crane with girder for lifting the pumps for MoijingLeingoijing (WTP) at Thoubal River.
Design, Drawing , Construction ,Testing and Commisssioningof RCC clear waterService Reservoir (0.41 ML) with slab roofing, necessary pipe fitting, manhole with cover, air vent & fitted with disinfection dosing unit etc. complete.
Design, Drawing, Construction, Testing and Trial run of Overhead Tank-15.00 meter staging height of 0.25 ML capacity including suitable pile foundation with ancillary units etc. complete including RCC Clear Water Pumping Station. Supply & installation of Pump sets (Worthington/Mather Platt/ Kirloskar make) capable of filling 0.25 ML in one and half hours with motors (one working & one standby) etc.complete.
Design, Drawing and construction of Brick wall fencing of length 250.00mand height 2.30mwith RCC Column of suitable foundation with standard steel gate of 2 shutter of length 1.60m and height 2.80m each complete with accessories, fitting etc. complete.
Repairing/making good of the following existing treatment units :
a) Settling Tank of 0.18 ML (9.9 x7.5 x 2.5 )m at MoijingLeingoijing WSS
b) Slow Sand Filter of 2 nos.of 369.05 sqm area at MoijingLeingoijing WSS including removal, Washing, cleaning and relaying of filter media i/c makeup of deficit media.
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge and laying of DI fittings (specials)/CI fittings (specials)mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitablechambers for Air Valve,Anchorblock,Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete a) DI 150mm dia = 600.00 m b) DI 100mm dia =1550.00 m Total=2150.00 m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector,socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.a) GI 80mm dia = 1250.00 m b) GI 65mm dia = 3750.00 m Total = 5000.00m
Augmentation of water treatment plant at Irong Khunou(0.40MLD). The source of raw water is Imphal River which is at a distance of 150.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing, construction, Testing and Commissioning of RCC Step type Intake with suitable pile foundation, having 3 nos. of landing of size (2 x 2)m, 3 nos. of flight of 3m with necessarymechanical & electrical works including connecting walkway cum pipe carrying girder from Intake to river bund and construction of pump house with RCC column, lintel,brick wall,ramp suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of with pump foundation for 2 nos of pumpset complete. Supply and Installation of electrical pumpset with necessary component, fitting & Electrical work complete for raw water pumps (Worthington/Mather Platt/Kirloskar make) with motors (2 working and 1 stand by) ) i/cmanually operated travelling crane with girder for lifting the pumps for IrongKhunou (WTP) at Imphal River.
Design, Drawing, Construction, Testing and Commissioning of R.C.C. Aerator Fountainof about 2.5m height above GL consisting of at least 4 to 6 cascades with space requirement of 0.70 m2 per MLD exposed faces line with china glazed colour tiles of approved pattern i/cfixing & providing inlet pipe of suitable pipes i/csmooth finishing of supporting columns and vertical walls, watering, curing, weatherproof painting two coats and giving water tightness test, etc. complete.
Design, Drawing , Construction ,Testing and Commisssioningof R.C.C Settling tank (0.22 ML) capacity with necessary pipe fittings for raw inlet, outlet and sludge washout system, etc. complete.
Design, Drawing , Construction ,Testing and Commisssioningof R.C.C Slow Sand Filter with suitable underdrainage system and collection chamber for clear water along with pipe fittings and washout system with necessary inspection chamber including necessary internal fitting and suitable filter media, etc. complete.
Design, Drawing , Construction ,Testing and Commisssioningof RCC clear waterService Reservoir (0.20 ML) with slab roofing, necessary pipe fitting, manhole with cover, air vent & fitted with disinfection dosing unit etc. complete.
Design, Drawing, Construction, Testing and Trial run of Overhead Tank-15.00 meter staging height of 0.45 ML capacity including suitable pile foundation with ancillary units etc. complete including RCC Clear Water Pumping Station and pump house with RCC column, lintel, brickwall,ramp suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 14.45 sqm.,with pump foundation for 2 nos of pumpset complete. Supply & installation of Pump sets (Worthington/Mather Platt/ Kirloskar make) capable of filling 0.45 ML in one and half hours with motors (one working & one standby)) i/cmanually operated travelling crane with girder for lifting the pumps with ancillary units, complete at IrongKhunou.
Design, Drawing, Construction of Chowkidar Quarter cum Godown with RCC column of suitable foundation,brickwall, lintel, ramp, suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area 32.00 sqm area.
Design, Drawing ,Enerzisation, Procurement and Installation of suitable transformer i/cerection & stringing of necessary HT & LT line for power supply having capacity enough to operate the pumping machineries for the scheme/intake, including internal and external lighting, testing etc. all complete.
Design, Drawing and construction of Brick wall fencing with RCC Column of suitable foundation with steel gate complete with accessories, fitting etc. complete –130.00 m.
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge and laying of DI fittings (specials)/CI fittings (specials)mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitablechambers for Air Valve,Anchorblock,Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete : a) DI 200 mm dia. = 40.00 m b) DI 150 mm dia. = 1000.00 m Total = 1400.00 m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector,socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete : a) GI 100 mm dia. = 950.00 m b) GI 80 mm dia. = 800.00 m c) GI 65 mm dia. = 800.00 m Total = 2550.00 m
Providing & laying of GI Raw Transmission Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector,socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of DI fittings(specials)/CI fittings(specials) and suitable DI valves as per relevant IS Code. chambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete. (i) From WTP to source – IrongKhunou 100mm dia. - 150m
Augmentation of water treatment plant at Phanjakhong (0.18MLD). The source of raw water is Itok River which is at a distance of 500.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing, construction, Testing and Commissioning of Dug Well Intake Works of 4.35 dia,mechanical & electrical works including suitable pile foundation with ancillary units etc. Supply and installation of raw water pumps (Worthington/Mather Platt/Kirloskar make) with motors (1 working and 1 stand by) (WTP) ) i/cmanually operated travelling crane with girder for lifting the pumps for Phanjakhong Scheme at a distance of 500m from WTP to Ingourok river having (5.00m X 4.00m) area with 2 flights of 3m length.
Design, Drawing & Construction of pump house with RCC column, lintel,brick wall, ramp ,suitable trusses with CGI roofing, doors, windows, electrification with good finish having plinth area of 8.38 sqm with pump foundation for 2 nos of pumpsets complete .
Design, Drawing, Construction, Testing and Commissioning of R.C.C. Aerator Fountain of about 4.5m height above GL consisting of at least 4 to 6 cascades with space requirement of 0.70 m2 per MLD exposed faces line with china glazed colour tiles of approved pattern i/cfixing & providing inlet pipe of suitable pipes i/csmooth finishing of supporting columns and vertical walls, watering, curing, weatherproof painting two coats and giving water tightness test, etc. complete.
Design, Drawing , Construction ,Testing and Commisssioningof R.C.C Settling tank (0.14 ML) capacity with necessary pipe fittings for raw inlet, outlet and sludge washout system, etc. complete.
Design, Drawing , Construction ,Testing and Commisssioningof R.C.C Slow Sand Filter with suitable underdrainage system and collection chamber for clear water along with pipe fittings and washout system with necessary inspection chamber including necessary internal fitting and suitable filter media etc. complete.
Design, Drawing , Construction ,Testing and Commisssioningof RCC clear water Service Reservoir (0.36 ML) with slab roofing, necessary pipe fitting, manhole with cover, air vent & fitted with disinfection dosing unit etc. complete.
Design, Drawing, Construction of Chowkidar Quarter cum Godown with RCC column of suitable foundation,brickwall, lintel, ramp, suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area 32.00 sqm area.
Design, Drawing, Construction of RCC Sanitary Toilet having 4.32 sqm area including necessary all Civil, Mechanical, Electrical works etc. all complete at Phanjakhong
Design, Drawing &Construction of Approach road of length 500m i/c concrete side drain of length 400m with retaining wall of height 4.50m & length 19.70m at Phanjakhong.
Design, Drawing and construction of Brick wall fencing of length 250.00m and height 2.30m with RCC Column of suitable foundation with 2 shutter of length 1.60m and height 2.80m each complete with accessories, fitting etc. complete –250.00 m.
Design, Drawing,Enerzisation, Procurement and Installation of suitable transformer i/c erection & stringing of necessary HT & LT line for power supply having capacity enough to operate the pumping machineries for the scheme/intake, including internal and external lighting, testing etc. all complete.
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge and laying of DI fittings (specials)/CI fittings (specials)mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitablechambers for Air Valve,Anchorblock,Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete a) DI 200mm dia = 1000.00 m b) DI 150mm dia = 1600.00 m c) DI 100mm dia = 2400.00 m Total = 5000.00 m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector,socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete (a) GI 80mm dia = 2000.00 m (b) GI 65mm dia = 2000.00 m Total= 4000.00 m
Providing & laying of DI Raw Water Pipes (K-7 class) conforming to IS 12288:2002 specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of DI fittings(specials)/CI fittings (specials) and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and chambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings etc. and disinfection of all pipes, trial run and commissioning etc. complete.From Intake -to Phanjakhong WTP 100mm dia. - 100.00 m
Augmentation of water treatment plant at Ingourok (0.18MLD). The source of raw water is Ingourok River which is at a distance of 500.00 m from the treatment plant including site levelling/land development ( i/cdemolition of old structure if any)m ; approach road etc. complete and the following items as below :
Design, Drawing, construction, Testing and Commissioning of RCC Step type Intake with suitable pile foundation, having 2 nos. of landing of size (2 x 2)m, 2 nos. of flight of 3m with necessarymechanical & electrical works including connecting walkway cum pipe carrying girder from Intake to river bund and construction of pump house with RCC column, lintel,brick wall , ramp,suitable trusses with CGI roofing, doors, windows, electrification with good fnish having a plinth area of ( )with pump foundation for 2 nos of pumpset complete. Supply and Installation of electrical pumpset with necessary component, fitting & Electrical work complete for raw water pumps (Worthington/Mather Platt/Kirloskar make) with motors (2 working and 1 stand by) ) i/cmanually operated travelling crane with girder for lifting the pumps for Ingourok (WTP) at Ingourok River.
Design, Drawing, Construction, Testing and Commissioning of R.C.C. Aerator Fountainof about 4.50m height above GL consisting of at least 4 to 6 cascades with space requirement of 0.70 m2 per MLD exposed faces line with china glazed colour tiles of approved pattern i/cfixing & providing inlet pipe of suitable pipes i/csmooth finishing of supporting columns and vertical walls, watering, curing, weatherproof painting two coats and giving water tightness test, etc. complete.
Design, Drawing , Construction ,Testing and Commisssioningof R.C.C Settling tank (0.14 ML) capacity with necessary pipe fittings for raw water inlet, outlet and sludge washout system, etc. complete.
Design, Drawing , Construction ,Testing and Commisssioningof R.C.C Slow Sand Filter with suitable underdrainage system and collection chamber for clear water along with pipe fittings and washout system with necessary inspection chamber including necessary internal fitting and suitable filter media etc. complete.
Design, Drawing , Construction ,Testing and Commisssioningof RCC clear waterService Reservoir (0.18 ML) with slab roofing, necessary pipe fitting, manhole with cover, air vent & fitted with disinfection dosing unit etc. complete.
Design, Drawing, Construction, Testing and Trial run of Overhead Tank-15.00 meter staging height of 0.25 ML capacity including suitable pile foundation with ancillary units etc. complete including RCC Clear Water Pumping Station andpump house with RCC column, lintel, brick wall,ramp suitable trusses with CGI roofing, doors, windows, electrification with good finish having a plinth area of 8.38 sqm with pump foundation for 2 nos of pumpset complete. Supply & installation of Pump sets (Worthington/Mather Platt/ Kirloskar make) capable of filling 0.25 ML in one and half hours with motors (one working & one standby)) i/cmanually operated travelling crane with girder for lifting the pumps with ancillary units, complete at Ingourok.
Supply and installation of electrical pumpsets with necessary component, fitting and electrical works, etc. complete a) 20HP=2Nos. for distribution.
Design, Drawing and construction of Brick wall fencing length 150.00m and height 2.30m with RCC Column of suitable foundation with steel gate of 2 shutter of length 1.60m and height 2.80m each complete with accessories , fitting etc. complete –150.00 m.
Design, Drawing ,Enerzisation, Procurement and Installation of suitable transformer i/cerection & stringing of necessary HT & LT line for power supply having capacity enough to operate the pumping machineries for the scheme/intake, including internal and external lighting, testing etc. all complete
Providing & laying of DI Distribution Pipes (K-7 class) conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge and laying of DI fittings (specials)/CI fittings (specials)mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and Suitablechambers for Air Valve,Anchorblock,Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning, etc. complete a) DI 200mm dia =500.00 m b) DI 150mm dia = 1000.00 m c) DI 100mm dia = 1300.00 m Total = 2800.00 m
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector,socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete a) GI 80mm dia = 2000.00 m b) GI 65mm dia = 2000.00 m Total = 4000.00 m
Operation and maintenance of the above Schemes for a period of 5years after commission of the project on turn key basis.
Senapati PHE Division :
Construction of Water Supply Scheme at Bendramei Village (0.129 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 88 km from Senapati H.Q. towards North West through Peren road and the source of raw water from Daipui stream.
Design, Drawing, Construction, Testing and Commissioning of RCC Distribution tank of 8280 lits capacity each - 8nos. with CGI sheet roofing, platform and necessary pipe/specials fitting etc. complete, trace path cutting (1485.00 cum) for laying of pipeline from source to treatment unit.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985, socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete: GI (Dist) 25 mm dia. = 2500.00 m GI (Dist) 32 mm dia. = 2145.00 m Total = 4645.00 m
Construction of Water Supply Scheme at Chakha Village (0.134 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 120 km from Senapati H.Q. towards North Each through Peren road and the source of raw water from Taryii stream.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (8.00x2.30x2.30)m at Talum stream including collection chamber of (4.55x1.20x1.80)m and drainage of 3.00 m, RCC settling tank of 32.40 KL capacity, RCC Service Reservoir of Capacity of 45 KL, Distribution tank of 8280 lits capacity each - 8nos., trace path cutting for laying of pipeline from source to treatment unit -585.00 cum and fencing with barbed weir and angle iron posts for a length of 160M with compound gate with fitting complete, i/c necessary inlet, outlet chamber, site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI DistributionPipes confoming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket confoming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :GI (Dist) 25 mm dia. = 2000.00 m GI (Dist) 32 mm dia. = 2265.96.00 m Total = 4265.96.00 m
Construction of Water Supply Scheme at Chakumai Village(0.305 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 45 km from Senapati H.Q. towards North Each through Tadubi Bazar road.
Design, Drawing, Construction, Testing and Commissioning of RCC Distribution Tank of 8280 lits capacity each – 10 nos. and of trace path cutting for pipeline from source to treatment unit -841.50 cum, i/c necessary inlet, outlet chamber, site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985, socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 3500.00 m GI (Dist) 32 mm dia. = 2000.00 m Total = 5500.00m
Construction of Water Supply Scheme at Chowainu Village (0.393MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 56 km from Senapati H.Q. towards North Each through Tadubi Bazar road and the source of raw water from Rikhurii stream.
Construction of trace path cutting for pipeline from source to treatment unit -1552.50 cum.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 3100.00 m GI (Dist) 32 mm dia. = 3779.24.00 m Total = 6879.24.00 m
Construction of Water Supply Scheme at Chowainamai Makhan Village (1.24 MLD )m ; Mao Maram Block of Senapati District, Manipur which is about 43 km from Senapati H.Q. towards North Western side of Maram Bazar. The source of raw water from Tukorii and Masidziila stream.
Design, Drawing, Construction, Testing and Commissioning of RCC Distribution Tank of 8280 lits capacity each – 16 nos. and trace path cutting for pipeline from source to treatment unit at ChowainameiMakhan -2340.00 cum
Providing & Providing & laying of GI Main and Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Main) 25 mm dia. = 4220.00 m GI (Main) 32 mm dia. = 2580.00 m GI (Dist) 40 mm dia. = 2300.00 m GI (Dist) 50 mm dia. = 2100.00 m Total =11200.00 m
Construction of Water Supply Scheme at EmefiihuVillage (0.110 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 50 km from Senapati H.Q. towards North Western side of Maram Bazar. The source of raw water from Rito Stream.
Design, Drawing, Construction, Testing and Commissioning of RCC Distribution Tank of 8280 lits capacity each – 7 nos. and trace path cutting for pipeline from source to treatment unit -3195.00 cum
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete GI (Dist) 25 mm dia. = 2000.00 m GI (Dist) 32 mm dia. = 3000.00 m Total = 5000.00 m
Construction of Water Supply Scheme at Kamalung Village (0.121 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 65 km from Senapati H.Q. towards North Western side of Peren road. The source of raw water from Kariijii Stream.
Design, Drawing, Construction, Testing and Commissioning of RCC Distribution Tank of 8280 lits capacity each – 8nos. and trace path cutting for pipeline from source to treatment unit -1350.00 cum
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 2000.00 m GI (Dist) 32 mm dia. = 1281.64.00 m Total = 3281.64.00 m
Construction of Water Supply Scheme at Kanem Village (0.117 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 50 km from Senapati H.Q. towards North Western side of Peren road. The source of raw water will be Buiroi Stream which is about 4.50 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of RCC Distribution Tank of 8280 lits capacity each – 7nos. and trace path cutting for pipeline from source to treatment unit -1800.00 cum
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 2000.00 m GI (Dist) 32 mm dia. = 1149.12.00 m Total = 3149.12.00 m
Construction of Water Supply Scheme at Maram Kavanam Village (0.160 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 25 km from Senapati H.Q. towards North Western side of Peren road. The source of raw water from Khunglamrai stream.
Design, Drawing, Construction, Testing and Commissioning of RCC Zonal Reservoir of Capacity of 28.00 KL, Distribution tank of 8280 lits capacity each – 10 nos. and trace path cutting for pipeline from source to treatment unit -1620.00 cum
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasper IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 2350.00 m GI (Dist) 32 mm dia. = 2535.00 m Total = 4885.00 m
Construction of Water Supply Scheme at Kayinu Village (0.506 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 30 km from Senapati H.Q. towards Each side of Mao Gate. The source of raw water from Rikhurii stream.
Design, Drawing, Construction, Testing and Commissioning of RCC Zonal Reservoir of Capacity of 180 KL, Distribution tank of 8280 lits capacity each – 15 nos. and trace path cutting for pipeline from source to treatment unit -2059.56 cum.
Providing & laying of GI Main and Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 1790.00 m GI (Dist) 32 mm dia. = 1370.00 m GI (Main) 40 mm dia. = 870.00m GI (Main) 50 mm dia. = 1120.00 m Total = 5150.00 m
Construction of Water Supply Scheme at KeneluVillage (0.116 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 65 km from Senapati H.Q. towards North West side of Peren Road. The source of raw water from Nrangrod stream.
Design, Drawing, Construction, Testing and Commissioning of RCC Zonal Reservoir of Capacity of 16.20 KL, Distribution tank of 8280 lits capacity each – 6 nos. and trace path cutting for pipeline from source to treatment unit -945.00 cum.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 2500.00 m GI (Dist) 32 mm dia. = 1232.33.00 m Total = 3732.33.00 m
Construction of Water Supply Scheme at KhridziiphemaiVillage (0.169 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 50 km from Senapati H.Q. towards North East side of Mao Gate. The source of raw water from Likhurii stream.
Design, Drawing, Construction, Testing and Commissioning of RCC Distribution Tank of 8280 lits capacity each – 10 nos. and trace path cutting for pipeline from source to treatment unit -2772.00 cum.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 2890.00 m GI (Dist) 32 mm dia. = 2000.49.00 m Total = 4890.49.00 m
Construction of Water Supply Scheme at LovadziinghoVillage (0.119 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 43 km from Senapati H.Q. towards North East side of Mao Gate. The source of raw water from Toppei Rito stream.
Design, Drawing, Construction, Testing and Commissioning of RCC Distribution tank of 8280 lits capacity each – 7 nos. and trace path cutting for pipeline from source to treatment unit -1710.00cum.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 1920.00 m GI (Dist) 32 mm dia. = 2352.77.00 m Total = 4272.77.00 m
Construction of Water Supply Scheme at Makhan CentreVillage (0.363 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 45 km from Senapati H.Q. towards North East side of Mao Gate. The source of raw water from Tukorii and Masidziila stream.
Design, Drawing, Construction, Testing and Commissioning of RCC Distribution tank of 8280 lits capacity each – 10 nos. and trace path cutting for pipeline from source to treatment unit -765.00 cum.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 2025.00 m GI (Dist) 32 mm dia. = 2361.55.00 m Total = 4386.55.00 m
Construction of Water Supply Scheme at MakhanKhullenVillage (0.341 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 48 km from Senapati H.Q. towards North East side of Mao Gate. The source of raw water from Tukorii and Masidziila stream.
Design, Drawing, Construction, Testing and Commissioning of RCC Distribution tank of 8280 lits capacity each – 14 nos. and trace path cutting for pipeline from source to treatment unit -900.00 cum.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 1011.02.00 m GI (Dist) 32 mm dia. = 5307.14.00 m Total = 6318.16.00 m
Construction of Water Supply Scheme at Makhan Khuman Village (0.201 ML)m ; Mao Maram Block of Senapati District, Manipur which is about 24 km from Senapati H.Q. towards North East side of Mao Gate. The source of raw water from Tukorii stream.
Design, Drawing, Construction, Testing and Commissioning of RCC Distribution tank of 8280 lits capacity each – 12 nos. and trace path cutting for pipeline from source to treatment unit -1530.00 cum
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 1856.10.00 m GI (Dist) 32 mm dia. = 2340.01.00 m Total = 4196.11.00 m
Construction of Water Supply Scheme at Mao Pungdong Village (0.578 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 29 km from Senapati H.Q. towards East side of Mao Gate. The source of raw water from Rito stream.
Design, drawing and construction of RCC Distribution tank of 8280 lits capacity each – 13 nos. and trace path cutting for pipeline from source to treatment unit -1955.71 cum.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 2100.00 m GI (Dist) 32 mm dia. = 2580.00 m Total = 4680.00 m
Construction of Water Supply Scheme at Maram Bazar Village (0.376 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 22 km from Senapati H.Q. towards East side of Mao Gate. The source of raw water from Makyikarii stream.
Design, Drawing, Construction, Testing and Commissioning of RCC Distribution tank of 8280 lits capacity each – 4 nos. and trace path cutting for pipeline from source to treatment unit -180.00 cum
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 2618.00 m GI (Dist) 32 mm dia. = 1637.69 m Total = 4255.69 m
Construction of Water Supply Scheme at Maram Center Village (0.160 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 22 km from Senapati H.Q. towards East side of Mao Gate. The source of raw water from Khunglamrai stream.
Design, Drawing, Construction, Testing and Commissioning of RCC Distribution tank of 6498 lits capacity each – 9 nos. and of trace path cutting for pipeline from source to treatment unit-382.50 cum.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code.Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 2500.00 m GI (Dist) 32 mm dia. = 4215.00 m Total = 6715.00 m
Construction of Water Supply Scheme at Maram Khullakpa Sagai Village (0.160 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 24 km from Senapati H.Q. towards North West side of Peren Road. The source of raw water from Rajong stream.
Design, Drawing, Construction, Testing and Commissioning of RCC Zonal Reservoir of Capacity of 19.80 KL, RCC Distribution tank of 8280 lits capacity each – 8 nos. and of trace path cutting for pipeline from source to treatment unit -1350.00 cum.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 1500.00 m GI (Dist) 32 mm dia. = 5500.00 m GI (Main) 40 mm dia. = 2000.00 m Total = 9000.00 m
Construction of Water Supply Scheme at Maram Makha Sagai Village (0.98 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 27 km from Senapati H.Q. towards North side of Peren Road. The source of raw water from Rain Water Harvesting at Catholic & Baptist Church.
Design, Drawing, Construction, Testing and Commissioning of RCC Zonal Reservoir of Capacity of 512.00 KL with slab roofing, necessary pipe fitting, and.00 manhole with cover, air vent& fitted with disinfection dosing unit etc. complete – 2 nos., RCC Distribution tank of 8280 lits capacity each – 6 nos. and trace path cutting for pipeline from source to treatment unit-450.00 cum.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 1000.00 m GI (Dist) 32 mm dia. = 3000.00 m GI (Main) 40 mm dia. = 1000.00 m Total = 5000.00 m
Construction of Water Supply Scheme at Maram Mathak Sagai Village (0.526 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 27 km from Senapati H.Q. towards North side of Peren Road. The source of raw water from Rain Water Harvesting at Catholic & Baptist Church.
Design, Drawing and Construction of RCC Sevice Reservoir of Capacity of 512.00 KL, RCC Distribution tank of 8280 lits capacity each – 2 nos. and trace path cutting for pipeline from source to treatment unit -765.00 cum.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 1850.00 m GI (Dist) 32 mm dia. = 1192.95.00 m Total = 3042.95.00 m
Construction of Water Supply Scheme at New Magaimai Village (0.089 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 28 km from Senapati H.Q. towards North side of MaramPeren Road. The source of raw water from Khongnam stream.
Design, Drawing, Construction, Testing and Commissioning of RCC Distribution tank of 8280 lits capacity each – 7 nos. and trace path cutting for pipeline from source to treatment unit at -1350.00cum.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 2500.00 m GI (Dist) 32 mm dia. = 2632.68.00 m Total = 5132.68.00 m
Construction of Water Supply Scheme at New Makhan Village (0.134 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 43 km from Senapati H.Q. towards North Western side of Maram Bazar. The source of raw water from Tukorii & Masidziila stream.
Design, Drawing, Construction, Testing and Commissioning of RCC Zonal Reservoir of Capacity of 45.00 KL, RCC Distribution tank of 8280 lits capacity each – 8 nos. and trace path cutting for pipeline from source to treatment unit-472.50 cum.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 2370.00 m GI (Dist) 32 mm dia. = 5160.00 m Total = 7530.00 m
Construction of Water Supply Scheme at New Maram Village (0.91 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 20 km from Senapati H.Q. towards North side of MaramPeren Road. The source of raw water from Khunglamrai stream.
Design, Drawing, Construction, Testing and Commissioning of RCC Distribution tank of 8280 lits capacity each – 4 nos. and trace path cutting for pipeline from source to treatment unit -540.00 cum.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 2500.00 m GI (Dist) 32 mm dia. = 8000.00 m Total = 10500.00 m
Construction of Water Supply Scheme at Ngari Khullen Village (0.326 MLD)m ; Purul Block of Senapati District, Manipur which is about 120 km from Senapati H.Q. and 20 Km away from Sub-District HQ Purul.
Design, Drawing, Construction, Testing and Commissioning of 2 units R.C.C Slow Sand Filter of 35.04 sqmand Distribution tank of 8280 lits capacity each – 9 nos.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 2711.82.00 m GI (Dist) 32 mm dia. = 2500.00 m GI (Dist) 40 mm dia. = 1000.00 m Total = 6211.82.00 m
Construction of Water Supply Scheme at Ngari Lishang Village (0.266 MLD)m ; Purul Block of Senapati District, Manipur which is about 121 km from Senapati H.Q. and 21 Km away from Sub-District HQ Purul.
Design, Drawing and Construction of2 units R.C.C Slow Sand Filter of 29.04 sqm each at NgariLishang and Distribution tank of 8280 lits capacity each – 12 nos.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 1200.00 m GI (Dist) 32 mm dia. = 4718.79.00 m Total = 5918.79.00 m
Construction of Water Supply Scheme at Ngari Raidulomai Village (0.171 MLD)m ; Purul Block of Senapati District, Manipur which is about 115 km from Senapati H.Q. and 16 Km away from Sub-District HQ Purul.
Design, Drawing, Construction, Testing and Commissioning of RCC Zonal Reservoir of Capacity of 30.42 KL, construction of 2 units R.C.C Slow Sand Filter of 48.72 sqm and Distribution tank of 8280 lits capacity each – 8 nos.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 6500.00 m GI (Dist) 32 mm dia. = 5255.88.00 m Total = 11755.88.00 m
Construction of Water Supply Scheme at NsebekieVillage (0.052 MLD)m ; Mao Maram Block of Senapati District, Manipur is situated along Maram-Peren road in Willong Sub Division of Mao-Maram block, Senapati District. The source of raw water is Takjalo stream which is about 6.00 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of RCC Settling Tank of 17.82 KL, RCC Distribution tank of 8280 lits capacity each – 7 nos. and trace path cutting for pipeline from source to treatment unit -1440.00 cum.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 1000.00 m GI (Dist) 32 mm dia. = 3304.09.00 m Total = 4304.09.00 m
Construction of Water Supply Scheme at Zenamci Village (0.0641 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 79 km from Senapati H.Q. towards North West through MarmaPeren road. The source of raw water from Nuire stream.
Design, Drawing, Construction and Commissioning of Intake Arrangement at source of Intake Weir (8.00x2.30x2.30)m at Rui stream including collection chamber of (4.55x1.20x1.80)m and drainage of 3.00 m with fittings complete,RCC Settling Tank of 10.70 KL, RCC Service Reservoir of Capacity of 32.10 KL, RCC Distribution tank of 8280 lits capacity each – 4 nos. and trace path cutting for pipeline from source to treatment unit -675.00 cum.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 1500.00 m GI (Dist) 32 mm dia. = 3800.00 m Total = 5300.00 m
Construction of Water Supply Scheme at Pudunamei Village (0.661 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 42 km from Senapati H.Q. towards Mao Gate. The source of raw water from Rikhurii stream.
Design, Drawing, Construction and Commissioning of RCC Distribution tank of 8280 lits capacity each – 12 nos. and trace path cutting for pipeline from source to treatment unit -1350.00 cum.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 4100.00 m GI (Dist) 32 mm dia. = 2580.00 m Total = 6658.00 m
Construction of Water Supply Scheme at Punanamei Village (0.992 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 40 km from Senapati H.Q. towards Mao Gate. The source of raw water from Rikhurii stream.
Design, Drawing, Construction and Commissioning of RCC Distribution tank of 8280 lits capacity each – 12 nos. and trace path cutting for pipeline from source to treatment unit -990.00 cum.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 25 mm dia. = 2600.00 m GI (Dist) 25 32 mm dia. = 2460.00 m GI (Dist) 25 40 mm dia. = 2500.00 m GI (Dist) 25 50 mm dia. = 2100.00 m Total = 9660.00 m
Construction of Water Supply Scheme at Pungdunglong Village (0.106 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 79 km from Senapati H.Q. towards North Western side of Maram-Peren road. The source of water will be Menggarii stream which is about 3.00 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of RCC Zonal Reservoir of Capacity of 35.28 KL, RCC Distribution tank of 8280 lits capacity each – 4 nos. and of trace path cutting for pipeline from source to treatment unit -1035.00 cum.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 2158.12.00 m GI (Dist) 32 mm dia. = 1500.00 m Total = 3658.12.00 m
Construction of Water Supply Scheme at Kangjang village (0.050 MLD). It is inhibited by Rongmei tribe which is in WillongSubDivision of Mao-Maram Block, Senapati District. The source of water will be Maoryii stream which is about 3.00 km from the treatment site.
Design, Drawing and Construction ofIntake Arrangement at source of Intake Weir (7.00x2.00x1.50)m at Maoryii stream including collection chamber of (3.25x1.50x1.20)m and drainage of 3.00 m with fittings complete, ofRCC Settling Tank of Capacity of 16.80 KL, RCC Service Reservoir of Capacity of 25.20 KL, Distribution tank of 8280 lits capacity each – 1 nos. and trace path cutting for pipeline from source to treatment unit at Kangjang -675.00 cum.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 500.00 m GI (Dist) 32 mm dia. = 3000.00 m Total = 3500.00 m
Construction of Water Supply Scheme at Maram Sagombam Village (0.132 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 21 km from Senapati H.Q. towards North Western side of Maram-Peren road. The source of water from Khunglamrai stream.
Design, Drawing, Construction, Testing and Commissioning of RCC Distribution tank of 8280 lits capacity each – 8 nos. and trace path cutting for pipeline from source to treatment unit -720.00 cum.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 2000.00 m GI (Dist) 32 mm dia. = 2642.32.00 m Total = 4642.32.00 m
Construction of Water Supply Scheme at Sangkhunglung Village (0.119 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 32 km from Senapati H.Q. towards North West through MarmaPeren road. The source of raw water from Ngajarrijii stream.
Design, Drawing, Construction, Testing and Commissioning of Intake Weir (8.00x2.30x2.30)m at Jingrii stream including collection chamber of (4.55x1.20x1.80)m and drainage of 3.00 m with fitting complete, RCC Settling Tank of Capacity of 32.40 KL, RCC Service Reservoir of Capacity of 45 KL, R.C.C Slow Sand Filter of 5.45 sqm, RCCDistribution tank of 8280 lits capacity each – 10 nos. and trace path cutting for pipeline from source to treatment unit -855.00 cum
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 1500.00 m GI (Dist) 32 mm dia. = 2223.54.00 m GI (Dist) 40 mm dia. = 600.00 m Total = 4323.54.00 m
Construction of Water Supply Scheme at Tamphung Village (0.102 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 121 km from Senapati H.Q. towards North Western side of Maram-Peren road. The source of raw water from Duiri stream.
Design, Drawing, Construction, Testing and Commissioning of RCC Zonal Reservoir of Capacity of 31.75 KL, RCC Distribution tank of 8280 lits capacity each – 6 nos. and trace path cutting for pipeline from source to treatment unit -405.00 cum.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 6270.65.00 m GI (Dist) 32 mm dia. = 8000.00 m Total = 14270.65.00 m
Construction of Water Supply Scheme at Thuyeng Village (0.151 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 98 km from Senapati H.Q. towards North Western side of Maram-Peren. The source of raw water from Karii stream.
Design, Drawing, Construction, Testing and Commissioning of RCC Zonal Reservoir of Capacity of 45.00 KL, RCC Distribution tank of 8280 lits capacity each – 8 nos. and trace path cutting for pipeline from source to treatment unit at Thuyeng -495.00 cum.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 1698.00 m GI (Dist) 32 mm dia. = 2171.70.00 m Total = 3869.70.00 m
Construction of Water Supply Scheme at MaramRamlungvillage (0.105 MLD). It is inhibited by Maram tribe which is in Willong Sub-Division of Mao-Maram Block, Senapati District. The source of raw water will be Khunglamrai stream which is about 8.00 km from the treatment site.
Design, Drawing and Construction of Intake Weir (8.00x2.30x2.30)m at Khunglamrai stream including collection chamber of (4.55x1.20x1.80)m and drainage of 2.00 m with fittings complete, RCC Service Reservoir of Capacity of 52.64 KL, RCC Distribution tank of 8280 lits capacity each – 1 nos. and trace path cutting for pipeline from source to treatment unit -900.00 cum.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 1500.00 m GI (Dist) 32 mm dia. = 6000.00 m GI (Main) 40 mm dia. = 4000.00 m GI (Main) 50 mm dia. = 500.00 m Total = 12000.00 m
Construction of Water Supply Scheme at Willong Khunou Village (0.189 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 60 km from Senapati H.Q. towards North West through MarmaPeren road. The source of raw water from Ngaryii stream.
Design, Drawing, Construction, Testing and Commissioning of RCC Distribution tank of 8280 lits capacity each – 10 nos. and trace path cutting for pipeline from source to treatment unit -292.00 cum.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code.Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 5292.16.00 m GI (Dist) 32 mm dia. = 2171.70.00 m Total = 7463.86.00 m
Construction of Water Supply Scheme at Yangkhullen Village (0.648 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 84 km from Senapati H.Q. towards North West through MarmaPeren road. The source of raw water from Karii stream.
Design, Drawing and Construction of Intake Weir (8.00x2.30x2.30)m at Tanroi stream including collection chamber of (4.55x1.20x1.80)m and drainage of 3.00 m, RCC Settling Tank of capacity of 60.520 KL, RCC Distribution tank of 8280 lits capacity each – 10 nos., trace path cutting for pipeline from source to treatment unit -450.00 cum and construction ofcompound fencing with barbed weir and angle iron posts for a length of 160m with compound gate with fitting complete at Yangkhullen.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 2500.02.00 m GI (Dist) 32 mm dia. = 5292.16.00 m Total = 7792.18.00 m
Construction of Water Supply Scheme at Yangkhunou Village (0.171 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 80 km from Senapati H.Q. towards North West through MarmaPeren road. The source of raw water from Daipui stream.
Design, Drawing, Construction, Testing and Commissioning of RCC Distribution tank of 8280 lits capacity each – 6 nos. and trace path cutting for pipeline from source to treatment unit -585.00 cum
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 3000.00 m GI (Dist) 32 mm dia. = 3723.10.00 m Total = 6723.10.00 m
Construction of Water Supply Scheme at Zenamyi Village (0.064 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 79 km from Senapati H.Q. towards North West through Maram Bazar. The source of raw water is Ndauri stream which is about 4.00 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of RCC Distribution Tank of 8280 lits capacity each – 6 nos. and trace path cutting for pipeline from source to treatment unit -675.00 cum.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 3000.00 m GI (Dist) 32 mm dia. = 4223.10.00 m Total = 7223.10.00 m
Construction of Water Supply Scheme at Emeishiphro Village (0.095 MLD)m ; Mao Maram Block of Senapati District, Manipur which is situated in the south of Senapati District head quarter with a distance of 10 km. The source of water will be Kalijang Hill Stream which is about 3.00 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of 2 units R.C.C Slow Sand Filter of 16.00 sqm and RCC Distribution tank of 3600 lits capacity each – 3 nos.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 2100.00 m GI (Dist) 32 mm dia. = 1800.00 m GI (Main) 40 mm dia. = 2700.00 m Total = 6600.00 m
Construction of Water Supply Scheme at Kathikho Village (0.096 MLD)m ; Mao Maram Block of Senapati District, Manipur which is situated in the north of Senapati District head quarter with a distance of 18 km. The source of water will be Kashipriikow stream which is about 5.00 Km from the treatment site
Design, Drawing and Construction of Intake Weir (2.40x1.50x1.50)m at Kashiprii stream including collection chamber of 2.70x1.10x1.35.00 m and drainage of 3.00 m with fitting complete, RCC Service Reservoir of capacity of 96.31 KL, construction of2 units R.C.C Slow Sand Filter of 36.00 sqm each at Kathikho and RCCDistribution tank of 3600 lits capacity each – 3 nos.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 3300.00 m GI (Dist) 32 mm dia. = 3750.00 m Total = 7050.00 m
Construction of Water Supply Scheme at Katomei Village (0.278 MLD)m ; Mao Maram Block of Senapati District, Manipur which is situated in the west of Senapati District head quarter with a distance of about 15 km. The source of water will be HillaKarii stream which is about 5.00 Km from the treatment site.
Design, Drawing and Construction of Intake Weir (2.40x1.50x1.50)m at Karii stream including collection chamber of (2.70x1.10x1.35)m and drainage of 3.00 m with fitting complete, ofRCC Settling Tank of capacity of 278.12 KL, RCC Service Reservoir of capacity of 108.00 KL, construction of2 units R.C.C Slow Sand Filter of 36.00 sqm and RCC Distribution tank of 3600 lits capacity each – 1 no.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 3300.00 m GI (Dist) 32 mm dia. = 3750.00 m Total = 7050.00 m
Construction of Water Supply Scheme at Keibi Village (0.473 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 50 km from Senapati H.Q towards North East through Tadubi Bazar. The source of water is same to that of Tadubi which is about 6.00 Km from the proposed site.
Design, Drawing and Repairing of 2 units R.C.C Slow Sand Filter of 36.00 sqm and construction ofRCC Distribution tank of 3600 lits capacity each – 7 nos. with fitting complete.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 2280.00 m GI (Main) 40 mm dia. = 2310.00 m GI (Main) 50 mm dia. = 2220.00 m Total = 6810.00 m
Construction of Water Supply Scheme at Khabung Karong Village (0.463 MLD)m ; Mao Maram Block of Senapati District, Manipur which is situated in the North of Senapati District head quarter with a distance of 8 km. The source of water will be NgaileLurou Hill Streamwhich is about 3.00 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of 2 units R.C.C Slow Sand Filter of 64.00 sqm and RCC Distribution tank of 3600 lits capacity each – 2 nos.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 1500.00 m GI (Dist) 32 mm dia. = 1500.00 m GI (Main) 40 mm dia. = 1800.00 m Total = 4800.00 m
Construction of Water Supply Scheme at Khaikho Village (0.115 MLD)m ; Mao Maram Block of Senapati District, Manipur is situated in the Eastern side of Tadubiwith a distance of 15 km from Tadubi. The source of water will be Jiiho Kaw Hill stream which is about 2.00 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of 2 units R.C.C Slow Sand Filter of 25.00 sqm each at Khaikho and RCC Distribution tank of 3600 lits capacity each – 2 nos.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 1050.00 m GI (Dist) 32 mm dia. = 1200.00 m Total = 2250.00 m
Construction of Water Supply Scheme at Khongnem Village (0.086 MLD)m ; Mao Maram Block of Senapati District, Manipur is situated at a distance of 75 Km from Imphal and15 km from Senapati H/Q. The source of water will be Kashipri Hill stream which is about 2.00 Km from the treatment site.
Design, Drawing and Construction ofIntake Arrangement at source of Intake Weir (2.40x1.50x1.50)m at Karii stream including collection chamber of (2.70x1.10x1.35)m and drainage of 3.00 m with fitting complete, ofRCC Settling Tank of capacity of 86 KL, RCC Zonal Reservoir of capacity of 43.00 KL, construction of2 units R.C.C Slow Sand Filter of 30.50 sqm and RCC Distribution tank of 3600 lits capacity each – 1 nos.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 900.00 m GI (Main) 40 mm dia. = 2700.00 m Total = 3600.00 m
Construction of Water Supply Scheme at Lairouching Village (0.245 MLD)m ; Mao Maram Block of Senapati District, Manipur. It is situated along the NH-2, at a distance of 80 km from Imphal and 20 Km from Senapti H/Q. The source of water will be LashiDuikung Hill Stream which is about 5.00 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of RCC Settling Tankof capacity of 247 KL and RCC Distribution tank of 3600 lits capacity each – 2 nos.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 2400.00 m GI (Dist) 32 mm dia. = 2400.00 m GI (Main) 50 mm dia. = 1500.00 m Total = 6300.00 m
Construction of Water Supply Scheme at Katomei Makeng Chaijinba Village (0.021 MLD)m ; Mao Maram Block of Senapati District, Manipur. It is situated at a distance of 8 km from Senapti H/Q. The source of water will be HillaKarii Hill Stream which is about 3.00 Km from the treatment site
Design, Drawing, Construction, Testing and Commissioning of RCC Distribution tank of 3600 lits capacity each – 6 nos. platform and necessary fitting complete.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 1680.00 m GI (Dist) 32 mm dia. = 2730.00 m Total = 4410.00 m
Construction of Water Supply Scheme at Makhel Village (0.377 MLD)m ; Mao Maram Block of Senapati District, Manipur. It is situated eastward of NH-2, at a distance of 8 Km from Tadubi Bazaar. For this scheme treated water will be supplied from Tadubi NLCPR Project which about 5 km from the village.
Design, Drawing, Construction, Testing and Commissioning of RCC Distribution tank of 3600 lits capacity each – 10 nos. with platform and necessary fitting complete.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 1680.00 m GI (Dist) 32 mm dia. = 2730.00 m Total = 4410.00 m
Construction of Water Supply Scheme at Makhel Village (0.377 MLD)m ; Mao Maram Block of Senapati District, Manipur. It is situated eastward of NH-2, at a distance of 8 Km from Tadubi Bazaar. For this scheme treated water will be supplied from Tadubi NLCPR Project which about 5 km from the village.
Design, Drawing, Construction, Testing and Commissioning of RCC Distribution tank of 3600 lits capacity each – 10 nos. with CGI sheet roofing, platform and necessary fitting complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 1920.00 m GI (Dist) 32 mm dia. = 2730.00 m GI (Main) 40 mm dia. = 1920.00 m Total = 6570.00 m
Construction of Water Supply Scheme at Oklong village (0.121 MLD)m ; Mao Maram Block of Senapati District, Manipur. It is at a distance of 35 Km from Senapti H/Q.The source of water will be Ngarukii Hill stream which is about 8.00 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of 2 units R.C.C Slow Sand Filter of 32.00 sqm and RCC Distribution tank of 3600 lits capacity each – 2 nos.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 1500.00 m GI (Dist) 32 mm dia. = 1800.00 m Total = 3300.00 m
Construction of Water Supply Scheme of capacity at Mao Karong (Vakho) village (0.089 MLD)m ; Mao Maram Block of Senapati District, Manipur. It is situated along the NH-2, at a distance of 70 km from Imphal and 8 Km from Senapti H/Q.The source of water will be DishanKarii Hill stream which is about 4.00 Km and Kya Rao Hill Stream which is 3.00Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of Intake Weir (2.40x1.50x1.50)m at DishanKarii stream including collection chamber of (2.70x1.10x1.35)m and drainage of 3.00 m – 2 nos. With fitting complete, RCC Zonal Reservoir of capacity of 24.50 KL, construction of2 units R.C.C Slow Sand Filter of 56.25 sqm, construction of Valve Chamber a) 900 x 900 x 1000 mm - 10 nos.b) 1000 x 1000 x 1200 mm - 15 nos. and RCC Distribution tank of 3600 lits capacity each – 1 no.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 4500.00 m GI (Dist) 32 mm dia. = 4800.00 m GI (Main) 40 mm dia. = 6000.00 m Total = 15300.00 m
Construction of Water Supply Scheme at Namgailong Rongmei Village (0.048 MLD)m ; Mao- Maram Block of Senapati District, Manipur. It is situated along the NH-2, at a distance of 70 km from Imphal and 8 Km from Senapti H/Q. The source of water will be HillaKarii Hill Stream which is about 4.00 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of Intake Weir (2.40x1.50x1.50)m at Hila stream including collection chamber of (2.70x1.10x1.35)m and drainage of 3.00 m with fitting complete, RCC Settling Tank of capacity of 49 KL, construction of RCC Service Reservoir of capacity of 50.00 KL and construction of 2 units R.C.C Slow Sand Filter of 16.00 sqm.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code.Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 2100.00 m GI (Dist) 32 mm dia. = 3300.00 m Total = 5400.00 m
Construction of Water Supply Scheme at Puni Pfosemai Village (0.860 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 78 km from Imphal and 15 Km from Senapti H/Q. The source of water will be OpeidoRiito Hill stream about 3.5 km towards east from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of RCC Distribution tank of 3600 lits capacity each – 5 nos. with CGI sheet roofing, platform and necessary fitting complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 3000.00 m GI (Main) 40 mm dia. = 2130.00 m Total = 5130.00 m
Construction of Water Supply Scheme at Sadim Naga Village (0.206 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 75 km from Imphal and 15 Km from Senapti H/Q. The source of water will be Majodui stream about 2 km from the treatment site
Design, Drawing, Construction, Testing and Commissioning of RCC Service Reservoir of capacity of 75.00 KL with slab roofing, necessary pipe fitting, and.00 manhole with cover, air vent& fitted with disinfection dosing unit etc. complete at - 3 nos.
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete. GI (Dist) 32 mm dia. = 2400.00 m
Construction of Water Supply Scheme at Saranamei Village (0.458 MLD)m ; Paomata Block of Senapati District, Manipur which is about 60 km from Senapati H.Q towards North East through Tadubi Bazar. The source of water will be Makao Hill Stream which is about 6.00Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of Intake Weir (2.40x1.50x1.50)m at Makao stream including collection chamber of (2.70x1.10x1.35)m and drainage of 3.00 m with fitting complete, construction of2 units R.C.C Slow Sand Filter of 64.00 sqm and RCC Distribution tank of 3600 lits capacity each – 3 nos.
Laying of GI MainPipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code.Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Main) 50 mm dia. = 1800.00 m GI (Main) 65 mm dia. = 2100.00 m GI (Main) 100 mm dia. = 2400.00 m Total = 6300.00 m
Construction of Water Supply Scheme at Sajouba Village (0.860 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 45 km from Senapati H.Q towards North East through TadubiBazar. The source of water will be Tadubi NLCPR Project which is about 7.00 Km from the proposed site.
Design, Drawing, Construction, Testing and Commissioning of RCC Zonal Reservoir of capacity of 124.20 KL and RCC Distribution tank of 3600 lits capacity each – 2 nos.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 5100.00 m GI (Dist) 32 mm dia. = 5100.00 m GI (Main) 80 mm dia. = 3150.00 m Total = 13350.00 m
Construction of Water Supply Scheme at Tabumai Village (0.292 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 55 km from Senapati H.Q towards North East through Tadubi Bazaar. The source of water will be Tadubi NLCPR Project which is about6.00 Km from the proposed site.
Design, Drawing, Construction, Testing and Commissioning of RCC Zonal Reservoir of capacity of 90.00 KL and RCC Distribution tank of 3600 lits capacity each – 5 nos
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 3300.00 m GI (Dist) 32 mm dia. = 3000.00 m Total = 6300.00 m
Construction of Water Supply Scheme at Takamai Village (0.0156 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 60 km from Imphal towards North East and about 12 Km south of Senpati H/Q. The source of raw water is Chipaga Rog Hill Stream which is 5.00 Km from Treatment site
Design, Drawing, Construction, Testing and Commissioning of Intake Weir (2.40x1.50x1.50)m at Chipaga stream including collection chamber of (2.70x1.10x1.35)m and drainage of 3.00 m with fitting complete, RCC Settling Tank of capacity of 81.00 KL, construction of RCC Service Reservoir of capacity of 18.75 KL, construction of 2 units R.C.C Slow Sand Filter of 8.00 sqm and RCC Distribution tank of 3600 lits capacity each – 3 nos.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 1110.00 m GI (Dist) 32 mm dia. = 2280.00 m GI (Main) 40 mm dia. = 2700.00 m Total = 6090.00 m
Construction of Water Supply Scheme of capacity is to be constructed at Oklong Khunou Village (0.0647 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 95 km from Imphal and 34 Km North from Senapti H/Q. The source of raw water is Ngarukii Hill Stream which is 9.00 Km from Treatment site
Design, Drawing, Construction, Testing and Commissioning of 2 units R.C.C Slow Sand Filter of 20.25 sqm each at OklongKhunou
Providing & laying of GI Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 900.00 m GI (Dist) 32 mm dia. = 1650.00 m Total = 2550.00 m
Construction of Water Supply Scheme at Taphou Naga Village (0.247 MLD)m ; Mao Maram Block of Senapati District, Manipur which isabout 70 km from Imphal and within the Senapti H/Q. The source of raw water is Mazaki Lok Hill Stream which is 3.00 Km from Treatment Site.
Design, Drawing, Construction, Testing and Commissioning of Intake Weir 2.40x1.50x1.50.00 m at Mazaki stream including collection chamber of 2.70x1.10x1.35.00 m and drainage of 3.00 m with fitting complete, RCC Zonal Reservoir of capacity of 122.50 KL and RCC Distribution tank of 3600 lits capacity each – 2 nos.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete.GI (Dist) 25 mm dia. = 2100.00 m GI (Dist) 32 mm dia. = 1800.00 m Total = 3900.00 m
Construction of Water Supply Scheme at Taphou Onamei Village (0.117 MLD)m ; Mao Maram Block of Senapati District, Manipur which is about 60 km from Imphal towards North East and about 7 Km south of Senpati H/Q. The source of water will be Kalijang Hill Stream which is about 5.00 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of 2 units R.C.C Slow Sand Filter of 36.00 sqm and RCC Distribution tank of 3600 lits capacity each – 3 nos.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (withlatest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25(dist.)mm dia. = 3120.00 m 32(dist.)mm dia. = 1920.00 m 40(main) mm dia. = 3660.00 m Total = 8700.00 m
Construction of Water Supply Scheme at Tungjoy Village (0.921 MLD)m ; Paomata Block of Senapati District, Manipur which is about 70 km north from Senapati H.Q. The source of water will be Larii Hill stream which is about 6.00 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of RCC Zonal Reservoir of capacity of 640.00 KL and RCC Distribution tank of 3600 lits capacity each – 5 nos.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25(dist.)mm dia. = 2400.00 m 32(dist.)mm dia. = 2700.00 m 40(main) mm dia. = 2130.00 m Total = 7230.00 m
Construction of Water Supply Scheme at Ikailongdi Village (0.077 MLD) ; Mao Maram Block of Senapati District, Manipur at a distance of 70 km from Imphal and within Senapti District H/Q. The source of scheme is ChipiKhorii Hill stream and situated at a distance of about 4.00 Km from Treatment site.
Design, Drawing, Construction, Testing and Commissioning of of Intake Weir (2.40x1.50x1.50)m at ChipiKorii stream including collection chamber of (2.70x1.10x1.35)m and drainage of 3.00 m with fitting complete, RCC Settling Tank of capacity of 284 KL, RCC Zonal Reservoir of capacity of 40.00 KL and RCC Distribution tank of 3600 lits capacity each – 3 nos.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete i) G. I. Pipes 25(dist.)mm dia. = 4440.00 m 32(dist.)mm dia. = 2400.00 m 50(main) mm dia. = 2100.00 m Total = 8940.00 m
Construction of Water Supply Scheme at Chingmei Khullen Village (0.220 MLD) ; Paomata Block of Senapati District, Manipur which is about 82 km north from Senapati H.Q. The source of water will be Yuchori stream which is about 3.50 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of RCC Zonal Reservoir of capacity of 79.00 KL, construction of 2 units R.C.C Slow Sand Filter of 30.25 sqm and RCC Distribution tank of 3600 lits capacity each – 2 nos.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :) G. I. Pipes 25(dist.)mm dia. = 2020.00 m 32(dist.)mm dia. = 1700.00 m 40(main) mm dia. = 1000.00 m Total = 4720.00 m
Construction of Water Supply Scheme at Chingmei Khunou Village (0.450 MLD) ; Paomata Block of Senapati District, Manipur which is about 80 km north from Senapati H.Q. The source of water will be Beiilou and Bourbziinialok which are about 2.00 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of RCC Zonal Reservoir of capacity of 90.00 KL, construction of 2 units R.C.C Slow Sand Filter of 30.25 sqm and RCC Distribution tank of 3600 lits capacity each – 2 nos.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25(dist.)mm dia. = 980.00 m 32(dist.)mm dia. = 1000.00 m 40(main) mm dia. = 1000.00 m Total = 2980.00 m
Construction of Water Supply Scheme at Katafiimei Village (0.118 MLD) ; Paomata Block of Senapati District, Manipur which is about 59 km north from Senapati H.Q. The source of water will be Kikhutolok which is about 2.00 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of 2 units R.C.C Slow Sand Filter of 16.00 sqm and RCC Distribution tank of 3600 lits capacity each – 2 nos.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25(dist.) mm dia. = 1300.00 m 32(dist.) mm dia. = 2200.00 m Total = 3500.00 m
Construction of Water Supply Scheme at NewLaii Village (0.061 MLD) ; Paomata Block of Senapati District, Manipur which is about 52 km north from Senapati H.Q. The source of water will be Karoulok which is about 5.00 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of 2 units R.C.C Slow Sand Filter of 9.00 sqm and RCC Distribution tank of 3600 lits capacity each – 2 nos.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code.Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25(dist.)mm dia. = 1950.00 m 32(dist.)mm dia. = 1800.00 m 40(main) mm dia. = 2400.00 m Total = 6150.00 m
Construction of Water Supply Scheme at Paomata Centre Village (0.159 MLD); Paomata Block of Senapati District, Manipur which is about 45 km north- east from Senapati H.Q. The source of water will be traditional pond which is about 4.00 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of 2 units R.C.C Slow Sand Filter of 25.00 sqm, construction of Pump House of an area of 3.20m x 3.20m - 2 Nos., installation of Pump set with a total head of 25.00m having a discharge of 1.84 lps at a distant of 0.50 km - 1 no., installation of Submersible Pump set with a total head of 25.00m having a discharge of 1.84 lps at a distant of 0.50 km, construction of traditional pond of 3300 litres capacity, Supply, Stringing 65 KV power line (0.50 km)m ; Installation, Testing, and Commissioning of 1x100 kVA Distribution Sub-station and supply, Erection and Stringing of LT Line using AB Cable (3x70+1x50) sq.mm for power supply - 1 no., and RCC Distribution tank of 3600 lits capacity each – 4 nos.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25(dist.)mm dia. = 1280.00 m 32(dist.)mm dia. = 2000.00 m 40(main) mm dia. = 2100.00 m Total = 5380.00 m
Construction of Water Supply Scheme at Phuba Thapham Village (0.112 MLD); Paomata Block of Senapati District, Manipur which is about 51 km north-east from Senapati H.Q. The source of water will be Duphao and Laona streams which are about 4.50 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of 2 units R.C.C Slow Sand Filter of 30.25 sqm and construction of RCC Distribution tank of 3600 lits capacity each – 4 nos.
Providing & laying of GI Transmission Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25(dist.)mm dia. = 1900.00 m 32(dist.)mm dia. = 2000.00 m 40(main) mm dia. = 2000.00 m Total = 5900.00 m
Construction of Water Supply Scheme at Tungam Afii Village (0.239 MLD); Paomata Block of Senapati District, Manipur which is about 40 km north from Senapati H.Q. The source of water will be Baokhurii which is about 3.50 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of of Intake Weir 2.40x1.50x1.50.00 m at Baokhurii stream including collection chamber of 2.70x1.10x1.35.00 m and drainage of 3.00 m with fitting complete, RCC Service Reservoir of capacity of 48.00 KL, construction of 2 units R.C.C Slow Sand Filter of 25.00 sqm and construction of RCC Distribution tank of 3600 lits capacity each – 4 nos.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25(dist.)mm dia. = 1200.00 m 32(dist.)mm dia. = 1800.00m 50(main) mm dia. = 1800.00 m Total = 4800.00 m
Construction of Water Supply Scheme at Tungam Khullen Village (0.691 MLD); Paomata Block of Senapati District, Manipur which is about 42 km north from Senapati H.Q. The source of water will be Azathro traditional pond which is about 5.00 Km from the T/site.
Design, drawing and construction of Pump House of an area of 3.20m x 3.20m - 4 Nos., installation of Pump set with a total head of 30.00m having a discharge of 8.00 lps at a distant of 1.00 km - 3 nos. complete, installation of Submersible Pump set with a total head of 30.00m having a discharge of 8.00 lps at a distant of 1.00 km - 1 no complete, construction of traditional pond of 3300 litres capacity each - 3 Nos. and and Stringing of 11 KV Line (1.00 km)m ; Supply, Installation, Testing, and Commissioning of 1x100 kVA Distribution Sub-station and supply, Erection and Stringing of LT Line using AB Cable (3x70+1x50) sq.mm for power supply - 1 no.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25(dist.) mm dia. = 2400.00 m 32(dist.)mm dia. = 1700.00 m 40(main) mm dia. = 2000.00 m Total = 6100.00 m
Construction of Water Supply Scheme at Makhufii Village (0.144 MLD); Paomata Block of Senapati District, Manipur which is about 45 km north- east from Senapati H.Q. The source of water will beAkii traditional pond which is about 1.50 Km from the treatment site.
Design, drawing and construction of Pump House of an area of 3.20m x 3.20m - 2 Nos. With fitting complete, installation of Pump set with a total head of 60.00m having a discharge of 1.67 lps at a distant of 1.50 km - 1 nos., installation of Submersible Pump set with a total head of 60.00m having a discharge of 1.67 at a distant of 1.50 km - 1 no complete, construction of of traditional pond of 3300 litres capacity each - 1 Nos., Stringing of 11 KV Line (1.50 km)m ; Supply, Installation, Testing, and Commissioning of 1x100 kVA Distribution Sub-station and supply, Erection and Stringing of LT Line using AB Cable (3x70+1x50) sq.mm for power supply and construction of RCC Distribution tank of 3600 lits capacity each – 4 nos
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25(dist.) mm dia. = 1240.00 m 32(dist.) mm dia. = 900.00 m Total = 2140.00 m
Construction of Water Supply Scheme at Thiwa Songdo Village (0.027 MLD); Purul Block of Senapati District, Manipur which is about 98 km east from Senapati H.Q. The source of water will be Khama lok which is about 2.00 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of RCC Zonal Reservoir of capacity of 10 KL, construction of2 units R.C.C Slow Sand Filter of 2.25 sqmand RCC Distribution tank of 3600 lits capacity each – 1 nos.
Providing & laying of GI Transmission Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25(dist.) mm dia. = 1500.00 m 32(dist.) mm dia. = 2000.00 m Total = 3500.00 m
Construction of Water Supply Scheme at Keize Village (0.112 MLD); Purul Block of Senapati District, Manipur which is about 30 km north-east from Senapati H.Q. The source of water will be Paokiibii and Palii which are about 4.00 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of 2 units R.C.C Slow Sand Filter of 6.25 sqm, and RCC Distribution tank of 3600 lits capacity each – 3 nos
Providing & laying of GI Transmission Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25(dist.) mm dia. = 1680.00 m 32(dist.) mm dia. = 2000.00 m 40(main) mm dia. = 1500.00 m Total = 5180.00 m
Construction of Water Supply Scheme at Kapao Village (0.098 MLD); Purul Block of Senapati District, Manipur which is about 31 km north- east from Senapati H.Q. The source of water will be Kizho and Vaharou which is about 3.00 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of 2 units R.C.C Slow Sand Filter of 4.00 sqm each at Kapao – 2 nos., construction of Pump House of an area of 3.20m x 3.20m - 1 No. With fitting complete, installation of Pump set with a total head of 25.00m having a discharge of 0.80 lps at a distant of 2.00 km - 1 nos., construction of traditional pond of 3300 litres capacity each - 1 Nos., and Stringing of 11 KV Line (2.00 km)m ; Supply, Installation, Testing, and Commissioning of 1x100 kVA Distribution Sub-station and supply, Erection and Stringing of LT Line using AB Cable (3x70+1x50) sq.mm for power supply and RCC Distribution tank of 3600 lits capacity each – 2 nos.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25(dist.) mm dia. = 2215.00 m 32(dist.) mm dia. = 2000.00 m Total = 4215.00 m
Construction of Water Supply Scheme at Koide MakhaVillage (0.694 MLD)m ; Purul Block of Senapati District, Manipur which is about 30 km north-east from Senapati H.Q. The source of water will beTeirou and Vaotaolok which is about 4.50 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of of Intake Weir 2.40x1.50x1.50.00 m at Teirou and Vaotao stream including collection chamber of 2.70x1.10x1.35.00 m and drainage of 3.00 m with fitting complete, RCC Zonal Reservoir of capacity of 144.00 KL, construction of 2 units R.C.C Slow Sand Filter of 72.50 sqm and RCC Distribution tank of 3600 lits capacity each – 6 nos.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25(dist.)mm dia. = 3250.00 m 40(main) mm dia. = 2500.00 m Total = 5750.00 m
Construction of Water Supply Scheme at Khongdei Shimphung Village (0.348 MLD); Purul Block of Senapati District, Manipur which is about 78 km east from Senapati H.Q. The source of water will bePharilok which is about 4.50 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of RCC Service Reservoir of capacity of 73.00 KL and RCC Distribution tank of 3600 lits capacity each – 13 nos.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25(dist.) mm dia. = 1427.00 m 32(dist.) mm dia. = 1800.00 m 40(main) mm dia. = 2700.00 m Total = 5927.00 m
Construction of Water Supply Scheme at Oinam Village (0.666 MLD); Purul Block of Senapati District, Manipur which is about 55 km north-east from Senapati H.Q. The source of water will be Raoraeand Vaozhiaphanglok which are about 4.00 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of of Intake Weir (3.00x1.50x2.40)m at Raorae and Vaozhia stream including collection chamber of (4.20x1.60x1.60)m and drainage of 4.00 m with fitting complete, construction of 2 units R.C.C Slow Sand Filter of 42.50 sqm and RCC Distribution tank of 7200 lits capacity each – 6 nos.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25(dist.) mm dia. = 1500.00 m 32(dist.) mm dia. = 900.00 m 65(main) mm dia. = 2750.00 m Total = 5150.00 m
Construction of Water Supply Scheme at Phaibung Lower Village (0.152 MLD); Purul Block of Senapati District, Manipur which is about 98 km north from Senapati H.Q. The source of water will be Makhukhelok which is about 4.00 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of 2 units R.C.C Slow Sand Filter of 16.00 sqm and RCC Distribution tank of 3200 lits capacity each – 5 nos
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25(dist.) mm dia. = 2400.00 m 32(dist.) mm dia. = 3200.00 m Total = 5600.00 m
Construction of Water Supply Scheme at Thingba Khullen Village (0.540 MLD); Purul Block of Senapati District, Manipur which is about 35 km east from Senapati H.Q. The source of water will be Zairoutou and Zairoulok which are about 3.00 Km from the T/site.
Design, Drawing, Construction, Testing and Commissioning of of Intake Weir (2.40x1.50x1.50)m at Zairoutou and Zairou stream including collection chamber of (2.70x1.10x1.35)m and drainage of 3.00 m with fitting complete, construction of2 units R.C.C Slow Sand Filter of 56.50 sqm and RCC Distribution tank of 3200 lits capacity each – 5 nos.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code.Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25(dist.)mm dia. = 1398.00 m 32(dist.)mm dia. = 1700.00 m 40(main) mm dia. = 1500.00 m Total = 4598.00 m
Construction of Water Supply Scheme at Tingsong Village (0.212 MLD) ; Mao Maram Block of Senapati District, Manipur which is about 21 km east from Senapati H.Q. The source of water will be Khainaiphung, Mashenkheng and Khanailok which are about 3.00 Km from the treatment site
Design, Drawing, Construction, Testing and Commissioning of 2 units R.C.C Slow Sand Filter of 9.00 sqm each at Tingsong – 3 nos.andRCC Distribution tank of 3200 lits capacity each – 3 nos
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25(dist.) mm dia. = 2050.00 m 32(dist.) mm dia. = 1300.00 m 40(main) mm dia. = 900.00 m Total = 4250.00 m
Construction of Water Supply Scheme at Khongdei Ngawar Village (0.081 MLD); Purul Block of Senapati District, Manipur which is about 24 km east from Senapati H.Q. The source of water will be Rodaokharilok which is about 2.00 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of of Intake Weir (2.40x1.50x1.50)m at Rodaokhari stream including collection chamber of (2.70x1.10x1.35)m and drainage of 3.00 m with fitting complete, construction of RCC Zonal Reservoir of capacity of 19.00 KL, construction of 2 units R.C.C Slow Sand Filter of 9.00 sqm and RCC Distribution tank of 3200 lits capacity each – 1 nos
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25(dist.) mm dia. = 1410.00 m 32(dist.) mm dia. = 2000.00 m Total = 3410.00 m
Construction of Water Supply Scheme at Thiwa Village (0.201 MLD)m ; Purul Block of Senapati District, Manipur which is about 28 km east from Senapati H.Q. The source of water will be Chakheilok which is about 4.00 Km from the treatment site
Design, Drawing, Construction, Testing and Commissioning of RCC Zonal Reservoir of capacity of 45.00 KL, construction of2 units R.C.C Slow Sand Filter of 25.00 sqm and RCC Distribution tank of 3200 lits capacity each – 4 nos.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25(dist.)mm dia. = 1600.00 m 32(dist.)mm dia. = 1500.00 m 40(main) mm dia. = 2100.00 m Total = 5200.00 m
Construction of Water Supply Scheme at Purul Rosofii Village (0.352 MLD); Purul Block of Senapati District, Manipur which is about 45 km north from Senapati H.Q. The source of water will be Reiroulok which is about 6.00 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of RCC Zonal Reservoir of capacity of 84.00 KL and RCC Distribution tank of 3200 lits capacity each – 7 nos.
Providing & laying of GI Transmission Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25(dist.) mm dia. = 2265.00 m 32(dist.) mm dia. = 2000.00 m 40(main) mm dia. = 3000.00 m Total = 7265.00 m
Construction of Water Supply Scheme at Reafii Village (0.0877 MLD); Purul Block of Senapati District, Manipur which is about 39 km east from Senapati H.Q. The source of water will be Zhaozhelok which is about 10.00 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of of Intake Weir (3.00x1.50x2.10)m at zhaozhe stream including collection chamber of (5.00x2.1x1.80)m and drainage of 4.00 m with fitting complete, RCC Service Reservoir of capacity of 63.00 KL, construction of 2 units R.C.C Slow Sand Filter of 12.25 sqm and RCC Distribution tank of 7200 lits capacity each – 2 nos.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25(dist.) mm dia. = 8000.00 m 32(dist.) mm dia. = 2800.00 m 40(main) mm dia. =500.00 m Total = 11300.00 m
Construction of Water Supply Scheme at Purul Atongba Village (0.776 MLD) ; Purul Block of Senapati District, Manipur which is about 27 km north from Senapati H.Q. The source of water will be Paoduroulok which is about 2.00 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of RCC Zonal Reservoir of capacity of 179.00 KL and RCC Distribution tank of 3200 lits capacity each – 3 nos
Laying of GI Main & DistibutionPipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25(dist.) mm dia. = 1441.00 m 40(dist.) mm dia. = 700.00 m 50(main) mm dia. = 1000.00 m Total = 3341.00 m
Construction of Water Supply Scheme at Lakhamei Village (0.742 MLD) ; Purul Block of Senapati District, Manipur which is about 61 km east from Senapati H.Q. The source of water will be Soulorei and Peirilok which are about 2.50 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of RCC Zonal Reservoir of capacity of 104.00 KL, construction of 2 units R.C.C Slow Sand Filter of 81.00 sqm and RCC Distribution tank of 3200 lits capacity each – 5 nos.
Providing & laying of GI Transmission Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25(dist.) mm dia. = 1250.00 m 32(dist.) mm dia. = 1000.00 m 50(main) mm dia. = 1500.00 m Total = 3750.00 m
Construction of Water Supply Scheme at Sorbung Village (0.149 MLD) ; Mao Maram Block of Senapati District, Manipur which is about 11 km east from Senapati H.Q. The source of water will be Lashilok which is about 4.00 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of 2 units R.C.C Slow Sand Filter of 16.00 sqmand RCC Distribution tank of 3200 lits capacity each – 7 nos.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25 mm dia. = 2000.00 m 32 mm dia. = 3200.00 m Total = 5200.00 m
Construction of Water Supply Scheme at Khabung Village (0.223 MLD) ; Mao Maram Block of Senapati District, Manipur which is about 9 km east from Senapati H.Q. The source of water will be Vadziikhao and Vakaolok which are about 2.00 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of RCC Zonal Reservoir of capacity of 28.80 KL, construction of2 units R.C.C Slow Sand Filter of 8.50 sqm and RCC Distribution tank of 3200 lits capacity each – 2 nos.
Providing & laying of GI Transmission Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code.Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25 mm dia. = 1480.00 m 32 mm dia. = 1800.00 m Total = 3280.00 m
Construction of Water Supply Scheme at Purul Akutpa Village (0.949 MLD) ; Purul Block of Senapati District, Manipur which is about 48 km north from Senapati H.Q. The source of water will be Thairou and Khulazailok which are about 2.50 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of RCC Zonal Reservoir of capacity of 150.00 KL and RCC Distribution tank of 3200 lits capacity each – 5 nos
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25 mm dia. = 1604.00 m 32 mm dia. = 870.00 m 50 mm dia. = 1000.00 m Total = 3474.00 m
Construction of Water Supply Scheme at Shirong Village (0.172 MLD); Purul Block of Senapati District, Manipur which is about 31 km north from Senapati H.Q. The source of water will be Tsiilo and Laireilok which are about 2.50 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of 2 units R.C.C Slow Sand Filter of 9.00 sqm. and construction of RCC Distribution tank of 3200 lits capacity each – 4 nos.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25 mm dia. = 1400.00 m 32 mm dia. = 2000.00 m Total = 3400.00 m
Construction of Water Supply Scheme at Khamsom Village (0.273MLD); Mao Maram Block of Senapati District, Manipur which is about 40 km east from Senapati H.Q. The source of water will be Naovairei and Chushatoureilok which are about 7.00 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of 2 units R.C.C Slow Sand Filter of 16.00 sqm andconstruction of RCC Distribution tank of 3200 lits capacity each – 5 nos.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code.Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25 mm dia. = 3800.00 m 32 mm dia. = 4300.00 m Total = 8100.00 m
Construction of Water Supply Scheme at Phaibung Khunou Village (0.190MLD); Purul Block of Senapati District, Manipur which is about 90 km east from Senapati H.Q. The source of water will be Khaviirou pond which is about 3.00 Km from the treatment site
Design, drawing and construction of traditional pond of 3300 litres capacity each - 1 No. and construction of RCC Pump House of an area 3.20m x 3.20m - 2 Nos., installation of Pump Set with a total head of 30.00 m having a discharge of 1.52 lps at a distant of 0.50 km- 2 Nos. With fitting complete and RCC Distribution tank of 3200 lits capacity each – 4 nos.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25 mm dia. = 1450.00 m 32 mm dia. = 3400.00 m Total = 4850.00 m
Construction of Water Supply Scheme at Ngatan Village (0.123MLD); Mao Maram Block of Senapati District, Manipur which is about 21 km from Senapati H.Q. The source of water will be Reihaophielok which is about 5.00 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of 2 units R.C.C Slow Sand Filter of 16.00 sqm and RCC Distribution tank of 3200 lits capacity each – 5 nos.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25 mm dia. = 2750.00 m 50 mm dia. = 3500.00 m Total = 6250.00 m
Construction of Water Supply Scheme at KodomKhaviiVillage (0.244MLD)m ; Purul Block of Senapati District, Manipur which is about 32 km from Senapati H.Q. The source of water will be Pazeroulok which is about 4.00 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of 2 units R.C.C Slow Sand Filter of 25.00 sqm and RCC Distribution tank of 3200 lits capacity each – 3 nos.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25 mm dia. = 2500.00 m 32 mm dia. = 3200.00 m Total = 5700.00 m
Construction of Water Supply Scheme at Phaibung Khullen Village (0.717MLD); Purul Block of Senapati District, Manipur which is about 41 km from Senapati H.Q. The source of water will be Khaviiroulok which is about 2.00 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of RCC Zonal Reservoir of capacity of 861.00 KL with slab roofing, necessary pipe fitting, and.00 manhole with cover, air vent& fitted with disinfection dosing unit etc. complete– 3 nos.,compound fencing with barbed weir and angle iron posts for a length of 400.00 m and 1.52 high with compound gate complete and RCC Distribution tank of 3200 lits capacity each – 5 nos.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code.Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25(dist.) mm dia. = 1754.00 m 32(dist.) mm dia. = 1300.00 m 50(main) mm dia. = 1200.00 m Total = 4254.00 m
Construction of Water Supply Scheme at Koide Mathak Village (0.694MLD) ; Purul Block of Senapati District, Manipur which is about 24 km from Senapati H.Q. The source of water will be Hebureilok which is about 8.50 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of of Intake Weir (2.40x1.50x1.50)m at Heburei stream including collection chamber of (2.70x1.10x1.35)m and drainage of 3.00 m with fitting complete and RCC Distribution tank of 3200 lits capacity each – 10 nos.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25(Dist) mm dia. = 3072.00 m 32(Dist) mm dia. = 3100.00 m 40(main) mm dia. = 3500.00 m Total = 9672.00 m
Construction of Water Supply Scheme at Ngamju Village (0.497MLD) ; Purul Block of Senapati District, Manipur which is about 23 km from Senapati H.Q. The source of water will be Paotheikhiiroulok which is about 7.00 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of 2 units R.C.C Slow Sand Filter of 56.25 sqm andRCC Distribution tank of 3200 lits capacity each – 5 nos.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25 (dist.) mm dia. = 2310.00 m 32(dist.) mm dia. = 2500.00 m 40(main) mm dia. = 3000.00 m Total = 7810.00 m
Construction of Water Supply Scheme at Kodom Khullen Village (0.326MLD) ; Purul Block of Senapati District, Manipur which is about 34 km from Senapati H.Q. The source of water will be Souloreilok which is about 3.00 Km from the treatment site.
Design, Drawing, Construction, Testing and Commissioning of of Intake Weir (2.40x1.50x1.50)m at Soulorei stream including collection chamber of (2.70x1.10x1.35)m and drainage of 3.00 m with fitting complete, construction of 2 units R.C.C Slow Sand Filter of 36.00 sqm and RCC Distribution tank of 3200 lits capacity each – 3 nos.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt.(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239 (Pt.-II/1992-fourth revision) with amendment no. 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :i) G. I. Pipes 25(dist.) mm dia. = 1500.00 m 32(dist.) mm dia. = 1050.00 m 40(main) mm dia. = 1300.00 m Total = 3850.00 m
Operation and maintenance of the above Schemes for a period of 5 years after commission of the project on turnkey basis.
Kangpokpi PHE Division :
Construction of Water Supply Scheme at T. Waichong (0.05 MLD). The source of raw water is LuikhuhVadung stream which is about 1.90 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tankof 12 KL capacity, RCC Distribution Tank of 2.7 KL(6 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at bothendsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of GI fittings (specials)/GI fittings(specials) and suitable GI valves as per relevant ISCode. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves etc. and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm =1764.00 m GI (Dist) 32mm =2883.00 m Total = 4647.00 m
Construction of Water Supply Scheme at Bongmoul (0.05 MLD). The source of raw water is Laikop stream which is about 1.90 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(3 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both endsasperIS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random lengthof 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipejoints,fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm =1890.00 m GI (Dist) 32mm =1952.00 m Total = 3842.00 m.
Construction of Water Supply Scheme at Daili (0.20 MLD). The source of raw water is Kalikhola stream which is about 2.5 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(5 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm =2000.00 m GI (Dist) 40mm =3700.00 m Total = 5700.00 m.
Construction of Water Supply Scheme at N. Gamhoi (0.03 MLD). The source of raw water is Koubru stream which is about 2.5 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm =1878.00 m GI (Dist) 32mm =776.00 m Total = 2654.00 m.
Construction of Water Supply Scheme at Washangphung (0.10 MLD). The source of raw water is Laikop stream which is about 2.5 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(6 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm =2000.00 m GI (Dist) 32mm =2207.00 m Total = 4207.00 m.
Construction of Water Supply Scheme at Tumnoupokpi (0.11 MLD). The source of raw water is Kalikhola stream which is about 2.5 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(4 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm =1800.00 m GI (Dist) 32mm =1545.00 m Total = 3345.00 m.
Construction of Water Supply Scheme at Liyai Kongpao(0.04 MLD). The source of raw water is Kali stream which is about 1.95 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(4 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm =1909.00 m GI (Dist) 32mm =1979.00 m Total = 3888.00 m.
Construction of Water Supply Scheme at Mayangkhang (0.15MLD). The source of raw water is Makuilok stream which is about 2.5 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm =1950.00 m GI (Dist) 32mm =1212.00 m Total = 3162m
Construction of Water Supply Scheme at Gelbung (0.03 MLD). The source of raw water is Sambu stream which is about 1.95 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(3 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm =2500.00 m GI (Dist) 32mm =1945.00 m Total = 4445m
Construction of Water Supply Scheme at Gopibung Nepali (0.14 MLD). The source of raw water is Masani stream which is about 2.5 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(4 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm =1900.00 m GI (Dist) 32mm =2108.00 m Total = 4008m
Construction of Water Supply Scheme at Kharkhola (0.04 MLD). The source of raw water is Kalikholsa stream which is about 2.4 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm =1726.00 m GI (Dist) 32mm= 1350.00 m Total = 3076m
Construction of Water Supply Scheme at Upper Kalapahar (0.26 MLD). The source of raw water is Mahadeva lok stream which is about 2.5 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(4 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm= 2298.00 m GI (Dist) 40mm =2400.00 m Total = 4698m
Construction of Water Supply Scheme at Leisang (0.12 MLD). The source of raw water is Leisang stream which is about 2.5 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(4 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm =2500.00 m GI (Dist) 32mm= 1662.00 m Total = 4162m
Construction of Water Supply Scheme at Jangnom (0.06 MLD). The source of raw water is Laikop stream which is about 2.5 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(4 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm =2500.00 m GI (Dist) 32mm =1945.00 m Total = 4445m.
Construction of Water Supply Scheme at Saikotjang (0.07 MLD). The source of raw water is Laikot stream which is about 2.5 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(4 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm =2000.00 m GI (Dist) 32mm =1582.00 m Total = 3582m.
Construction of Water Supply Scheme at Santolabari (0.09 MLD). The source of raw water is Amale stream which is about 2.5 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(4 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm= 2100.00 m GI (Dist) 32mm= 898.00 m Total = 2998m
Construction of Water Supply Scheme at Paodel Basti (0.18MLD). The source of raw water is 12.00 miles stream which is about 2.4 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(4 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm= 2450.00 m GI (Dist) 32mm =2035.00 m Total = 4485m.
Construction of Water Supply Scheme at Lamchok (0.05 MLD). The source of raw water is Dahal stream which is about 1.8 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm =1700.00 m GI (Dist) 32mm =1104.00 m Total = 2804.00 m.
Construction of Water Supply Scheme at Mahika (0.04 MLD). The source of raw water is Kharkhola stream which is about 1.8 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm =1760.00 m GI (Dist) 32mm =1000.00 m Total = 2760.00 m.
Construction of Water Supply Scheme at G.Gelbung (0.06 MLD). The source of raw water is Sipilok stream which is about 2.5 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm =1719.00 m GI (Dist) 32mm =674.00 m Total = 2393.00 m
Construction of Water Supply Scheme at Thanglong Motbung(0.03 MLD). The source of raw water is Koirenglok stream which is about 2.5 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(4 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm =2500.00 m GI (Dist) 32mm =1648.00 m Total = 4148.00 m.
Construction of Water Supply Scheme at Kangchup Chiru (0.07 MLD). The source of raw water is Sipilok stream which is about 1.8 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm =1400.00 m GI (Dist) 32mm = 905.00 m Total = 2305.00 m.
Construction of Water Supply Scheme at Tuikhang Aimol (0.02 MLD). The source of raw water is LuikuhVadung stream which is about 2 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 32mm =2999.00 m GI (Dist) 32mm = 2999.00 m Total = 5998.00 m.
Construction of Water Supply Scheme at Tingkai Khullen (0.06 MLD). The source of raw water is LuikuhVadung stream which is about 2 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(4 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm =2200.00 m GI (Dist) 32mm = 1545.00 m Total = 3745.00 m.
Construction of Water Supply Scheme at S.Saheijang (0.05 MLD). The source of raw water is Lokchaolok stream which is about 2.3 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(4 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm =2030.00 m GI (Dist) 32mm = 2189.00 m Total = 4219.00 m.
Construction of Water Supply Scheme at Laimaton Thangbuh (0.04 MLD). The source of raw water is Thongjaolok stream which is about 2.2 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm = 2030.00 m GI (Dist) 32mm = 1090.00 m Total = 3120.00 m.
Construction of Water Supply Scheme at Natop Boljang(0.02 MLD). The source of raw water is Natoklok stream which is about 2 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 32mm = 2990.00 m GI (Dist) 32mm = 2990.00 m Total = 5980.00 m.
Construction of Water Supply Scheme at Khoripok (0.04 MLD). The source of raw water is Sajilok stream which is about 2.49 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm =1680.00 m GI (Dist) 32mm = 836.00 m Total =2516.00 m.
Construction of Water Supply Scheme at Natokkuki (0.05 MLD). The source of raw water is Vepidunglok stream which is about 2.3 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(4 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm =2220.00 m GI (Dist) 32mm =1950.00 m Total =4170.00 m.
Construction of Water Supply Scheme at Pangsang (0.07 MLD). The source of raw water is Likhamlok stream which is about 2.2 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm= 1492.00 m GI (Dist) 32mm = 940.00 m Total =2432.00 m.
Construction of Water Supply Scheme at L. Pheijang (0.02 MLD). The source of raw water is Abulok stream which is about 1.8 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete GI (Main) 50mm = 1433.00 m GI (Dist) 32mm = 800.00 m Total =2233.00 m.
Construction of Water Supply Scheme at K. Joute (0.01 MLD). The source of raw water is Phaijang stream which is about 1.9 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 32mm = 3002.00 m GI (Dist) 32mm = 3002.00 m Total =6004.00 m.
Construction of Water Supply Scheme at Bethany (0.01 MLD). The source of raw water is Phaijang stream which is about 1.9 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 32mm = 2942.00 m GI (Dist) 32mm = 2942.00 m Total =5984.00 m
Construction of Water Supply Scheme at SadarJoute (0.04 MLD). The source of raw water is Vepidunglok stream which is about 2.2 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm =2000.00 m GI (Dist) 32mm = 992.00 m Total =2992.00 m.
Construction of Water Supply Scheme at Thangjang (Thomjang) (0.02 MLD). The source of raw water is Likhamlok stream which is about 2 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 32mm =2969.00 m GI (Dist) 32mm = 2969.00 m Total =5938.00 m.
Construction of Water Supply Scheme at W. Buning (0.02 MLD). The source of raw water is Kholpechanglok stream which is about 1.7 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 32mm =2982.00 m GI (Dist) 32mm = 2982.00 m Total =5964.00 m.
Construction of Water Supply Scheme at M. Songpi (0.02 MLD). The source of raw water is Sipilok stream which is about 2 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 32mm =2915.00 m GI (Dist) 32mm = 2915.00 m Total =5830.00 m.
Construction of Water Supply Scheme at Ch. Ebenezer (0.19 MLD). The source of raw water is Leimakhong stream which is about 2.48 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(6 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm =2000.00 m GI (Dist) 32mm = 1952.00 m Total =3952.00 m.
Construction of Water Supply Scheme at Charoipandongba Kabui (0.09 MLD). The source of raw water is Sumlok stream which is about 1.99 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(4 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm =2090.00 m GI (Dist) 32mm = 1487.00 m Total =3577.00 m.
Construction of Water Supply Scheme at Chaningpokpi (0.07 MLD). The source of raw water is Heijairok stream which is about 2.37 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(4 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm =2050.00 m GI (Dist) 32mm = 1837.00 m Total =3887.00 m.
Construction of Water Supply Schemeat Maibung Kom (0.01 MLD). The source of raw water is Chingjumlok stream which is about 1.8 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 32mm =2975.00 m GI (Dist) 32mm = 2975.00 m Total =5950.00 m.
Construction of Water Supply Schemeat Tuinomjang (0.02 MLD). The source of raw water is Ngavoh stream which is about 2 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 32mm =3150.00 m GI (Dist) 32mm = 3150.00 m Total =6300.00 m.
Construction of Water Supply Scheme at Komlaching (0.04 MLD). The source of raw water is Sipilok stream which is about 2.4 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm =1900.00 m GI (Dist) 32mm = 960.00 m Total =2860.00 m.
Construction of Water Supply Scheme at LaikotKom (0.05 MLD). The source of raw water is Laikot stream which is about 2.5 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm =1961.00 m GI (Dist) 32mm = 892.00 m Total =2853.00 m.
Construction of Water Supply Scheme at Lamkajang (0.01 MLD). The source of raw water is Lamka stream which is about 1.9 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 32mm =3093.00 m GI (Dist) 32mm = 3093m Total =6186.00 m.
Construction of Water Supply Scheme at Songphel Khullen (0.02 MLD). The source of raw water is Hangkok stream which is about 2.4 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm =1786.00 m GI (Dist) 32mm = 960.00 m Total =2746.00 m.
Construction of Water Supply Scheme at Ngakhapat (0.01 MLD). The source of raw water is Ngakhapat stream which is about 1.95 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 32mm =3456.00 m GI (Dist) 32mm = 3456.00 m Total =6912.00 m.
Construction of Water Supply Scheme at Nungkot Kom (0.03 MLD). The source of raw water is Nongmeichinglok stream which is about 2.49 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm =2120.00 m GI (Dist) 32mm = 1000.00 m Total =3120.00 m.
Construction of Water Supply Scheme at A. Geljang (0.01 MLD). The source of raw water is Aigejanglok stream which is about 1.85 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 32mm =2999.00 m GI (Dist) 32mm = 2999.00 m Total =5998.00 m.
Construction of Water Supply Scheme at Purum Khullen (0.01 MLD).The source of raw water is Purumlok stream which is about 2 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 32mm =3274.00 m GI (Dist) 32mm = 3274.00 m Total =6548.00 m.
Construction of Water Supply Scheme at S. Kanan (0.02 MLD). The source of raw water is Kabanglelok stream which is about 2 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Mains &Dist) 32mm =3015.00 m.
Construction of Water Supply Scheme at Happy Land (0.03 MLD). The source of raw water is Iril stream which is about 1.94 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete GI (Mains &Dist) 32mm =3579.00 m.
Construction of Water Supply Scheme at K. Hengjang (0.04 MLD). The source of raw water is Hengjanglok stream which is about 1.94 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(3 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm =2128.00 m GI (Dist) 32mm = 1373.00 m Total=3501.00 m
Construction of Water Supply Scheme at Wunghon T (0.05 MLD). The source of raw water is Shumlok stream which is about 1.93 kms fromtreatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm =1577.00 m GI (Dist) 32mm = 800.00 m Total= 2377.00 m
Construction of Water Supply Scheme at Khamenlok (0.03 MLD). The source of raw water is Khamenlok stream which is about 1.88 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Mains &Dist) 32mm =2999.00 m
Construction of Water Supply Scheme at Kharam Tangkhul (0.03 MLD). The source of raw water is Kharamlok stream which is about 1.88 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm =2416.00 m GI (Dist) 32mm = 1139.00 m Total=3555.00 m
Construction of Water Supply Scheme at Lairok Kom (0.03 MLD). The source of raw water is Laikot stream which is about 2.5 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm =1890.00 m GI (Dist) 32mm = 997.00 m Total=2887.00 m
Construction of Water Supply Scheme at Phowoibi (0.03 MLD). The source of raw water is Komlok stream which is about 1.99 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm =2150.00 m GI (Dist) 32mm = 993.00 m Total=3143.00 m
Construction of Water Supply Scheme at Sadu Koireng (0.03 MLD). The source of raw water is Kholuilok stream which is about 2 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Mains &Dist) 32mm =2987.00 m
Construction of Water Supply Scheme at Aigejang (0.09 MLD). The source of raw water is Aigejang stream which is about 2.3 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(6 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm =2000.00 m GI (Dist) 32mm =2730.00 m Total = 4730.00 m
Construction of Water Supply Scheme at Khajang (0.07 MLD). The source of raw water is Barap stream which is about 2.4 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC Distribution Tank of 2.7 KL(4 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm =1870.00 m GI (Dist) 32mm =2030.00 m Total = 3900.00 m
Construction of Water Supply Scheme at Mapao Christain (0.08 MLD). The source of raw water is Kacakon stream which is about 3 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity, RCC service reservoir of 50 KL capacity,RCC Distribution Tank of 2.7 KL(4 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm = 2176.00 m GI (Dist) 32mm = 2000.00 m Total = 4176.00 m
Construction of Water Supply Scheme at Nurathel (0.05 MLD). The source of raw water is Inshahbung stream which is about 2.3 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity ,RCC Distribution Tank of 2.7 KL(4 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm =2033.00 m GI (Dist) 32mm = 1900.00 m Total = 3933.00 m
Construction of Water Supply Scheme at Poirou Tangkhul (0.06 MLD). The source of raw water is Poirou stream which is about 2.30 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity ,RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm =1423.00 m GI (Dist) 32mm = 650.00 m Total = 2073.00 m
Construction of Water Supply Scheme at Songjang (0.03 MLD). The source of raw water is Sipilok stream which is about 2.30 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity ,RCC Distribution Tank of 2.7 KL(4 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm =2450.00 m GI (Dist) 32mm = 1845.00 m Total = 4295.00 m
Construction of Water Supply Scheme at T Wakanphai (0.05 MLD). The source of raw water is Lekli stream which is about 0.05 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity ,RCC Distribution Tank of 2.7 KL(4 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm =2450.00 m GI (Dist) 32mm = 2010.00 m Total = 4460.00 m
Construction of Water Supply Scheme at Kamu Koireng (0.10 MLD).The source of raw water is Makhrarok stream which is about 2.4 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity ,RCC Distribution Tank of 2.7 KL(6 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm =2000.00 m GI (Dist) 32mm = 2713.00 m Total = 4713.00 m
Construction of Water Supply Scheme at Bewlaland (0.01 MLD).The source of raw water is Narenpokpi stream which is about 2.1 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity ,RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Mains &Dist) 32mm =2999.00 m
Construction of Water Supply Scheme at Kalikhola (0.02 MLD).The source of raw water is Khalikhosla stream which is about 1.9 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity ,RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Mains &Dist) 32mm =2999.00 m
Construction of Water Supply Scheme at Haiken (0.08 MLD). The source of raw water is Phaijang stream which is about 2.5 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity ,RCC Distribution Tank of 2.7 KL(4 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm = 2450.00 m GI (Dist) 32mm = 2037.00 m Total= 4487.00 m
Construction of Water Supply Scheme at B. Boljang (0.02 MLD). The source of raw water is Boljanglok stream which is about 1.95 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity ,RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Mains &Dist) 32mm =2881.00 m
Construction of Water Supply Scheme at Kailenjang(0.02 MLD). The source of raw water is Kailenjanglok stream which is about 2.5 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity ,RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Mains &Dist) 32mm = 3060.00 m
Construction of Water Supply Scheme at Dongsum(0.07 MLD).The source of raw water is Chajangg stream which is about 1.94 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity ,RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm =1526.00 m GI (Dist) 32mm = 700.00 m Total = 2226.00 m
Construction of Water Supply Scheme at S.Molnom (0.03 MLD). The source of raw water is Koubrulok stream which is about 2 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity ,RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Mains &Dist) 32mm=3012.00 m
Construction of Water Supply Scheme at Simol (0.01 MLD). The source of raw water is Chajangg stream which is about 1.94 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity ,RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Mains &Dist) 32mm =3098.00 m
Construction of Water Supply Scheme at Nakhujang(0.05 MLD). The source of raw water is Abulok stream which is about 2.4 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity ,RCC Distribution Tank of 2.7 KL(4 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm =2450.00 m GI (Dist) 32mm = 2043.00 m Total= 4493.00 m
Construction of Water Supply Scheme at Waroiching (0.01 MLD). The source of raw water is Leimaram waterfall which is about 2.1 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity ,RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Mains &Dist) 32mm =2978.00 m
Construction of Water Supply Scheme at N.Heikon(0.04 MLD). The source of raw water is Leplen Stream which is about 1.30 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity ,RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm =2050.00 m GI (Dist) 32mm =1483.00 m Total =3533.00 m
Construction of Water Supply Scheme at Sinam Jonhol(0.14 MLD). The source of raw water is Sinam Stream which is about 2 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity ,RCC Distribution Tank of 2.7 KL(4 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm =1900.00 m GI (Dist) 32mm =1212.00 m Total = 3112.00 m
Construction of Water Supply Scheme at Bungte khullen (0.02 MLD). The source of raw water is Thongjaolok Stream which is about 1.9 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30)m, RCC settling tank of 12 KL capacity ,RCC Distribution Tank of 2.7 KL(2 nos.) i/c necessary inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials, etc. complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Mains &Dist) 32mm =2936.00 m
Construction of Water Supply Scheme at T.Jalen (0.01 MLD). The source of raw water is Laikop Stream which is about 2.3 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises IntakeWeir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Mains &Dist) 32mm = 2909.00 m
Construction Water Supply Scheme at Yangnoi (0.17 MLD). The source of raw water is Ihang Stream which is about 2.4 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m,Drain (2.00 x 1.00 x 1.60)m, Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm 1700.00 m GI (Dist) 32mm 1802.00 m Total = 3502.00 m
Construction of Water Supply Scheme at Molkon (0.17 MLD). The source of raw water is Ihang Stream which is about 2.4 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)mCollection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12KL capacity, RCC distribution tank of 2.7KL (6 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm 2000.00 m GI (Dist) 32mm 1936.00 m Total = 3936.00 m
Construction of Water Supply Scheme at Salam patong(0.11 MLD). The source of raw water is Patanglok Stream which is about 1.5 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm 2132.00 m GI (Dist) 32mm 1052.00 m Total = 3184.00 m
Construction of Water Supply Scheme at T.Thangkan(0.11 MLD). The source of raw water is Thangkan Stream which is about 2 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work, providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm=1900.00 m GI (Dist) 32mm = 885.00 m Total = 2785.00 m
Construction of Water Supply Scheme at Chingloubung V (2.5 MLD). The source of raw water is NoonpaniStream which is about 2.5 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises IntakeWeir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12KL capacity, RCC distribution tank of 2.7KL (6 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm=1670.00 m GI (Dist) 32mm = 500.00 m Total = 2170.00 m
Construction of Water Supply Scheme at Tokpa Nepali(0.06 MLD). The source of raw water is Tuipajang Stream which is about 2 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm=1670.00 m GI (Dist) 32mm = 500.00 m Total = 2170.00 m
Construction of Water Supply Scheme at G.Songbuphai (0.02 MLD). The source of raw water is Langka Stream which is about 1.98 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Mains &Dist) 32mm =2952.00 m
Construction of Water Supply Scheme at Laikot (0.02 MLD). The source of raw water is Mission Stream which is about 2.5 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Mains &Dist) 32mm =3770.00 m
Construction of Water Supply Scheme at S.Keithelmanbi (0.04 MLD). The source of raw water is Langka Stream which is about 2.5 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12KL capacity, RCC distribution tank of 2.7KL (6 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm =1900.00 m GI (Dist) 32mm =1338.00 m Total = 3238.00 m
Construction of Water Supply Scheme at Laloi(0.04 MLD). The source of raw water is Kabur Stream which is about 1.9 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12KL capacity, RCC distribution tank of 2.7KL (6 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm =1750.00 m GI (Dist) 32mm =1354.00 m Total = 3104.00 m
Construction of Water Supply Scheme at Songtun J(0.03 MLD). The source of raw water is Kalikhola Stream which is about 1.95 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (4 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Mains &Dist) 32mm =3046.00 m
Construction of Water Supply Scheme at M.Wakotphai (MakuiMayangkhang)(0.10 MLD). The source of raw water is Wakotphai Stream which is about 1.95 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises IntakeWeir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (3 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 2300.00 m GI (Dist) 32mm = 1510.00 m Total = 3810.00 m
Construction of Water Supply Scheme at Keithelmanbi (0.05 MLD). The source of raw water is Gangol Stream which is about 2.4 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (3 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 2200.00 m GI (Dist) 32mm = 2222.00 m Total = 4422.00 m
Construction of Water Supply Scheme at Maohing Kuki (0.22 MLD). The source of raw water is Khosla Stream which is about 2.2 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (5 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm = 1550.00 m GI (Dist) 40mm = 2397.00 m Total = 3947.00 m
Construction of Water Supply Scheme at Holjang(0.09 MLD). The source of raw water is Holjang Stream which is about 2.3 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Mains &Dist) 32mm =5172.00 m
Construction of Water Supply Scheme at P.Khothah(0.13 MLD). The source of raw water is Laikop Stream which is about 2.2 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (4 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm =1830.00 m GI (Dist) 32mm =1414.00 m Total = 3244.00 m
Construction of Water Supply Scheme at Naibet (0.05 MLD). The source of raw water is Kali Stream which is about 1.9 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete.GI (Main) 50mm =1500.00 m GI (Dist) 32mm =747.00 m Total = 2247.00 m
Construction of Water Supply Scheme at Satikhola(0.06MLD). The source of raw water is Sati Stream which is about 2.2 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (6 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm =2200.00 m GI (Dist) 32mm =2357m Total =4557.00 m
Construction of Water Supply Scheme at Kharpani(0.03 MLD). The source of raw water is Naibet Stream which is about 1.9 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Mains &Dist) 32mm= 2999.00 m
Construction of Water Supply Scheme at Chuchekop (0.09 MLD). The source of raw water is Jaimaulok Stream which is about 2.4 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (6 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm =2000.00 m GI (Dist) 32mm =2470.00 m Total = 4470.00 m
Construction of Water Supply Scheme at School Praganda (0.05 MLD). The source of raw water isThanbasti Stream which is about 2.2 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (4 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm =2000.00 m GI (Dist) 32mm =2464.00 m Total = 4464.00 m
Construction of Water Supply Scheme at Phoikon (0.05 MLD). The source of raw water is Phoikonlok Stream which is about 2.1 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (4 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm =2100.00 m GI (Dist) 32mm =2389.00 m Total = 4489.00 m
Construction of Water Supply Scheme at Tapon Naga(0.06 MLD). The source of raw water is Kalikhola Stream which is about 2.4 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (4 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm= 2300.00 m GI (Dist) 32mm =2168.00 m Total = 4468.00 m
Construction of Water Supply Scheme at Harup Kuki (0.04 MLD). The source of raw water is Dahalnikoisa Stream which is about 2 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (4 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm =1900.00 m GI (Dist) 32mm =1280.00 m Total = 3180.00 m
Construction of Water Supply Scheme at Songpekjang Nepali (2.5 MLD). The source of raw water isSongtun Stream which is about 2.2 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (4 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm =2500.00 m GI (Dist) 32mm =2072.00 m Total = 4572.00 m
Construction of Water Supply Scheme at Kholpechang Nepali (0.03 MLD). The source of raw water is Kholpechanglok Stream which is about 2 kms from proposed treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :2990.00 m
Construction of Water Supply Scheme at KholpechangKuki (0.03 MLD). The source of raw water is Abu lok Stream which is about 1.9 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Mains &Dist) 32mm 2955.00 m
Construction of Water Supply Scheme at Kotlen(0.05 MLD). The source of raw water is Veitum Stream which is about 2 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (3 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm =2000.00 m GI (Dist) 32mm =2248.00 m Total = 4248.00 m
Construction of Water Supply Scheme at Parengba (0.05 MLD). The source of raw water is Thongjao Stream which is about 1.9 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Mains &Dist) 32mm =2999.00 m
Construction of Water Supply Scheme at Kangchup Makhom (0.2 MLD). The source of raw water is Abulok Stream which is about 2.5 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (6 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm =2250.00 m GI (Dist) 32mm =3280.00 m Total =5530.00 m
Construction of Water Supply Scheme at Wainem(0.03 MLD). The source of raw water is Thangjao Stream which is about 1.9 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Mains &Dist) 32mm =2988.00 m
Construction of Water Supply Scheme at Konsakhul(0.21 MLD). The source of raw water is Likhallok Stream which is about 2.2 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (4 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 2000.00 m GI (Dist) 40mm = 1612.00 m Total = 3612.00 m
Construction of Water Supply Scheme at A.Songpijang(0.13 MLD). The source of raw water is Sipilok Stream which is about 2.4 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (4 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm =1800.00 m GI (Dist) 32mm =1468.00 m Total = 3268.00 m
Construction of Water Supply Scheme at Bolkot(0.02 MLD). The source of raw water is Phaijang Stream which is about 2 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Mains &Dist) 32mm =2990.00 m
Construction of Water Supply Scheme at Sadu Chiru(0.09 MLD). The source of raw water is Leimaram Stream which is about 2.3 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (6 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm =2100.00 m GI (Dist) 32mm =1748.00 m Total = 3848.00 m
Construction of Water Supply Scheme at Kholep (0.06 MLD). The source of raw water is Sipilok Stream which is about 2.4 kms from proposed treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (4 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm=2150.00 m GI (Dist) 32mm =1650.00 m Total = 3800.00 m
Construction of Water Supply Scheme at Leikhampokpi(0.02 MLD). The source of raw water is Purumlok Stream which is about 1.89 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main Dist) 32mm =2955.00 m
Construction of Water Supply Scheme at L.Phaikot(0.07 MLD). The source of raw water is Ngangleikup Stream which is about 2 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm =1600.00 m GI (Dist) 32mm =590.00 m Total = 2190.00 m
Construction of Water Supply Scheme at Saitu(0.03 MLD). The source of raw water is Sipilok Stream which is about 1.9 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main &Dist) 32mm 2999.00 m
Construction of Water Supply Scheme at Phaijang (0.07 MLD). The source of raw water is Phaijang Stream which is about 1.98 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm =1300.00 m GI (Dist) 40mm =722.00 m Total = 2022.00 m
Construction of Water Supply Scheme at Nungang (0.08 MLD). The source of raw water is Thongjaolok Stream which is about 1.9 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm =1300.00 m GI (Dist) 40mm =716.00 m Total = 2016.00 m
Construction of Water Supply Scheme at KoubruLeikha(0.10 MLD). The source of raw water is Koubrulok Stream which is about 2.5 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm =1067.00 m GI (Dist) 40mm =800.00 m Total = 1867.00 m
Construction of Water Supply Scheme at Nungsai Chiru(0.10 MLD). The source of raw water is Thongjaolok Stream which is about 1.97 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm =1420.00 m GI (Dist) 32mm = 710.00 m Total = 2130.00 m
Construction of Water Supply Scheme at Bungte Chiru(0.14 MLD). The source of raw water is Thongjaolok Stream which is about 1.88 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm =1354.00 m GI (Dist) 40mm = 700.00 m Total = 2054.00 m
Construction of Water Supply Scheme at Ankhumbung (0.02 MLD). The source of raw water is Ankhubumlok Stream which is about 2.5 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Mains &Dist) 32mm =3281.00 m
Construction of Water Supply Scheme at B.Phainom (0.02 MLD). The source of raw water is phainomlok Stream which is about 2.5 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main &Dist)32 mm=2980m
Construction of Water Supply Scheme at N.Boljang(0.04 MLD). The source of raw water is Boljanglok Stream which is about 2.4 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40 mm= 2450.00 m GI (Dist) 32 mm= 2319.00 m Total = 4769.00 m
Construction of Water Supply Scheme at E.Mulam(0.01 MLD). The source of raw water is Sarung Stream which is about 1.9 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main &Dist) 32 mm=2936.00 m
Construction of Water Supply Scheme at Ekpan Chingkha(0.01 MLD). The source of raw water is Sarung Stream which is about 1.9 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main &Dist) 32 mm=3025.00 m
Construction of Water Supply Scheme at Soraland T(0.03 MLD). The source of raw water is Sora Stream which is about 2.4 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main &Dist) 32 mm =3259.00 m
Construction of Water Supply Scheme at Nongmeipa (0.01 MLD). The source of raw water is Nongju Stream which is about 1.95 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises IntakeWeir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main &Dist) 32 mm=2989.00 m
Construction of Water Supply Scheme at S. Bolkot (0.02 MLD). The source of raw water is Bolkot Stream which is about 1.95 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main &Dist) 32 mm=3008.00 m
Construction of Water Supply Scheme at Bongbal Khullen(0.04 MLD). The source of raw water is Sakul Stream which is about 2 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (6 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40 mm=1750.00 m GI (Dist) 32mm=1000.00 m Total =2750.00 m
Construction of Water Supply Scheme at Chingmang (0.03 MLD). The source of raw water is Bahko Stream which is about 2 kms fromtreatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main &Dist) 32 mm=3134.00 m
Construction of Water Supply Scheme at Lungther(0.05 MLD). The source of raw water is Kabangle Stream which is about 1.88 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises IntakeWeir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm = 1500.00 m GI (Dist) 32mm = 1668.00 m Total = 3168.00 m
Construction of Water Supply Scheme at Moirangpal (0.03 MLD). The source of raw water isLaikoi Stream which is about 2.5 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Mains &Dist) 32mm =2980.00 m
Construction of Water Supply Scheme at T. Gojang (0.03 MLD). The source of raw water isIchailok Stream which is about 2.3 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Mains &Dist) 32mm =3018.00 m
Construction of Water Supply Scheme at Uran Chiru (0.05 MLD). The source of raw water isChirulok Stream which is about 1.95 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm = 2000.00 m GI (Dist) 32mm = 809.00 m Total= 2809.00 m
Construction of Water Supply Scheme at Khongbal Kuki (0.03 MLD). The source of raw water isMahadev lokStream which is about 1.88 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm = 1900.00 m GI (Dist) 32mm = 923.00 m Total= 2823.00 m
Construction of Water Supply Scheme at Kwarok Maring(0.03 MLD). The source of raw water isWarok Stream which is about 1.9 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm = 2100.00 m GI (Dist) 32mm = 1064.00 m Total= 3164.00 m
Construction of Water Supply Scheme at Belei(0.05 MLD). The source of raw water isBelei Stream which is about 1.97 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 2250.00 m GI (Dist) 32mm = 3372.00 m Total= 5622.00 m
Construction of Water Supply Scheme at Ng. Phainom(0.05 MLD). The source of raw water isHungpichanpham Stream which is about 1.95 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Mains &Dist) 32mm =3005.00 m
Construction of Water Supply Scheme at Ngarumphung(0.05 MLD). The source of raw water isNgarumlokStream which is about 1.99 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm =1400.00 m GI (Dist) 32mm =1500.00 m Total =2900.00 m
Construction of Water Supply Scheme at Nungka(0.05 MLD). The source of raw water isLairokStream which is about 1.96 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm =1500.00 m GI (Dist) 32mm =1295.00 m Total =2795.00 m
Construction of Water Supply Scheme at Rishophung(0.10 MLD). The source of raw water is Risolok Stream which is about 2.4 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (4 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm =1536.00 m GI (Dist) 40mm =1700.00 m Total =3236.00 m
Construction of Water Supply Scheme at Makokching(0.07 MLD). The source of raw water isThamballokStream which is about 2.4 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 1888.00 m GI (Dist) 40mm = 800.00 m Total = 2688.00 m
Construction of Water Supply Scheme at Laipharok Maring(0.08 MLD). The source of raw water isMaringlokStream which is about 2.3 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (4 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm =1665.00 m GI (Dist) 32mm =1700.00 m Total =3365.00 m
Construction of Water Supply Scheme at Sailent(0.13 MLD). The source of raw water isLaikot Stream which is about 2.3 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (4 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm =1764.00 m GI (Dist) 40mm =1600.00 m Total =3364.00 m
Construction of Water Supply Scheme at Sadangsenba Maring(0.07 MLD). The source of raw water isSadangsenba Stream which is about 1.9 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm =1761.00 m GI (Dist) 40mm =800.00 m Total =2561.00 m
Construction of Water Supply Scheme at SinamKom(0.07 MLD). The source of raw water isSinamlok Stream which is about 1.88 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (4 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm =1906.00 m GI (Dist) 32mm =2400.00 m Total =4306.00 m
Construction of Water Supply Scheme at Waithou Chiru (0.09 MLD). The source of raw water isWaithou Stream which is about 1.88 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (4 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm =1600.00 m GI (Dist) 40mm =1623.00 m Total =3223.00 m
Construction of Water Supply Scheme at Thangal Surung(0.10 MLD). The source of raw water is Surunglok Stream which is about 1.88 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (4 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm =1700.00 m GI (Dist) 40mm =1707.00 m Total =3407.00 m
Construction of Water Supply Scheme at Phaikon(0.04MLD). The source of raw water isPhaikonlok Stream which is about 2.1kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm =1838.00 m GI (Dist) 32mm =900.00 m Total =2738.00 m
Construction of Water Supply Scheme at Vaiphei Pakai (0.11MLD). The source of raw water isPakailok Stream which is about 2.4kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (6 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main &Dist) 32 mm =3008.00 m
Construction of Water Supply Scheme at Mapao Thangal(0.05MLD). The source of raw water isSelsiStream which is about 2.3 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (6 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm =2000.00 m GI (Dist) 32mm =2727.00 m Total = 4727.00 m
Construction of Water Supply Scheme at Tuipajang(0.03MLD). The source of raw water isTuipajang Stream which is about 1.98kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm =2000.00 m GI (Dist) 32mm =934.00 m Total = 2934.00 m
Construction of Water Supply Scheme at Gimithari (0.06 MLD). The source of raw water isJaimoulok Stream which is about 2.3kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm =1500.00 m GI (Dist) 32mm =974.00 m Total = 2474.00 m
Construction of Water Supply Scheme at Maramei Naga(0.02MLD). The source of raw water isTaphouStream which is about 2.3 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main &Dist) 32mm - 3216.00 m
Construction of Water Supply Scheme at P. Phaicham(0.01MLD). The source of raw water iskopikholaStream which is about 1.8kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment unit comprises Intake Weir (5.00 x 2.20 x 2.00)m, Drain (2.00 x 1.00 x 1.60)m Collection Chamber (2.00 x 1.00 x 0.30 )m, RCC settling tank of 12 KL capacity, RCC distribution tank of 2.7KL (2 nos) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials etc. complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main &Dist) 32mm = 2999.00 m
Construction of Water Supply Scheme at G. Songlung (0.05 MLD). The source of raw water is Kopikhola stream which is about 2.20 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; collection Chamber (2.00 x 1.00 x 0.30)m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials complete
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 1500.00 m GI (Dist) 32mm = 746.00 m Total = 2246.00 m
Construction of Water Supply Scheme at Langkhichoi (0.04 MLD). The source of raw water is Likham stream which is about 1.90 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; CollectionChamber (2.00 x 1.00 x 0.30)m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 no.s) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm = 1856.00 m GI (Dist) 32mm = 880.00 m Total = 2736.00 m
Construction of Water Supply Scheme at Mahakabui (0.15 MLD). The source of raw water is sembrang stream which is about 2.30 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake Weir ( 5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; collection Chamber (2.00 x 1.00 x 0.30)m ; 12 KLD capacity RCC settling tank, 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (4 no.s) i/c necessary RCC inlet, outlet chamber,site development work , providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints,fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm = 1980.00 m GI (Dist) 32mm = 1060.00 m Total = 3040.00 m
Construction of Water Supply Scheme at P. Geljang (0.02MLD). The source of raw water is kopikhola stream which is about 2.00 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; collection Chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main &Dist) 32mm = 3404.00 m
Construction of Water Supply Scheme at Bethelphai(0.03MLD).The source of raw water is kopikhola stream which is about 1.96 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake Weir ( 5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; collection Chamber (2.00 x 1.00 x0.30)m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm = 1900.00 m GI (Dist) 32mm = 850.00 m Total = 2750.00 m
Construction of Water Supply Scheme at S. Molcham(0.04 MLD).The source of raw water is Molcham stream which is about 1.95 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises Intake Weir ( 5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; collection Chamber (2.00 x 1.00 x 0.30)m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main &Dist) 32mm = 2977.00 m
Construction of Water Supply Scheme at Mongneljang(0.05MLD).The source of raw water is kopikhola stream which is about 1.95 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; collection Chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 1700.00 m GI (Dist) 40mm = 900.00 m Total = 2600.00m
Construction of Water Supply Scheme at Songphung (0.05MLD). The source of raw water is kopikhola stream which is about 1.80 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir ( 5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; collection Chamber (2.00 x 1.00 x 0.30)m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main &Dist) 32mm = 3190.00 m
Construction of Water Supply Scheme at Phainom(0.04MLD).The source of raw water is kopikhola stream which is about 1.80 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprisesof Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; collection Chamber (2.00 x 1.00 x 0.30)m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm = 2183.00 m GI (Dist) 32mm = 1000.00 m Total = 3183.00 m
Construction of Water Supply Scheme at Leplen(0.07MLD). The source of raw water is Leplen stream which is about 2.00 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; collection Chamber (2.00 x 1.00 x 0.30)m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank(2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 2211.00 m GI (Dist) 40mm = 1000.00 m Total = 3211.00 m
Construction of Water Supply Scheme at S. Mongbung(0.03MLD).The source of raw water is Songlei stream which is about 1.92 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir ( 5.00 x 2.20 x 2.00)m ; Drain ( 2.00 x 1.00 x 1.60)m ; collection Chamber : 2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (3 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 1885.00 m GI (Dist) 32mm = 1000.00 m Total = 2885.00 m
Construction of Water Supply Scheme at Bajagara (0.03MLD).The source of raw water is Tapukhosla stream which is about 2.5 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; collection Chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main &Dist) 32mm 3000.00 m
Construction of Water Supply Scheme at Purum Likli(0.03MLD).The source of raw water is Iril stream which is about 1.97 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; collection Chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm = 2000.00 m GI (Dist) 32mm = 716.00 m Total = 2716.00 m
Construction of Water Supply Scheme at Awang Longa Koireng(0.01MLD). The source of raw water is kakrupokpi stream which is about 1.96 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; collection Chamber (2.00 x 1.00 x 0.30)m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber,site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main &Dist) 32mm = 2999.00 m
Construction of Water Supply Scheme at T khullen(0.19MLD).The source of raw water is khullen stream which is about 2.30 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir ( 5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; collection Chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm = 1329.00 m GI (Dist) 50mm = 500.00 m Total = 2829.00 m
Construction of Water Supply Scheme at Makui Naga(0.25MLD).The source of raw water is Makuilok stream which is about 2.4 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir ( 5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; collection Chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (6 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm = 1700.00 m GI (Dist) 40mm = 2285.00 m Total = 3985.00 m
Construction of Water Supply Scheme at Gorkha Tapon(0.13MLD). The source of raw water is Taponkhosla stream which is about 1.9 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; collection Chamber (2.00 x 1.00 x 0.30)m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (3 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm = 1900.00 m GI (Dist) 40mm = 1066.00 m Total = 2966.00 m
Construction of Water Supply Scheme at Lungphou Nepali (0.06MLD).The source of raw water is Metion stream which is about 2.40 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of Intake Weir (5.00 x 2.20 x 2.00)m ;Drain ( 2.00 x 1.00 x 1.60)m ; collectionChamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (3 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 2000.00 m GI (Dist) 40mm = 1593.00 m Total = 3593.00 m
Construction of Water Supply Scheme at Thonglang Atongba (0.17MLD).The source of raw water is Jaimin stream which is about 2.48 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning treatment units comprises of Intake Weir ( 5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; collection Chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (3 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm = 1800.00 m GI (Dist) 40mm = 2093.00 m Total = 3893.00 m
Construction of Water Supply Scheme at Liyai Kalapahar(0.05MLD).The source of raw water is kalikhosla stream which is about 2.00 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60; collection Chamber (2.00 x 1.00 x 0.30)m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (3 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm = 1097.00 m GI (Dist) 32mm = 1745.00 m Total = 2842.00 m
Construction of Water Supply Scheme at Noonpani(0.06MLD). The source of raw water is Noonpani stream which is about 1.98 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain ( 2.00 x 1.00 x 1.60)m ; collection Chamber (2.00 x 1.00 x 0.30)m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main &Dist) 32mm = 2988m
Construction of Water Supply Scheme at Govajang(0.01MLD).The source of raw water is Govajang stream which is about 1.89 kms from treatment site.
Design, drawing, construction, testing and commissioningof treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; collection Chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (3 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm = 2500.00 m GI (Dist) 32mm = 1925.00 m Total = 4425.00 m
Construction of Water Supply Scheme at Haijang (0.05MLD).The source of raw water is Haijanglok stream which is about 2 kms from treatment site.
Design, drawing, construction, testing and commissioningof treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; collection Chamber (2.00 x 1.00 x 0.30)m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 1800.00 m GI (Dist) 32mm = 612.00 m Total = 2412.00 m
Construction of Water Supply Scheme at Chalwa(0.15MLD).The source of raw water is Chalwa stream which is about 1.99 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir ( 5.00 x 2.20 x 2.00)m ; Drain ( 2.00 x 1.00 x 1.60)m ; collection Chamber (2.00 x 1.00 x 0.30 )m ; 12 K, LD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm = 1240.00 m GI (Dist) 40mm = 545.00 m Total = 2745.00 m
Construction of Water Supply Scheme at Selsi(0.10 MLD). The source of raw water is Leisang stream which is about 2.49 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; collection Chamber (2.00 x 1.00 x 0.30)m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm = 2000.00 m GI (Dist) 32mm = 1095.00 m Total = 3095.00 m
Construction of Water Supply Scheme at Thaldara(0.05MLD). The source of raw water is Thaldarakhosla stream which is about 1.97 kms from treatment site.
Design, drawing, construction, testing and commissioningof treatment units comprises of Intake Weir ( 5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; collection Chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 1550.00 m GI (Dist) 32mm = 718.00 m Total = 2268.00 m
Construction of Water Supply Scheme at Jangmol(0.05MLD).The source of raw water is koubru stream which is about 2.47 kms from treatment site.
Design, drawing, construction, testing and commissioningof treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; collection Chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 2300.00 m GI (Dist) 32mm = 1680.00 m Total = 3980.00 m
Construction of Water Supply Scheme at Haspukhri(0.05MLD).The source of raw water is Tapon stream which is about 2.47 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; collection Chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (4 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 2134.00 m GI (Dist) 32mm = 1600.00 m Total = 3734.00 m
Construction of a water supply scheme at Chingloubung (0.05MLD).The source of raw water is Thatne stream which is about 1.98 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; collection Chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (4 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 2000.00 m GI (Dist) 32mm = 2730.00 m Total = 4730.00 m
Construction of Water Supply Scheme at Lungphou(0.04MLD).The source of raw water is Lungphou stream which is about 1.80 kms from treatment site.
Design, drawing, construction, testing and commissioningof treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; collection Chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm = 2000.00 m GI (Dist) 32mm = 1322.00 m Total = 3322.00 m
Construction of Water Supply Scheme at Gorkha Harup(0.14MLD).The source of raw water is Harup stream which is about 2.30 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; collection Chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (4 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm = 2100.00 m GI (Dist) 32mm = 1716.00 m Total = 3816.00 m
Construction of Water Supply Scheme at Kholen (0.05MLD).The source of raw water is Haijanglok stream which is about 2 kms from treatment site.
Design, drawing, construction, testing and commissioningof treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; collection Chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm = 1900.00 m GI (Dist) 32mm = 940.00 m Total = 2840.00 m
Construction of Water Supply Scheme at Kholgari (0.02MLD).The source of raw water is khopi stream which is about 1.99 kms from treatment site.
Design, drawing, construction, testing and commissioningof treatment units comprises of Intake Weir ( 5.00 x 2.20 x 2.00)m ; Drain ( 2.00 x 1.00 x 1.60)m ; collection Chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main &Dist) 32mm = 2965.00 m
Construction of Water Supply Scheme at West Santing (0.02 MLD). The source of raw water is Maohing stream which is about 2.47 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main &Dist) 32mm = 3418.00 m
Construction of Water Supply Scheme at Avail (0.01MLD). The source of raw water is Ganga stream which is about 1.97 kms from proposed treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main &Dist) 32mm = 2955.00 m
Construction of Water Supply Scheme at Thanamba (0.05MLD).The source of raw water is Asang stream which is about 1.9 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30) , 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 1697.00 m GI (Dist) 32mm = 848.00 m Total = 2545.00 m
Construction of Water Supply Scheme at Dhorigari(0.02MLD). The source of raw water is Jaimin stream which is about 1.90 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm = 2300.00 m GI (Dist) 32mm = 1680.00 m Total = 3980.00 m
Construction of Water Supply Scheme at Motjang(0.26MLD).The source of raw water is Sipilok stream which is about 1.9 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir ( 5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main &Dist) 32mm = 2990.00 m
Construction of Water Supply Scheme at S. Boungpi(0.02MLD).The source of raw water is Notok stream which is about 1.89 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main &Dist) 32mm = 2960.00 m
Construction of Water Supply Scheme at S. Lhangnom(0.07MLD).The source of raw water is Sipilok stream which is about 2.49 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir ( 5.00 x 2.20 x 2.00)m ; Drain ( 2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 2200.00 m GI (Dist) 32mm = 2760.00 m Total = 4960.00 m
Construction of Water Supply Scheme at Bethel(0.07MLD).The source of raw water is Likham stream which is about 2.49 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain ( 2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm = 2000.00 m GI (Dist) 32mm = 907.00 m Total = 2907.00 m
Construction of Water Supply Scheme at Haijang (0.07MLD).The source of raw water is Likham stream which is about 2.49 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main &Dist) 32mm= 2982.00 m
Construction of Water Supply Scheme at L. Singhol(0.05MLD). The source of raw water is Sipilok stream which is about 1.90 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main &Dist) 32mm= 2971.00 m
Construction of Water Supply Scheme at Songjang Khunou(0.02MLD).The source of raw water is khengjang stream which is about 1.90 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main &Dist) 32mm= 3050.00 m
Construction of Water Supply Scheme at Sadu Mongsaba Kuki(0.05MLD). The source of raw water is Isingchaibi stream which is about 1.89 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm = 2200.00 m GI (Dist) 32mm = 1365.00 m Total = 3565.00 m
Construction of Water Supply Scheme at Samuk(0.04MLD).The source of raw water is Dakana stream which is about 1.89 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm = 1824.00 m GI (Dist) 32mm = 900.00 m Total = 2724.00 m
Construction of Water Supply Scheme at Chini Ingkhol(0.05MLD). The source of raw water is Thongjao stream which is about 2 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm = 2200.00 m GI (Dist) 32mm = 1156.00 m Total = 3356.00 m
Construction of Water Supply Scheme at Motbung Nepali(0.08MLD). The source of raw water is Phaijang stream which is about 1.9 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 1657.00 m GI (Dist) 40mm = 700.00 m Total = 2357.00 m
Construction of Water Supply Scheme at Pangmol(0.11MLD). The source of raw water is khengjang stream which is about 2.30 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir ( 5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (3 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm = 1800.00 m GI (Dist) 40mm = 1728.00 m Total = 3528.00 m
Construction of Water Supply Scheme at Khengjang (0.11 MLD).The source of raw water is Khengjang stream which is about 1.80 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir ( 5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber ( 2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm = 1810.00 m GI (Dist) 40mm = 757.00 m Total = 2567.00 m
Construction of Water Supply Scheme at Sapermeina(0.17MLD).The source of raw water is Sipi stream which is about 2.30 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.6)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (6 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 2000.00 m GI (Dist) 32mm = 2714.00 m Total = 4714.00 m
Construction of Water Supply Scheme at C. Kholen (0.05MLD).The source of raw water is Songjang stream which is about 1.90 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber ( 2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm = 2367.00 m GI (Dist) 32mm = 910.00 m Total = 3277.00 m
Construction water supply scheme at Chamol(0.02MLD).The source of raw water is Chamol stream which is about 1.90 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Mains &Dist) 32mm = 2989.00 m
Construction of Water Supply Scheme at Chikkim Veng(0.15MLD).The source of raw water is Ichai stream which is about 2.3 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir ( 5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm = 2014.00 m GI (Dist) 32mm = 700.00 m Total = 2714.00 m
Construction of Water Supply Scheme at H. Yangnom (0.04MLD).The source of raw water is Yangnom stream which is about 2.3 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm = 2254.00 m GI (Dist) 32mm = 900.00 m Total = 3154.00 m
Construction of Water Supply Scheme at Moljang (0.08MLD).The source of raw water is Moljang stream which is about 2.2 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 2107.00 m GI (Dist) 32mm = 1900.00 m Total = 4007.00 m
Construction of Water Supply Scheme at Songpehjang (0.05MLD). The source of raw water is Songpehjang stream which is about 2.3 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain ( 2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm = 2450.00 m GI (Dist) 32mm = 2335.00 m Total = 4785.00 m
Construction of Water Supply Scheme at L. Songphel (0.04MLD). The source of raw water is Vakon stream which is about 1.9 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm = 2450.00 m GI (Dist) 32mm = 2436.00 m Total = 4886.00 m
Construction of Water Supply Scheme at Twisemphai (0.02MLD). The source of raw water is Twisem stream which is about 1.8 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (4 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main &Dist) 32mm =2999.00 m
Construction of Water Supply Scheme at Khaochangbung (0.01MLD). The source of raw water is Banglham stream which is about 1.9 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30)m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main &Dist) 32mm =2982.00 m
Construction of Water Supply Scheme at Leihaopokpi (0.02MLD). The source of raw water is Leihaolok stream which is about 1.9 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main &Dist) 32mm =3107.00 m
Construction of Water Supply Scheme at A.Phainom (0.02 MLD). The source of raw water is Aigejanglok stream which is about 1.9 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir ( 5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main &Dist) 32mm =2982.00 m
Construction of Water Supply Scheme at Sipijang (0.04MLD). The source of raw water is Sipilok stream which is about 1.9 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir ( 5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30)m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm = 1900.00 m GI (Dist) 32mm = 982.00 m Total = 2882.00 m
Construction of Water Supply Scheme at Phunal Maring (0.14MLD). The source of raw water is Maring stream which is about 1.9 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30)m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm = 1379.00 m GI (Dist) 40mm = 600.00 m Total = 3893.00 m
Construction of Water Supply Scheme at A. Twisomjang(0.05MLD). The source of raw water is Konghom stream which is about 2.3 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (4 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints,fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 2025.00 m GI (Dist) 32mm = 1800.00 m Total = 3825.00 m
Construction of Water Supply Scheme at Old Boljang (0.09MLD).The source of raw water is Kolnoi stream which is about 2.3 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (4 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints,fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm = 1759.00 m GI (Dist) 32mm = 2400.00 m Total = 4159.00 m
Construction of Water Supply Scheme at C Mojol (0.06MLD).The source of raw water is Mojol stream which is about 2.4 kms from proposed treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir ( 5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 2000.00 m GI (Dist) 32mm = 1975.00 m Total = 3975.00 m
Construction of Water Supply Scheme at Chingdai Khullen (0.05MLD).The source of raw water isKangui stream which is about 2.3 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain ( 2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (4 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 2071.00 m GI (Dist) 32mm = 2000.00 m Total = 4071.00 m
Construction of Water Supply Scheme at Denglen (0.08MLD).The source of raw water isIhanglok stream which is about 2.3 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (6 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 2000.00 m GI (Dist) 32mm = 2620.00 m Total = 4620.00 m
Construction of Water Supply Scheme at Gwaltabi Kuki (0.07MLD).The source of raw water is Tabilok stream which is about 2 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain ( 2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (4 nos) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm = 2300.00 m GI (Dist) 32mm = 2606.00 m Total = 4906.00 m
Construction of Water Supply Scheme at Haokhongching (0.04MLD).The source of raw water is Kabanglelok stream which is about 2.4 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (6 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints,fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 2000.00 m GI (Dist) 32mm = 2806.00 m Total = 4806.00 m
Construction of Water Supply Scheme at Luwangsangol (0.11 MLD).The source of raw water is Kolnoilok stream which is about 2 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (4 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints,fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm = 1700.00 m GI (Dist) 32mm = 1624.00 m Total = 3324.00 m
Construction of Water Supply Scheme at Maojang (0.06MLD). The source of raw water is Selihom stream which is about 2.3 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir ( 5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (4 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints,fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 2000.00 m GI (Dist) 32mm = 1820.00 m Total = 3820.00 m
Construction of Water Supply Scheme at Maphou Kuki (0.08 MLD).The source of raw water is Sum lok stream which is about 1.9 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints,fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm = 1700.00 m GI (Dist) 32mm = 893.00 m Total = 2593.00 m
Construction of Water Supply Scheme at Naphai (0.04MLD).The source of raw water is Naphai stream which is about 1.9 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir ( 5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (3 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints,fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Mains &Dist) 32mm = 3848.00 m
Construction of Water Supply Scheme at P.Phaimol (0.05MLD). The source of raw water is Tapanglilok stream which is about 2.1 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir ( 5.00 x 2.20 x 2.00)m ; Drain ( 2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (4 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints,fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 1962.00 m GI (Dist) 32mm = 1900.00 m Total = 3862.00 m
Construction of Water Supply Scheme at L Chajang (0.04MLD). The source of raw water is Chajanglok stream which is about 2.3 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (4 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints,fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 2010.00 m GI (Dist) 32mm = 2144.00 m Total = 4154.00 m
Construction ofWater Supply Scheme at S. Khonomphai (0.05 MLD).The source of raw water is Khonomlok stream which is about 1.7 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain ( 2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints,fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 1538.00 m GI (Dist) 32mm = 700.00 m Total = 2238.00 m
Construction of Water Supply Scheme at Songphel L (0.04 MLD). The source of raw water is Bamanlok stream which is about 1.9 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment unkits comprises of Intake Weir ( 5.00 x 2.20 x 2.00)m ; Drain ( 2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (4 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints,fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm = 2400.00 m GI (Dist) 32mm = 2163.00 m Total = 4563.00 m
Construction of Water Supply Scheme at Thayong (0.04MLD).The source of raw water is Chirulok stream which is about 1.89 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir ( 5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (4 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm = 1716.00 m GI (Dist) 32mm = 1600.00 m Total = 3316.00 m
Construction of Water Supply Scheme at Tusam (0.07MLD).The source of raw water is Tusamlok stream which is about 1.9 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.6)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (4 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints,fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 2100.00 m GI (Dist) 32mm = 2013.00 m Total = 4113.00 m
Construction of Water Supply Scheme at Y. Langkhong (0.07MLD).The source of raw water is Surung stream which is about 1.8 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (4 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 2000.00 m GI (Dist) 32mm = 2166.00 m Total = 4166.00 m
Construction of Water Supply Scheme at Makeng Ngamneh (0.03MLD). The source of raw water is Sumlok stream which is about 1.9 kms from treatment site
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber ( 2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm = 1900.00 m GI (Dist) 32mm = 892.00 m Total = 2792.00 m
Augmentation of Water Supply Scheme at Taharbasti (0.04 MLD). The source of raw water is Taharbastilok stream which is about 1.9 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber ( 2.00 x 1.00 x 0.30)m ; 12 KLD capacity RCC settling tank , 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm = 2114.00 m GI (Dist) 32mm = 1000.00 m Total = 3114.00 m
Construction of Water Supply Scheme at Songjang Pakang (0.06MLD).The source of raw water is Iranglok stream which is about 1.9 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 1500.00 m GI (Dist) 32mm = 757.00 m Total = 2257.00 m
Construction ofWater Supply Scheme at Maokot (0.02MLD).The source of raw water is Maokotlok stream which is about 2.3 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir ( 5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm = 2500.00 m GI (Dist) 32mm = 2342.00 m Total = 4842.00 m
Construction of Water Supply Scheme at Beleijang (0.11 MLD).The source of raw water is Khrutaklok stream which is about 2.3 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment unots comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 65mm = 1600.00 m GI (Dist) 32mm = 1470.00 m Total = 3070.00 m
Construction of Water Supply Scheme at Chawangkining (0.05MLD).The source of raw water is Chawangkininglok stream which is about 1.9 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (3 nos.) i/c necessary RCC inlet, outlet chamber,site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 2000.00 m GI (Dist) 32mm = 1612.00 m Total = 3612.00 m
Construction of Water Supply Scheme at S.Bollen (0.05 MLD).The source of raw water is Sipilok stream which is about 2.4 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank,2.7 KLD capacity RCC distribution tank (4 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 2019.00 m GI (Dist) 32mm = 2050.00 m Total = 4069.00 m
Construction of Water Supply Scheme at Lhangjol (0.02 MLD).The source of raw water is Khengjanglok stream which is about 1.9 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Mains &Dist) 32mm =2969.00 m
Construction of Water Supply Scheme at Tuipajang (0.05 MLD). The source of raw water is Tuipajanglok stream which is about 2.3 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir ( 5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (4 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 2050.00 m GI (Dist) 32mm = 2090.00 m Total = 4140.00 m
Construction of Water Supply Scheme at Chalbung (0.04 MLD). The source of raw water is Phaijang stream which is about 1.9 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of Intake Weir ( 5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm = 1823.00 m GI (Dist) 32mm = 1000.00 m Total = 2823.00 m
Construction of Water Supply Scheme at Phailenjang (0.01 MLD). The source of raw water is Phailenlok stream which is about 1.8 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00) ; Drain (2.00 x 1.00 x 1.60) ; Collection Chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Mains &Dist) 32mm =3240m
Construction of Water Supply Scheme at S.Boungjang (0.02 MLD).The source of raw water is Phailenlok stream which is about 1.9 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Mains &Dist) 32mm =2999m
Construction of Water Supply Scheme at S. Jangnomphai (0.02MLD).The source of raw water is Jangnom stream which is about 1.9 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain ( 2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Mains &Dist) 32mm =2969m
Construction of Water Supply Scheme at Songbem (0.05MLD). The source of raw water is Ithoi stream which is about 1.9 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber,site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints,fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm =1900.00 m GI (Dist) 32mm =872.00 m Total = 2772.00 m
Construction of Water Supply Scheme at Tengkonphai (0.03 MLD).The source of raw water is Tengkon stream which is about 1.9 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Mains &Dist) 32mm =3173.00 m
Construction of Water Supply Scheme at Tuisomjang (0.03 MLD).The source of raw water is Ngavoh stream which is about 1.9 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.6)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber,site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming to IS:1239 (Pt-II/1992-fourth revision) with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings (specials) / GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 40mm = 1800.00 m GI (Dist) 32mm = 970.00 m Total = 2770.00 m
Construction of Water Supply Scheme at Walpabung (0.03 MLD).The source of raw water is Ithoi stream which is about 1.9 kms from treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.00)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI(Main) 40mm =1900.00 m GI (Dist) 32mm = 830.00 m Total = 2730.00 m
Construction of Water Supply Scheme at Tingpibung (0.09 MLD).The source of raw water is Tingpilok stream which is about 1.8kmfrom treatment site.
Design, Drawing, Construction, Testing and Commissioning of treatment units comprises of Intake Weir (5.00 x 2.20 x 2.0)m ; Drain (2.00 x 1.00 x 1.60)m ; Collection chamber (2.00 x 1.00 x 0.30 )m ; 12 KLD capacity RCC settling tank, 2.7 KLD capacity RCC distribution tank (2 nos.) i/c necessary RCC inlet, outlet chamber, site development work, providing and testing internal pipes, pipe specials complete.
Providing & laying of GI Main & Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming toIS:1239(Pt-II/1992-fourth revision)with amendment no. 1in random length of 4 to 7 m specification including excavation,sandbedding, jointing, backfilling,transporting and necessary road restoration works including providing and laying of GI fittings(specials) and suitable GI valves as per relevant IS Code. Suitable masonrychambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings,valvesetc.and disinfection of all pipes, trial run and commissioning etc. complete :GI (Main) 50mm = 1620.00 m GI (Dist) 32mm = 742.00 m Total = 2362.00 m
Operation and maintenance of the above Schemes for a period of 5years after commission of the project on turnkey basis.
JMC Projects (India) Limited
US Dollar
Japanese Yen
European Dollar
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid