| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 CrAccepted-AOC 11 1 1ST FLOOR KHR HOUSE CUNNINGHAM ROAD VASANTANAGAR BANGALORE KARNATAKA 560052 | BENGALURU URBAN | KARNATAKA | 560052 | ₹7.3 Cr | L1 | Accepted-AOC Approved by competent authority of IISc. |
| 2 | Rejected-Technical | - | - | Rejected-Technical For details, please see the notice |
| 3 | Rejected-Technical 701 57 MANJUSHA BUILDING 701 57 NEHRU PLACE NEHRU PLACE NEW DELHI DELHI 110019 | SOUTH EAST DELHI | DELHI | 110019 | - | - | Rejected-Technical For details, please see the notice |
| 4 | Rejected-Technical | - | - | Rejected-Technical For details, please see the notice |
| 5 | Rejected-Technical | - | - | Rejected-Technical For details, please see the notice |
Tender Value
Refer Docs
EMD Value
₹10 L
Closing Date
27 Dec 2019, 5:00 pmClosed
Chair, TINA
Institute of Science, Bangalore
Supply, installation, and commissioning of Wireless LAN Access Infrastructure at hostels of IISc Bangalore
2019_IISC_519579_3
IISC/TINA/11/2019 Date 20.11.2019
Open Tender
Electronic Components And Devices
Supply
180 days
Hostels, Indian Institute of Science, Bangalore
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10 L
Yes
24 Jun 2020
12 Dec 2019
31 Dec 2019
12 Dec 2019
27 Dec 2019
13 Dec 2019
Amount
Wi-Fi Access Point with at least 3 radios, of which at least 2 must be 4x4 MU-MIMO broadcasting at 2.4Ghz and 5Ghz and have WIPS and automatic channel allocation functionality with cloud-based controller in HA mode.
Wi-Fi Access Point with at least 3 radios, of which at least 2 must be 2x2 MU-MIMO broadcasting at 2.4Ghz and 5Ghz and have WIPS and automatic channel allocation functionality with cloud-based controller in HA mode. The Access Point must have antennas with gain of 6.0 dBi or more
Wi-Fi Access Point with at least 3 radios, of which at least 2 must be 2x2 MU-MIMO broadcasting at 2.4Ghz and 5Ghz and have WIPS and automatic channel allocation functionality with cloud-based controller in HA mode. The Access Point must have at least 2 LAN interface (excluding up-link)
24 SFP ports with 2 SFP+ ports layer-2 manageable 1G/10G switch with dual power supply
12 SFP ports with 2 SFP+ ports layer-2 manageable 1G/10G switch with dual power supply
24 UTP port POE+ switch with 4 SFP port layer-2, 10/100/1000 Mbps manageable switch having at least 370 W power budget for POE (Support POE+ on 12 ports concurrently)
24 UTP port POE+ switch with 2 SFP port layer-2, 10/100/1000 Mbps manageable switch having at least 370 W power budget for POE (Support POE+ on 12 ports concurrently)
Single Mode 1310nm SFP+ transceiver (10GBASE-LR)
Single Mode 1310nm SFP transceiver (1000BASE-LX)
6-Core Single Mode (9/125µm) armored outdoor Optical Fibre Cable in meters
4-Core Single Mode (9/125µm) indoor Optical Fibre Cables in meters
CAT 6 UTP cable in meters
Unloaded UTP Jack Panel
CAT 6 Information Outlet compatible with jack panel mentioned above
RJ45 connector
24 Fibre core LIU with LC connector, mountable in 19’’ network rack
12 Fibre core LIU with LC connector, mountable in 19’’ network rack
6 Fibre Core LIU with LC connector, mountable in 19’’ network rack
Cable manager mountable in 19” Network Rack
CAT 6 UTP Patch Cord 1 meter
Single Mode pigtail with LC connector
LC-LC single mode duplex patch cord 2 meter
LC-LC single mode duplex patch cord 1 meters
19-inch, 530 mm depth, 9U Wall Mountable Network rack with 4 socket power-strip
19-inch, 1000 mm depth, 32U Floor Standing Network rack with 8 socket power-strip
PVC casing and capping 25x25mm in meters with necessary accessories
PVC casing and capping 45x45mm in meters with necessary accessories
PVC conduit of diameter of 32mm in meters with necessary accessories
1.5-inch HDPE pipe with of PE-63 or higher in meters
20 KVA, 3φ input 1φ output online UPS with SMF Batteries providing at least 1hour backup for a load of 12.5KW with battery stand and other necessary accessories, including input and output circuits (cabling and MCB).
5 KVA, 1φ online UPS with SMF Batteries providing at least 1hour backup for a load of 4KW with battery stand and other necessary accessories including input and output circuits (cabling and MCB).
3 KVA, 1φ online UPS with SMF Batteries providing at least 1hour backup for a load of 2KW with enclosures and other necessary accessories including input and output circuits (cabling and MCB).
5/15 AMPS round pin power socket with switch and back box
3-core, 1.5sqmm wire, shielded copper electrical cable in meters
Ceiling mountable extension pole (extendable from 0.5ft to 3ft) with tilt-able Access Point mounting bracket of Metal MS/Aluminum with powder coating for mounting Access Point
Configuration and Installation/mounting on ceiling/wall or angle bracket of Access points with labelling
Configuration and Installation of Network Switches in network rack with labelling
Excavation of soil (depth 3 feet, width 1 feet) and resurfacing for burial of HDPE Pipe per running meter
Excavation of soil and construction of 3x3x3 ft brick chamber with RCC lid for pulling outdoor OFC
Horizontal Directional Drilling (HDD) for crossing roads in meters
Moling for crossing roads in meters
Installation of UTP cables through PVC casing and capping in meters
Installation of indoor OFC through PVC conduit in meters
Installation of indoor electrical cables through PVC conduit in meters
Installation of PVC conduit in meters
RCC core cutting of 3-inch diameter for inter-floor wiring
Installation of HDPE pipe underground (3 feet from solid surface) in meters
Installation of outdoor OFC through HDPE pipe in meters
Installation, termination and labelling of UTP cables on Jack Panel
Termination and labelling of UTP cables on RJ45 Connector
Installation and labelling of LIU
Fusion splicing of pigtails with OFC inside LIU
Installation of power socket
Installation of 32U network rack with cable dressing and labelling on patch cord
Installation of 9U network rack with cable dressing and labelling on patch cord
Installation of 20KVA UPS and batteries with proper earthing and MCB
Installation of 5KVA UPS and batteries with proper earthing and MCB
Installation of 3KVA UPS and batteries with proper earthing and MCB
Documentation of the entire project as mentioned in RFP
Testing and generating reports as mentioned in RFP
AMC charges for addition 2 years post 3 years warranty
US Dollar
Portion of Quoted Rate in Currency
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .