Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC | L1 | Accepted-AOC Less Estimate Rate | |
| 2 | L2₹2.9 L+₹34,945.34 (13.7%)Rejected-AOC | L2 | Rejected-AOC Above Estimate Rate |
| Sl No | Description | Qty | Unit | B SUGUNA L2 | M/S. SRI RAJALAKSHMI RNTERPRISES L1 |
|---|---|---|---|---|---|
| 1.001.Providing paver block Road at kalki nagar in Puliyur Panchayat 50 m x 3.75 m | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay and hard gravelly soil as per SS20B for narrow foundations. Etc,.complete. | 6 | Cum | 250 ₹1,500 | 225 ₹1,350 Lowest |
| 3.00 | Cement Concrete 1:4:8 ( One Cement Five sand and Ten Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete. | 2.3 | Cum | 6,000 ₹13,800 | 5,845 ₹13,443.5 Lowest |
| 4.00 | Cement Concrete 1:3:6 (One cement, Three sand, Six Hard Broken stone) using 20 mm guage machine broken hard broken granite stone jelly including cost conveyance and all labour charges etc. complete. | 5.98 | Cum | 6,500 ₹38,870 | 6,321 ₹37,799.58 Lowest |
| 5.00 | Supply and Errecting for Centering and shuttering for core wall sides including cost and conveyance and materials of labour charges etc,.complete. | 52 | Sqm | 250 ₹13,000 | 236 ₹12,272 Lowest |
| 6.00 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) . | 16.45 | Cum | 1,545 ₹25,415.25 | 1,452 ₹23,885.4 Lowest |
| 7.00 | Flooring with Paver Blocks laid as interlocking blocks inclouding cost and conveyance and other labour charges 60mm Paver Block | 164.5 | Sqm | 850 ₹1,39,825 | 720 ₹1,18,440 Lowest |
| 8.00 | Supply and fixing 110mm PVC Pipe SOR VOL II (WD-MW-UH-HR-HC) 2024-25 Page No 5 | 16 | Rm | 452 ₹7,232 Lowest | 452 ₹7,232 Lowest |
| 9.00 | Provision for 110mm PVC End Cap SOR VOL II (WD-MW-UH-HR-HC) 2024-25 Page No 10 | 8 | Nos | 754 ₹6,032 Lowest | 754 ₹6,032 Lowest |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 44,221.37 ₹44,221.37 | 39,681.81 ₹39,681.81 Lowest |
Tender Value
₹2.6 L
EMD Value
₹3,000
Closing Date
28 Jul 2025, 3:00 pmClosed
Block Development Officer VP
Tiruvallur Panchayat Union Office at Ikkadu
Providing paver block Road at kalki nagar in Puliyur Panchayat 50 m x 3.75 m
2025_RDTN_584960_1
2448/2024/A7
Open Tender
Civil Works
Item Rate
Tiruvallur Panchayat Union Office at Ikkadu
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3,000
Yes
Tiruvallur Panchayat Union Office at Ikkadu
30 Sept 2025
23 Jul 2025
28 Jul 2025
23 Jul 2025
28 Jul 2025
24 Jul 2025
24 Jul 2025
Amount
1.Providing paver block Road at kalki nagar in Puliyur Panchayat 50 m x 3.75 m
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay and hard gravelly soil as per SS20B for narrow foundations. Etc,.complete.
Cement Concrete 1:4:8 ( One Cement Five sand and Ten Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete.
Cement Concrete 1:3:6 (One cement, Three sand, Six Hard Broken stone) using 20 mm guage machine broken hard broken granite stone jelly including cost conveyance and all labour charges etc. complete.
Supply and Errecting for Centering and shuttering for core wall sides including cost and conveyance and materials of labour charges etc,.complete.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Flooring with Paver Blocks laid as interlocking blocks inclouding cost and conveyance and other labour charges 60mm Paver Block
Supply and fixing 110mm PVC Pipe SOR VOL II (WD-MW-UH-HR-HC) 2024-25 Page No 5
Provision for 110mm PVC End Cap SOR VOL II (WD-MW-UH-HR-HC) 2024-25 Page No 10
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
B SUGUNA (BID ID -1413497)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_698856.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .