| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹59.8 CrAccepted-AOC PLAT NO 943 54TH STREET T V S COLONY ANNANAGAR WEST EXTENSION CHENNAI PIN 600 101 | CHENNAI | CHENNAI | TAMIL NADU | 600101 | ₹59.8 Cr Quoted ₹63.8 Cr | L1 | Accepted-AOC Lowest rate quoted bidder is accepted |
| 2 | L2₹67.2 CrRejected-AOC 31 A SELVAVINAYAGAR KOIL STREET THIRUVALLUVAR NAGAR ITI BACKSIDE G N MILLS POST COIMBATORE DISTRICT PIN 641 029 | COIMBATORE | COIMBATORE | TAMIL NADU | 641029 | ₹67.2 Cr | L2 | Rejected-AOC Due to highest rate quoted bidder is rejected |
| Sl No | Description | Qty | Unit | ECO PROTECTION ENGINEERS PVT LTD L1 | CLASSIC ENGINEERING ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00Outsourcing of Operation and Maintenance of Package – I to III under Hogenakkal Water Supply and Fluorosis Mitigation Projectin Dharmapuri & Krishnagiri Districts for a period of 36 months (From 01.04.2026 to 31.03.2029 - 3 Years) - e-submission | |||||
| 1.01 | Outsourcing of Operation and Maintenance of Intake Works, Raw Water Pumping Station, Treatment Plant, Treated Water Pumping station, Booster Pumping Station, Pumping Mains, Madam Master Balancing Reservoir, Hogenakkal Under Sewerage Scheme and allied works in Package-I under Hogenakkal Water Supply and Fluorosis Mitigation Project for the Period from 01.04.2026 to 31.03.2027 - Package-I - First Year | 1 | No | 7,47,45,736 ₹7.5 Cr | 7,94,47,754 ₹7.9 Cr |
| 1.02 | Outsourcing of Operation and Maintenance of Intake Works, Raw Water Pumping Station, Treatment Plant, Treated Water Pumping station, Booster Pumping Station, Pumping Mains, Madam Master Balancing Reservoir, Hogenakkal Under Sewerage Scheme and allied works in Package-I under Hogenakkal Water Supply and Fluorosis Mitigation Project for the Period from 01.04.2027 to 31.03.2028 - Package - I - Second Year | 1 | No | 7,70,84,380 ₹7.7 Cr | 8,10,92,854 ₹8.1 Cr |
| 1.03 | Outsourcing of Operation and Maintenance of Intake Works, Raw Water Pumping Station, Treatment Plant, Treated Water Pumping station, Booster Pumping Station, Pumping Mains, Madam Master Balancing Reservoir, Hogenakkal Under Sewerage Scheme and allied works in Package-I under Hogenakkal Water Supply and Fluorosis Mitigation Project for the Period from 01.04.2028 to 31.03.2029 - Package - I - Third Year | 1 | No | 8,03,75,903 ₹8.0 Cr | 8,31,82,154 ₹8.3 Cr |
| 1.04 | Out Souring of Operation and Maintenance of Hogenakkal Water supply and Fluorosis Mitigation Project for Dharmapuri and Krishnagiri Districts for the period From 01.04.2026 to 31.03.2027 - Package II - First Year | 1 | No | 4,91,12,403 ₹4.9 Cr | 5,44,66,492 ₹5.4 Cr |
| 1.05 | Out Souring of Operation and Maintenance of Hogenakkal Water supply and Fluorosis Mitigation Project for Dharmapuri and Krishnagiri Districts for the period From 01.04.2027 to 31.03.2028 - Package II - Second Year | 1 | No | 5,04,64,873 ₹5.0 Cr | 5,49,12,396.4 ₹5.5 Cr |
| 1.06 | Out Souring of Operation and Maintenance of Hogenakkal Water supply and Fluorosis Mitigation Project for Dharmapuri and Krishnagiri Districts for the period From 01.04.2028 to 31.03.2029 - Package II - Third Year | 1 | No | 5,18,07,343 ₹5.2 Cr | 5,53,83,765 ₹5.5 Cr |
| 1.07 | Outsourcing of Operation and Maintenance of Hogenakkal Water supply and Fluorosis Mitigation Project in Dharmapuri and Krishnagiri Districts - Package III for the period From 01.04.2026 to 31.03.2027 - Package - III - First Year | 1 | No | 5,16,45,975 ₹5.2 Cr | 5,32,88,500 ₹5.3 Cr |
| 1.08 | Outsourcing of Operation and Maintenance of Hogenakkal Water supply and Fluorosis Mitigation Project in Dharmapuri and Krishnagiri Districts - Package III for the period From 01.04.2027 to 31.03.2028 - Package - III -Second Year | 1 | No | 5,24,30,725 ₹5.2 Cr | 5,35,58,050 ₹5.4 Cr |
| 1.09 | Outsourcing of Operation and Maintenance of Hogenakkal Water supply and Fluorosis Mitigation Project in Dharmapuri and Krishnagiri Districts - Package III for the period From 01.04.2028 to 31.03.2029 - Package - III - Third Year | 1 | No | 5,32,15,475 ₹5.3 Cr | 5,38,83,050 ₹5.4 Cr |
Updated dates
Tender Value
₹61.3 Cr
EMD Value
₹46.5 L
Closing Date
19 Jan 2026, 3:00 pmClosed
Chief Engineer, Vellore
No.8 First east main road, Gandhi Nagar, Vellore-6
O and M of HWS and FMP Pkg-I to III
2025_TWAD_637369_1
IFB No.23 OandM HWS pag-I toIII
Open Tender
Civil Works
1095 days
Dharmapuri
Refer bid document
4 documents required · 4 mandatory
₹0
₹46.5 L
Vellore
11 Mar 2026
30 Dec 2025
20 Jan 2026
30 Dec 2025
19 Jan 2026
3 Jan 2026
8 Jan 2026
Outsourcing of Operation and Maintenance of Package – I to III under Hogenakkal Water Supply and Fluorosis Mitigation Projectin Dharmapuri & Krishnagiri Districts for a period of 36 months (From 01.04.2026 to 31.03.2029 - 3 Years) - e-submission
Outsourcing of Operation and Maintenance of Intake Works, Raw Water Pumping Station, Treatment Plant, Treated Water Pumping station, Booster Pumping Station, Pumping Mains, Madam Master Balancing Reservoir, Hogenakkal Under Sewerage Scheme and allied works in Package-I under Hogenakkal Water Supply and Fluorosis Mitigation Project for the Period from 01.04.2026 to 31.03.2027 - Package-I - First Year
Outsourcing of Operation and Maintenance of Intake Works, Raw Water Pumping Station, Treatment Plant, Treated Water Pumping station, Booster Pumping Station, Pumping Mains, Madam Master Balancing Reservoir, Hogenakkal Under Sewerage Scheme and allied works in Package-I under Hogenakkal Water Supply and Fluorosis Mitigation Project for the Period from 01.04.2027 to 31.03.2028 - Package - I - Second Year
Outsourcing of Operation and Maintenance of Intake Works, Raw Water Pumping Station, Treatment Plant, Treated Water Pumping station, Booster Pumping Station, Pumping Mains, Madam Master Balancing Reservoir, Hogenakkal Under Sewerage Scheme and allied works in Package-I under Hogenakkal Water Supply and Fluorosis Mitigation Project for the Period from 01.04.2028 to 31.03.2029 - Package - I - Third Year
Out Souring of Operation and Maintenance of Hogenakkal Water supply and Fluorosis Mitigation Project for Dharmapuri and Krishnagiri Districts for the period From 01.04.2026 to 31.03.2027 - Package II - First Year
Out Souring of Operation and Maintenance of Hogenakkal Water supply and Fluorosis Mitigation Project for Dharmapuri and Krishnagiri Districts for the period From 01.04.2027 to 31.03.2028 - Package II - Second Year
Out Souring of Operation and Maintenance of Hogenakkal Water supply and Fluorosis Mitigation Project for Dharmapuri and Krishnagiri Districts for the period From 01.04.2028 to 31.03.2029 - Package II - Third Year
Outsourcing of Operation and Maintenance of Hogenakkal Water supply and Fluorosis Mitigation Project in Dharmapuri and Krishnagiri Districts - Package III for the period From 01.04.2026 to 31.03.2027 - Package - III - First Year
Outsourcing of Operation and Maintenance of Hogenakkal Water supply and Fluorosis Mitigation Project in Dharmapuri and Krishnagiri Districts - Package III for the period From 01.04.2027 to 31.03.2028 - Package - III -Second Year
Outsourcing of Operation and Maintenance of Hogenakkal Water supply and Fluorosis Mitigation Project in Dharmapuri and Krishnagiri Districts - Package III for the period From 01.04.2028 to 31.03.2029 - Package - III - Third Year
Sub Total
Item Rate BoQ
BoQ_Ver4.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE-A1 (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only)
NUMBER #
Outsourcing of Operation and Maintenance of HWS & FMP - Package - I First Year
Outsourcing of Operation and Maintenance of HWS & FM Project - Package I for Providing required quantity of treated water mentioned below by providing necessary Operation and Maintenance of i) Electro Mechanical installations, "equipments" vide volume 2/5 for Package-I, components, pipelines, water meters, valves, Pumpsets, Mechanical, Electrical and ICA Equiupments, Panel Boards, Air Conditioner and appurtenances, water retaining structures including protection of all scheme components from damages / theft including necessary legal actions whenever required for such untoward incidents, ii) Preventive maintenance,
iii) Disinfection and deliverance of water as per quality standards, iv) Carrying out the Operation and Maintenance as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Officers. Including Cost towards ESI and EPF as applicable. Excluding the following i) Cost towards attending leak, burst ii) Repair and replacement works to electro mechanical, ICA installations, iii) Consumables for disinfection of water, iv) Electricity charges, v) BSNL Connectivity charges for SCADA operations at Package-I and 74 remote locations in Packages II, III. IV & V.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
For Providing required quantity of chemicals for water Treatment such as Liquid chlorine (in 900 Kg Cylinder), ALUM (Aluminium sulphate), Starch, Sodium Hydroxide as per IS Specifications and as amended from time to time to produce the following specified quantity of treated water with quality mentioned in IS 10500 /2012 and as amended from time to time. The contractor shall supply to the contractor's storage yard / Site. The cost includes labour charges for loading, transit insurance, conveyance charges, unloading, processing and handling etc., complete and as directed by the TWAD Board officers. Quality of chemicals should be tested for each consignment and cost includes testing charges.
Liquid Chlorine
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Ferric Alum (14.2 to 15.50 % of Aluminium Oxide)
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Starch
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Sodium Hydroxide
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Providing required quantiy of chemicals for sewage Treatment such as Sodium Hypochlorite (Liquid), Di Ammonium Phosphate and Urea as specified TNPCB norms and IS Specifications and as amended from time to time. The contractor shall supply to the contractor's storage yard / Site. The cost includes labour charges for loading, transit insurance, conveyance charges, unloding, processing and handling etc., complete to treat the following specified quantity of Sewage water and as directed by the TWAD Board officers.
Sodium Hypo Chlorite (Liquid)
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Di Ammonium Phosphate
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Outsourcing for repairs and renewals of Electrical, Mechanical and ICA equipments including VT pumpsets, HT squerril cage induction motors, Blowers, EOT cranes and other mechanical components,Surge protection systems , cathotic protection system for M.S pipeline, periodic checkup and preventive maintenance of OFC (Optical Fibre Cable) and joint etc., of Raw water pumping station at Hogenakkal, Treated Water Pumping Station, Water Treatment Plant at Yanaipallam (Bevanur Reserve Forest area), Booster Pumping Station at kanavai (Bevanur Reserve Forest area), Master Balancing Reservior at Madam and UGSS to Hogenakkal Village with Collection system, Lifting station and 0.35 MLD STP of FBBR Technology etc., complete and as directed by the TWAD Board officers.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Outsourcing for periodic checkup and preventive maintenance, conducting Earth value test, testing of Transformer oil and required tests for yearly inspection of Electrical Inspector(CEIG) for HT installations at Intake, Water Treatment Plant and Booster Pumping Station etc., complete and as directed by the TWAD Board officers.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Outsourcing for maintenance UPS, Battery, Stabilizer,PLC Panel,V'SAT & GSM Communications, Routers, Antenna, GSM modem and Adopters,Electro Magnetic Flow meters (127 Nos), Ultrasonic Level Transmitters (128 Nos) and conductivity level switch (64 Nos.) Pressure transmitters (191 Nos) at 74 remote locations in Packages 2, 3, 4 & 5 in Dharmapuri and Krishnagiri Districts, including required repairs and renewals, supply, delivery and fixing of all required spares,Transportation at site etc. loading, unloading, transit insurance, conveyance charges etc., complete and as directed by the TWAD Board officers.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Outsourcing for cleaning and removal of silt and other debries in the leading channel 3 Nos of size 5m X 17m length, and pump well 3Nos of size 5.30 m x 8.50 m by operating stop log gate and penstock gate including painting using anti corrosive paint for mesh provided in the 6 Nos of penstock gate as and when required etc. complete and as directed by the TWAD Board officers.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Outsourcing for Cleaning of 8 Nos. of clarifiers for smooth operation including dewatering, sludge removal, cleaning of trident pipe and fluocon arrangements and removal of silt from wash water recovery tank and sludge balancing tank as and when required etc., complete and as directed by the TWAD Board officers.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Outsourcing for Cleaning of chlorine contact tank (35LL), Treated water reservoir (70LL), Treated water sump cum pump well, Wash water recovery tank, sludge balancing tank at WTP, Inlet sump (35LL) and sump cum pump well at BPS, Master balancing reservoir (240LL) at Madam including dewatering if necessary as and when required and removal of dry sludge from sludge drying beds, loading, conveyance and disposal at dumping site as and when required etc., complete and as directed by the TWAD Board officers.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Outsourcing for removal of Sewage Blockages in pipelines and Manholes using Sewage lorries with compressor arrangement including labour charges, transportation, etc complete as directed by TWAD Board officers
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Supply and delivery of Mechanical Spares, Electrical Spares, ICA Spares, Miscellaneous spares for all equipments / installations in Package-I etc. complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading etc., complete and as directed by TWAD Board officers.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Outsourcing for Operation & maintenance of 62.50KVA Gensets (2 Nos.) at Sewage pumping station and Sewage Treatment plant at Hogenakkal including cost of fuel, lubricants and labour charges for repairs and renewals excluding cost of spares etc, complete and as directed by TWAD Board officers.The running hours should be minimum of 6 hours per month. (2 Nos x 12 months x 6 hours= 144 hours)
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Item Rate BoQ
BoQ_Ver4.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE-A2 (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only)
NUMBER #
Outsourcing of Operation and Maintenance of HWS & FMP - Package - I Second Year
Outsourcing of Operation and Maintenance of HWS & FM Project - Package I for Providing required quantity of treated water mentioned below by providing necessary Operation and Maintenance of i) Electro Mechanical installations, "equipments" vide volume 2/5 for Package-I, components, pipelines, water meters, valves, Pumpsets, Mechanical, Electrical and ICA Equiupments, Panel Boards, Air Conditioner and appurtenances, water retaining structures including protection of all scheme components from damages / theft including necessary legal actions whenever required for such untoward incidents, ii) Preventive maintenance,
iii) Disinfection and deliverance of water as per quality standards, iv) Carrying out the Operation and Maintenance as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Officers. Including Cost towards ESI and EPF as applicable. Excluding the following i) Cost towards attending leak, burst ii) Repair and replacement works to electro mechanical, ICA installations, iii) Consumables for disinfection of water, iv) Electricity charges, v) BSNL Connectivity charges for SCADA operations at Package-I and 74 remote locations in Packages II, III. IV & V.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
For Providing required quantity of chemicals for water Treatment such as Liquid chlorine (in 900 Kg Cylinder), ALUM (Aluminium sulphate), Starch, Sodium Hydroxide as per IS Specifications and as amended from time to time to produce the following specified quantity of treated water with quality mentioned in IS 10500 /2012 and as amended from time to time. The contractor shall supply to the contractor's storage yard / Site. The cost includes labour charges for loading, transit insurance, conveyance charges, unloading, processing and handling etc., complete and as directed by the TWAD Board officers. Quality of chemicals should be tested for each consignment and cost includes testing charges.
Liquid Chlorine
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Ferric Alum (14.2 to 15.50 % of Aluminium Oxide)
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Starch
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Sodium Hydroxide
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Providing required quantiy of chemicals for sewage Treatment such as Sodium Hypochlorite (Liquid), Di Ammonium Phosphate and Urea as specified TNPCB norms and IS Specifications and as amended from time to time. The contractor shall supply to the contractor's storage yard / Site. The cost includes labour charges for loading, transit insurance, conveyance charges, unloding, processing and handling etc., complete to treat the following specified quantity of Sewage water and as directed by the TWAD Board officers.
Sodium Hypo Chlorite (Liquid)
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Di Ammonium Phosphate
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Outsourcing for repairs and renewals of Electrical, Mechanical and ICA equipments including VT pumpsets, HT squerril cage induction motors, Blowers, EOT cranes and other mechanical components,Surge protection systems , cathotic protection system for M.S pipeline, periodic checkup and preventive maintenance of OFC (Optical Fibre Cable) and joint etc., of Raw water pumping station at Hogenakkal, Treated Water Pumping Station, Water Treatment Plant at Yanaipallam (Bevanur Reserve Forest area), Booster Pumping Station at kanavai (Bevanur Reserve Forest area), Master Balancing Reservior at Madam and UGSS to Hogenakkal Village with Collection system, Lifting station and 0.35 MLD STP of FBBR Technology etc., complete and as directed by the TWAD Board officers.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Outsourcing for periodic checkup and preventive maintenance, conducting Earth value test, testing of Transformer oil and required tests for yearly inspection of Electrical Inspector(CEIG) for HT installations at Intake, Water Treatment Plant and Booster Pumping Station etc., complete and as directed by the TWAD Board officers.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Outsourcing for maintenance UPS, Battery, Stabilizer,PLC Panel,V'SAT & GSM Communications, Routers, Antenna, GSM modem and Adopters,Electro Magnetic Flow meters (127 Nos), Ultrasonic Level Transmitters (128 Nos) and conductivity level switch (64 Nos.) Pressure transmitters (191 Nos) at 74 remote locations in Packages 2, 3, 4 & 5 in Dharmapuri and Krishnagiri Districts, including required repairs and renewals, supply, delivery and fixing of all required spares,Transportation at site etc. loading, unloading, transit insurance, conveyance charges etc., complete and as directed by the TWAD Board officers.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Outsourcing for cleaning and removal of silt and other debries in the leading channel 3 Nos of size 5m X 17m length, and pump well 3Nos of size 5.30 m x 8.50 m by operating stop log gate and penstock gate including painting using anti corrosive paint for mesh provided in the 6 Nos of penstock gate as and when required etc. complete and as directed by the TWAD Board officers.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Outsourcing for Cleaning of 8 Nos. of clarifiers for smooth operation including dewatering, sludge removal, cleaning of trident pipe and fluocon arrangements and removal of silt from wash water recovery tank and sludge balancing tank as and when required etc., complete and as directed by the TWAD Board officers.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Outsourcing for Cleaning of chlorine contact tank (35LL), Treated water reservoir (70LL), Treated water sump cum pump well, Wash water recovery tank, sludge balancing tank at WTP, Inlet sump (35LL) and sump cum pump well at BPS, Master balancing reservoir (240LL) at Madam including dewatering if necessary as and when required and removal of dry sludge from sludge drying beds, loading, conveyance and disposal at dumping site as and when required etc., complete and as directed by the TWAD Board officers.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Outsourcing for removal of Sewage Blockages in pipelines and Manholes using Sewage lorries with compressor arrangement including labour charges, transportation, etc complete as directed by TWAD Board officers
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Supply and delivery of Mechanical Spares, Electrical Spares, ICA Spares, Miscellaneous spares for all equipments / installations in Package-I etc. complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading etc., complete and as directed by TWAD Board officers.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Outsourcing for Operation & maintenance of 62.50KVA Gensets (2 Nos.) at Sewage pumping station and Sewage Treatment plant at Hogenakkal including cost of fuel, lubricants and labour charges for repairs and renewals excluding cost of spares etc, complete and as directed by TWAD Board officers.The running hours should be minimum of 6 hours per month. (2 Nos x 12 months x 6 hours= 144 hours)
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Item Rate BoQ
BoQ_Ver4.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE-A3 (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only)
NUMBER #
Outsourcing of Operation and Maintenance of HWS & FMP - Package - I Third Year
Outsourcing of Operation and Maintenance of HWS & FM Project - Package I for Providing required quantity of treated water mentioned below by providing necessary Operation and Maintenance of i) Electro Mechanical installations, "equipments" vide volume 2/5 for Package-I, components, pipelines, water meters, valves, Pumpsets, Mechanical, Electrical and ICA Equiupments, Panel Boards, Air Conditioner and appurtenances, water retaining structures including protection of all scheme components from damages / theft including necessary legal actions whenever required for such untoward incidents, ii) Preventive maintenance,
iii) Disinfection and deliverance of water as per quality standards, iv) Carrying out the Operation and Maintenance as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Officers. Including Cost towards ESI and EPF as applicable. Excluding the following i) Cost towards attending leak, burst ii) Repair and replacement works to electro mechanical, ICA installations, iii) Consumables for disinfection of water, iv) Electricity charges, v) BSNL Connectivity charges for SCADA operations at Package-I and 74 remote locations in Packages II, III. IV & V.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
For Providing required quantity of chemicals for water Treatment such as Liquid chlorine (in 900 Kg Cylinder), ALUM (Aluminium sulphate), Starch, Sodium Hydroxide as per IS Specifications and as amended from time to time to produce the following specified quantity of treated water with quality mentioned in IS 10500 /2012 and as amended from time to time. The contractor shall supply to the contractor's storage yard / Site. The cost includes labour charges for loading, transit insurance, conveyance charges, unloading, processing and handling etc., complete and as directed by the TWAD Board officers. Quality of chemicals should be tested for each consignment and cost includes testing charges.
Liquid Chlorine
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Ferric Alum (14.2 to 15.50 % of Aluminium Oxide)
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Starch
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Sodium Hydroxide
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Providing required quantiy of chemicals for sewage Treatment such as Sodium Hypochlorite (Liquid), Di Ammonium Phosphate and Urea as specified TNPCB norms and IS Specifications and as amended from time to time. The contractor shall supply to the contractor's storage yard / Site. The cost includes labour charges for loading, transit insurance, conveyance charges, unloding, processing and handling etc., complete to treat the following specified quantity of Sewage water and as directed by the TWAD Board officers.
Sodium Hypo Chlorite (Liquid)
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Di Ammonium Phosphate
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Outsourcing for repairs and renewals of Electrical, Mechanical and ICA equipments including VT pumpsets, HT squerril cage induction motors, Blowers, EOT cranes and other mechanical components,Surge protection systems , cathotic protection system for M.S pipeline, periodic checkup and preventive maintenance of OFC (Optical Fibre Cable) and joint etc., of Raw water pumping station at Hogenakkal, Treated Water Pumping Station, Water Treatment Plant at Yanaipallam (Bevanur Reserve Forest area), Booster Pumping Station at kanavai (Bevanur Reserve Forest area), Master Balancing Reservior at Madam and UGSS to Hogenakkal Village with Collection system, Lifting station and 0.35 MLD STP of FBBR Technology etc., complete and as directed by the TWAD Board officers.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Outsourcing for periodic checkup and preventive maintenance, conducting Earth value test, testing of Transformer oil and required tests for yearly inspection of Electrical Inspector(CEIG) for HT installations at Intake, Water Treatment Plant and Booster Pumping Station etc., complete and as directed by the TWAD Board officers.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Outsourcing for maintenance UPS, Battery, Stabilizer,PLC Panel,V'SAT & GSM Communications, Routers, Antenna, GSM modem and Adopters,Electro Magnetic Flow meters (127 Nos), Ultrasonic Level Transmitters (128 Nos) and conductivity level switch (64 Nos.) Pressure transmitters (191 Nos) at 74 remote locations in Packages 2, 3, 4 & 5 in Dharmapuri and Krishnagiri Districts, including required repairs and renewals, supply, delivery and fixing of all required spares,Transportation at site etc. loading, unloading, transit insurance, conveyance charges etc., complete and as directed by the TWAD Board officers.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Outsourcing for cleaning and removal of silt and other debries in the leading channel 3 Nos of size 5m X 17m length, and pump well 3Nos of size 5.30 m x 8.50 m by operating stop log gate and penstock gate including painting using anti corrosive paint for mesh provided in the 6 Nos of penstock gate as and when required etc. complete and as directed by the TWAD Board officers.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Outsourcing for Cleaning of 8 Nos. of clarifiers for smooth operation including dewatering, sludge removal, cleaning of trident pipe and fluocon arrangements and removal of silt from wash water recovery tank and sludge balancing tank as and when required etc., complete and as directed by the TWAD Board officers.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Outsourcing for Cleaning of chlorine contact tank (35LL), Treated water reservoir (70LL), Treated water sump cum pump well, Wash water recovery tank, sludge balancing tank at WTP, Inlet sump (35LL) and sump cum pump well at BPS, Master balancing reservoir (240LL) at Madam including dewatering if necessary as and when required and removal of dry sludge from sludge drying beds, loading, conveyance and disposal at dumping site as and when required etc., complete and as directed by the TWAD Board officers.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Outsourcing for removal of Sewage Blockages in pipelines and Manholes using Sewage lorries with compressor arrangement including labour charges, transportation, etc complete as directed by TWAD Board officers
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Supply and delivery of Mechanical Spares, Electrical Spares, ICA Spares, Miscellaneous spares for all equipments / installations in Package-I etc. complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading etc., complete and as directed by TWAD Board officers.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Outsourcing for Operation & maintenance of 62.50KVA Gensets (2 Nos.) at Sewage pumping station and Sewage Treatment plant at Hogenakkal including cost of fuel, lubricants and labour charges for repairs and renewals excluding cost of spares etc, complete and as directed by TWAD Board officers.The running hours should be minimum of 6 hours per month. (2 Nos x 12 months x 6 hours= 144 hours)
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Item Rate BoQ
BoQ_Ver4.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE-A4 (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only)
NUMBER #
Operation and Maintenance of HWS & FMP Package - II First Year
Outsourcing of Operation and Maintenance of HWS & FMP- Package-II Supplying designed quantity of water to Package-II beneficiaries from Master Balancing Reservoir (MBR) at Madam (Beneficiaries list in Volume 2/5) including the following I) Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines, water meters, Valves, Pumpsets, Mechanical ,Electrical and ICA Equipments, Panel Boards, Air Conditioner and appurtenances, water retaining structures including protection of all scheme components etc. II) Preventive maintenance. III) Disinfection and delivery of water as per quality standards
IV) Periodical cleaning of water retaining structures once in two months or whenever necessary. Including cost towards ESI & EPF as applicable. Excluding the following i) Cost attending pipeline leaks and bursts. ii) Cost of repair and replacement works to Electro Mechanical, ICA installations. iii) Consumables for disinfection of water and iv) Electricity charges.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Supply and delivery of Liquid Chlorine
Supply and delivery of required liquid Chlorine (in 100 kg cylinder) as per IS specification and as amended from time to time. The contractor shall supply to the contractor's storage yard / site. The cost includes labour charges for loading, transit insurance, conveyance charges, unloading, processing and handling etc., complete and as directed by TWAD Board officers. Note: Additional quantity should be pumped as per the instructions of the Engineer, if any required.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Repair and Renewal of Pumpsets
Charges for rewinding the OW submersible pumpsets with first class insulation wire(with minimum one year Guarantee) including removal of burnt coil, servicing the motor, replacing of bush, bearings, shaft etc., replacing of worn out parts, reconditioning of rotor etc., including removal and re erection of pumpsets, testing, commissioning, conveyance charges etc., complete and as directed by TWAD Board officers.
Open well submersible pump sets
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Upto 3.00 HP
Above 3.00 HP and Upto 5.00 HP
Above 5.00 HP and Upto 7.5 HP
Above 7.5 HP and Upto 10.00 HP
Charges for dismantling the motor threading out the rotor from the stator core pack, stripping out the old winding, rewinding the stator using dual coated polymide enameled special made copper wire with F style insulation, preheatening, vaccum impregnating the winding with Domisol resin, baking in oven, applying finishing varnishes for the overhang portions including assembling and conducting no load trial run at rated voltage including the cost of winding materials required after deducting the cost of copper scrap, including removal and re-erection of pumpsets, testing, commissioning, conveyance charges etc., complete and as directed by TWAD Board officers.
HSC Pump Sets
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
above 10.00 HP and up to 20.00 HP
Above 20.00 HP and upto 40.00 HP
Above 50.00 HP and upto 100.00 HP
Operation and Maintenance of Gensets
Outsourcing to operation & maintenance of 30KVA Gensets (11 Nos.) at rechlorination stations including cost of fuel, lubricants and labour charges for repairs and renewals excluding cost of spares etc, complete and as directed by TWAD Board officers. The running hours will be taken into account only if the duration exceeds 6 hours per month (11stations x12months x6 hr/month)
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Outsourcing to operation & maintenance of 20KVA Gensets at Project Office campus including cost of fuel, lubricants and labour charges for repairs and renewals excluding cost of spares etc., complete and as directed by TWAD Board officers. The running hours will be taken into account only if the duration exceeds 26 hours per month. (1stations x12months x26 hr/month)
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Leak and Burst rectification works in HDPE,DI pipes and MS pipes
Outsourcing to attending leaks and bursts in HDPE pipes of various sizes including earth work excavation in all type of strata, cost of de-watering from the trenches, removal of leak/burst pipe, lowering the new pipe of respective class, jointing with SS Clamps / butt fusion welding wherever necessary and refilling the trench after attending the leaks/bursts etc., complete excluding cost of pipes and specials within the time frame as specified in the Special conditions of Contract and as directed by TWAD Board officers.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
63 mm HDPE Pipe
75 mm HDPE Pipe
90 mm HDPE Pipe
110 mm HDPE Pipe
140 mm HDPE Pipe
160 mm HDPE Pipe
200 mm HDPE Pipe
225 mm HDPE Pipe
250 mm HDPE Pipe
280 mm HDPE Pipe
315 mm HDPE Pipe
Attending leaks and bursts in DI pipes and OPVC Pipes of various sizes including earth work excavation in all type of strata, cost of de-watering from the trenches, removal of leak/burst pipe, lowering the new pipe of respective class, jointing with rubber gaskets / Mechanical Joints /SS Clamp wherever necessary and refilling the trench after attending the leaks/bursts etc., complete excluding cost of pipes and specials within the time frame as specified in the Special conditions of Contract and as directed by TWAD Board officers.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
100 mm DI pipe
150 mm DI pipe
200 mm DI Pipe
200 mm OPVC Pipe
250 mm DI Pipe
350 mm DI Pipe
400 mm DI Pipe
450 mm DI Pipe
500 mm DI Pipe
Attending leak & burst in MS Pipes including earth work excavation, Dewatering, hire charges for Gensets, hire charges for Welding machine Including Labour charges for Operating the equipment’s and fuel charges, grinding etc., Refilling Without road restoration etc, and as directed by TWAD Board Officers.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
1000 mm MS pipe
600 mm MS pipe
Siupply and delivery of MS Plate of 6mm Thickness in required dimension as directed by the TWAD Board officials.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Road restoration charges by earthwork and providing PCC 1:4:8 with 20 mm HBG metal as directed by TWAD Board Officials wherever required after attending leak and burst
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Supply and Delivery of DI pipes and HDPE pipes
Supply and delivery of the following sizes and class of HDPE pipes - PE 100 conforming to IS 4984/2016 and as amended from time to time(QAP to be approved by the engineer suitable for the existing quality of pipe) in standard lengths. The contractor shall supply the pipes to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading, etc., complete and as directed by TWAD Board officers for attending leaks and bursts in the pipeline.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
63mm HDPE PN6 pipe
63mm HDPE PN8 pipe
63mm HDPE PN10 pipe
75mm HDPE PN6 pipe
90mm HDPE PN6 pipe
110mm HDPE PN6 pipe
140mm HDPE PN6 pipe
160mm HDPE PN6 pipe
200mm HDPE PN6 pipe
225mm HDPE PN6 pipe
250mm HDPE PN6 pipe
280mm HDPE PN6 pipe
315mm HDPE PN6 pipe
Supply and delivery of the following Ductile iron S/S pipes conforming to IS 8329/2000 and as amended from time to time with ISI marking(QAP to be approved by the engineer, suitable for the existing quality of pipe) suitable for water supply main. The contractor shall supply the pipes to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading, etc., complete and as directed by TWAD Board officers for attending leaks and bursts in the pipeline
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
100mm DI K9 pipe
150mm DI K9 pipe
200mm DI K9 pipe
250mm DI K9 pipe
350mm DI K9 pipe
450mm DI K9 pipe
500mm DI K9 pipe
100mm DI K7 pipe
150mm DI K7 pipe
200mm DI K7 pipe
250mm DI K7 pipe
500mm DI K7 pipe
Supply and delivery of the following sizes and class of OPVC pipes - 10 KSC conforming toIS 4985 /2000 and as amended from time to time(QAP to be approved by the engineer suitable for the existing quality of pipe) in standard lengths. The contractor shall supply the pipes to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading, etc., complete and as directed by TWAD Board officers for attending leaks and bursts in the pipeline.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
200 mm OPVC 10KSC
Supply, delivery and fixing of Mechanical Spares
Supply and delivery of Mechanical Spares for all mechanical equipments/installations etc., complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Supply, delivery and fixing of Electrical Spares
Supply and delivery of Electrical Spares for all electrical equipments/installations etc., complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Supply, delivery and fixing of ICA Spares
Supply and delivery of ICA Spares for all ICAequipments/installations etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Supply, delivery and fixing of Pipe line appurtenances spares
Supply and delivery of Pipe line appurtenances spares for all types of pipes of various sizes etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Supply, delivery and fixing of Miscellaneous Spares for all Building and pumping stations/ rechlorination building/SCADA room
Supply and delivery of Miscellaneous Spares for all Building and pumping stations / rechlorination buiding /SCADA room etc., complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Item Rate BoQ
BoQ_Ver4.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE-A5 (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only)
NUMBER #
Operation and Maintenance of HWS & FMP Package - II Second Year
Outsourcing of Operation and Maintenance of HWS & FMP- Package-II Supplying designed quantity of water to Package-II beneficiaries from Master Balancing Reservoir (MBR) at Madam (Beneficiaries list in Volume 2/5) including the following I) Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines, water meters, Valves, Pumpsets, Mechanical ,Electrical and ICA Equipments, Panel Boards, Air Conditioner and appurtenances, water retaining structures including protection of all scheme components etc. II) Preventive maintenance. III) Disinfection and delivery of water as per quality standards
IV) Periodical cleaning of water retaining structures once in two months or whenever necessary. Including cost towards ESI & EPF as applicable. Excluding the following i) Cost attending pipeline leaks and bursts. ii) Cost of repair and replacement works to Electro Mechanical, ICA installations. iii) Consumables for disinfection of water and iv) Electricity charges.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Supply and delivery of Liquid Chlorine
Supply and delivery of required liquid Chlorine (in 100 kg cylinder) as per IS specification and as amended from time to time. The contractor shall supply to the contractor's storage yard / site. The cost includes labour charges for loading, transit insurance, conveyance charges, unloading, processing and handling etc., complete and as directed by TWAD Board officers. Note: Additional quantity should be pumped as per the instructions of the Engineer, if any required.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Repair and Renewal of Pumpsets
Charges for rewinding the HSC and OW submersible pumpsets with first class insulation wire(with minimum one year Guarantee) including removal of burnt coil, servicing the motor, replacing of bush, bearings, shaft etc., replacing of worn out parts, reconditioning of rotor etc., including removal and re erection of pumpsets, testing, commissioning, conveyance charges etc., complete and as directed by TWAD Board officers.
Open well submersible pump sets
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Upto 3.00 HP
above 3.00 HP up to 5.00 HP
above 5.00 HP to 7.50 HP
above 7.50 HP up to10.00 HP
Charges for dismantling the motor threading out the rotor from the stator core pack, stripping out the old winding, rewinding the stator using dual coated polymide enameled special made copper wire with F style insulation, preheatening, vaccum impregnating the winding with Domisol resin, baking in oven, applying finishing varnishes for the overhang portions including assembling and conducting no load trial run at rated voltage including the cost of winding materials required after deducting the cost of copper scrap, including removal and re-erection of pumpsets, testing, commissioning, conveyance charges etc., complete and as directed by TWAD Board officers.
HSC Pump sets
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
above 10.00 HP and up to 20.00 HP
Above 20.00 HP and upto 40.00 HP
Above 50.00 HP and upto 100.00 HP
Operation and Maintenance of Gensets
Outsourcing to operation & maintenance of 30KVA Gensets (11 Nos.) at rechlorination stations including cost of fuel, lubricants and labour charges for repairs and renewals excluding cost of spares etc, complete and as directed by TWAD Board officers. The running hours will be taken into account only if the duration exceeds 6 hours per month (11stations x12months x6 hr/month)
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Outsourcing to operation & maintenance of 20KVA Gensets at Project Office campus including cost of fuel, lubricants and labour charges for repairs and renewals excluding cost of spares etc., complete and as directed by TWAD Board officers. The running hours will be taken into account only if the duration exceeds 26 hours per month. (1stations x12months x26 hr/month)
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Leak and Burst rectification works in HDPE,DI pipes and MS pipes
Outsourcing to attending leaks and bursts in HDPE pipes of various sizes including earth work excavation in all type of strata, cost of de-watering from the trenches, removal of leak/burst pipe, lowering the new pipe of respective class, jointing with SS Clamps / butt fusion welding wherever necessary and refilling the trench after attending the leaks/bursts etc., complete excluding cost of pipes and specials within the time frame as specified in the Special conditions of Contract and as directed by TWAD Board officers.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
63 mm HDPE Pipe
75 mm HDPE Pipe
90 mm HDPE Pipe
110 mm HDPE Pipe
140 mm HDPE Pipe
160 mm HDPE Pipe
200 mm HDPE Pipe
225 mm HDPE Pipe
250 mm HDPE Pipe
280 mm HDPE Pipe
315 mm HDPE Pipe
Attending leaks and bursts in DI pipes and OPVC Pipes of various sizes including earth work excavation in all type of strata, cost of de-watering from the trenches, removal of leak/burst pipe, lowering the new pipe of respective class, jointing with rubber gaskets / Mechanical Joints /SS Clamp wherever necessary and refilling the trench after attending the leaks/bursts etc., complete excluding cost of pipes and specials within the time frame as specified in the Special conditions of Contract and as directed by TWAD Board officers.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
100 mm DI pipe
150 mm DI pipe
200 mm DI Pipe
200 mm OPVC Pipe
250 mm DI Pipe
350 mm DI Pipe
400 mm DI Pipe
450 mm DI Pipe
500 mm DI Pipe
Attending leak & burst in MS Pipes including earth work excavation, Dewatering, hire charges for Gensets, hire charges for Welding machine Including Labour charges for Operating the equipment’s and fuel charges, grinding etc., Refilling Without road restoration etc, and as directed by TWAD Board Officers.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
1000 mm MS pipe
600 mm MS pipe
Siupply and delivery of MS Plate of 6mm Thickness in required dimension as directed by the TWAD Board officials.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Road restoration charges by earthwork and providing PCC 1:4:8 with 20 mm HBG metal as directed by TWAD Board Officials wherever required after attending leak and burst
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Supply and Delivery of DI pipes and HDPE pipes
Supply and delivery of the following sizes and class of HDPE pipes - PE 100 conforming to IS 4984/2016 and as amended from time to time(QAP to be approved by the engineer suitable for the existing quality of pipe) in standard lengths. The contractor shall supply the pipes to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading, etc., complete and as directed by TWAD Board officers for attending leaks and bursts in the pipeline.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
63mm HDPE PN6 pipe
63mm HDPE PN8 pipe
63mm HDPE PN10 pipe
75mm HDPE PN6 pipe
90mm HDPE PN6 pipe
110mm HDPE PN6 pipe
140mm HDPE PN6 pipe
160mm HDPE PN6 pipe
200mm HDPE PN6 pipe
225mm HDPE PN6 pipe
250mm HDPE PN6 pipe
280mm HDPE PN6 pipe
315mm HDPE PN6 pipe
Supply and delivery of the following Ductile iron S/S pipes conforming to IS 8329/2000 and as amended from time to time with ISI marking(QAP to be approved by the engineer, suitable for the existing quality of pipe) suitable for water supply main. The contractor shall supply the pipes to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading, etc., complete and as directed by TWAD Board officers for attending leaks and bursts in the pipeline
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
100mm DI K9 pipe
150mm DI K9 pipe
200mm DI K9 pipe
250mm DI K9 pipe
350mm DI K9 pipe
450mm DI K9 pipe
500mm DI K9 pipe
100mm DI K7 pipe
150mm DI K7 pipe
200mm DI K7 pipe
250mm DI K7 pipe
500mm DI K7 pipe
Supply and delivery of the following sizes and class of OPVC pipes - 10 KSC conforming toIS 4985 /2000 and as amended from time to time(QAP to be approved by the engineer suitable for the existing quality of pipe) in standard lengths. The contractor shall supply the pipes to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading, etc., complete and as directed by TWAD Board officers for attending leaks and bursts in the pipeline.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
200 mm OPVC 10KSC
Supply, delivery and fixing of Mechanical Spares
Supply and delivery of Mechanical Spares for all mechanical equipments/installations etc., complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Supply, delivery and fixing of Electrical Spares
Supply and delivery of Electrical Spares for all electrical equipments/installations etc., complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Supply, delivery and fixing of ICA Spares
Supply and delivery of ICA Spares for all ICAequipments/installations etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Supply, delivery and fixing of Pipe line appurtenances spares
Supply and delivery of Pipe line appurtenances spares for all types of pipes of various sizes etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Supply, delivery and fixing of Miscellaneous Spares for all Building and pumping stations/rechlorination building/SCADA room
Supply and delivery of Miscellaneous Spares for all Building and pumping stations / rechlorination buiding /SCADA room etc., complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Item Rate BoQ
BoQ_Ver4.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE-A6 (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only)
NUMBER #
Operation and Maintenance of HWS & FMP Package - II Third Year
Outsourcing of Operation and Maintenance of HWS & FMP- Package-II Supplying designed quantity of water to Package-II beneficiaries from Master Balancing Reservoir (MBR) at Madam (Beneficiaries list in Volume 2/5) including the following I) Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines, water meters, Valves, Pumpsets, Mechanical ,Electrical and ICA Equipments, Panel Boards, Air Conditioner and appurtenances, water retaining structures including protection of all scheme components etc. II) Preventive maintenance. III) Disinfection and delivery of water as per quality standards
IV) Periodical cleaning of water retaining structures once in two months or whenever necessary. Including cost towards ESI & EPF as applicable. Excluding the following i) Cost attending pipeline leaks and bursts. ii) Cost of repair and replacement works to Electro Mechanical, ICA installations. iii) Consumables for disinfection of water and iv) Electricity charges.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Supply and delivery of Liquid Chlorine
Supply and delivery of required liquid Chlorine (in 100 kg cylinder) as per IS specification and as amended from time to time. The contractor shall supply to the contractor's storage yard / site. The cost includes labour charges for loading, transit insurance, conveyance charges, unloading, processing and handling etc., complete and as directed by TWAD Board officers. Note: Additional quantity should be pumped as per the instructions of the Engineer, if any required.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Repair and Renewal of Pumpsets
Charges for rewinding the HSC and OW submersible pumpsets with first class insulation wire(with minimum one year Guarantee) including removal of burnt coil, servicing the motor, replacing of bush, bearings, shaft etc., replacing of worn out parts, reconditioning of rotor etc., including removal and re erection of pumpsets, testing, commissioning, conveyance charges etc., complete and as directed by TWAD Board officers.
Open well submersible pump sets
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Upto 3.00 HP
above 3.00 HP up to 5.00 HP
above 5.00 HP to 7.50 HP
above 7.50 HP up to10.00 HP
Charges for dismantling the motor threading out the rotor from the stator core pack, stripping out the old winding, rewinding the stator using dual coated polymide enameled special made copper wire with F style insulation, preheatening, vaccum impregnating the winding with Domisol resin, baking in oven, applying finishing varnishes for the overhang portions including assembling and conducting no load trial run at rated voltage including the cost of winding materials required after deducting the cost of copper scrap, including removal and re-erection of pumpsets, testing, commissioning, conveyance charges etc., complete and as directed by TWAD Board officers.
HSC Pump Sets
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
above 10.00 HP and up to 20.00 HP
Above 20.00 HP and upto 40.00 HP
Above 50.00 HP and upto 100.00 HP
Operation and Maintenance of Gensets
Outsourcing to operation & maintenance of 30KVA Gensets (11 Nos.) at rechlorination stations including cost of fuel, lubricants and labour charges for repairs and renewals excluding cost of spares etc, complete and as directed by TWAD Board officers. The running hours will be taken into account only if the duration exceeds 6 hours per month (11stations x12months x6 hr/month)
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Outsourcing to operation & maintenance of 20KVA Gensets at Project Office campus including cost of fuel, lubricants and labour charges for repairs and renewals excluding cost of spares etc., complete and as directed by TWAD Board officers. The running hours will be taken into account only if the duration exceeds 26 hours per month. (1stations x12months x26 hr/month)
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Leak and Burst rectification works in HDPE,DI pipes and MS pipes
Outsourcing to attending leaks and bursts in HDPE pipes of various sizes including earth work excavation in all type of strata, cost of de-watering from the trenches, removal of leak/burst pipe, lowering the new pipe of respective class, jointing with SS Clamps / butt fusion welding wherever necessary and refilling the trench after attending the leaks/bursts etc., complete excluding cost of pipes and specials within the time frame as specified in the Special conditions of Contract and as directed by TWAD Board officers.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
63 mm HDPE Pipe
75 mm HDPE Pipe
90 mm HDPE Pipe
110 mm HDPE Pipe
140 mm HDPE Pipe
160 mm HDPE Pipe
200 mm HDPE Pipe
225 mm HDPE Pipe
250 mm HDPE Pipe
280 mm HDPE Pipe
315 mm HDPE Pipe
Attending leaks and bursts in DI pipes and OPVC Pipes of various sizes including earth work excavation in all type of strata, cost of de-watering from the trenches, removal of leak/burst pipe, lowering the new pipe of respective class, jointing with rubber gaskets / Mechanical Joints /SS Clamp wherever necessary and refilling the trench after attending the leaks/bursts etc., complete excluding cost of pipes and specials within the time frame as specified in the Special conditions of Contract and as directed by TWAD Board officers.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
100 mm DI pipe
150 mm DI pipe
200 mm DI Pipe
200 mm OPVC Pipe
250 mm DI Pipe
350 mm DI Pipe
400 mm DI Pipe
450 mm DI Pipe
500 mm DI Pipe
Attending leak & burst in MS Pipes including earth work excavation, Dewatering, hire charges for Gensets, hire charges for Welding machine Including Labour charges for Operating the equipment’s and fuel charges, grinding etc., Refilling Without road restoration etc, and as directed by TWAD Board Officers.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
1000 mm MS pipe
600 mm MS pipe
Siupply and delivery of MS Plate of 6mm Thickness in required dimension as directed by the TWAD Board officials.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Road restoration charges by earthwork and providing PCC 1:4:8 with 20 mm HBG metal as directed by TWAD Board Officials wherever required after attending leak and burst
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Supply and Delivery of DI pipes and HDPE pipes
Supply and delivery of the following sizes and class of HDPE pipes - PE 100 conforming to IS 4984/2016 and as amended from time to time(QAP to be approved by the engineer suitable for the existing quality of pipe) in standard lengths. The contractor shall supply the pipes to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading, etc., complete and as directed by TWAD Board officers for attending leaks and bursts in the pipeline.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
63mm HDPE PN6 pipe
63mm HDPE PN8 pipe
63mm HDPE PN10 pipe
75mm HDPE PN6 pipe
90mm HDPE PN6 pipe
110mm HDPE PN6 pipe
140mm HDPE PN6 pipe
160mm HDPE PN6 pipe
200mm HDPE PN6 pipe
225mm HDPE PN6 pipe
250mm HDPE PN6 pipe
280mm HDPE PN6 pipe
315mm HDPE PN6 pipe
Supply and delivery of the following Ductile iron S/S pipes conforming to IS 8329/2000 and as amended from time to time with ISI marking(QAP to be approved by the engineer, suitable for the existing quality of pipe) suitable for water supply main. The contractor shall supply the pipes to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading, etc., complete and as directed by TWAD Board officers for attending leaks and bursts in the pipeline
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
100mm DI K9 pipe
150mm DI K9 pipe
200mm DI K9 pipe
250mm DI K9 pipe
350mm DI K9 pipe
450mm DI K9 pipe
500mm DI K9 pipe
100mm DI K7 pipe
150mm DI K7 pipe
200mm DI K7 pipe
250mm DI K7 pipe
500mm DI K7 pipe
Supply and delivery of the following sizes and class of OPVC pipes - 10 KSC conforming toIS 4985 /2000 and as amended from time to time(QAP to be approved by the engineer suitable for the existing quality of pipe) in standard lengths. The contractor shall supply the pipes to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading, etc., complete and as directed by TWAD Board officers for attending leaks and bursts in the pipeline.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
200 mm OPVC 10KSC
Supply, delivery and fixing of Mechanical Spares
Supply and delivery of Mechanical Spares for all mechanical equipments/installations etc., complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Supply, delivery and fixing of Electrical Spares
Supply and delivery of Electrical Spares for all electrical equipments/installations etc., complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Supply, delivery and fixing of ICA Spares
Supply and delivery of ICA Spares for all ICAequipments/installations etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Supply, delivery and fixing of Pipe line appurtenances spares
Supply and delivery of Pipe line appurtenances spares for all types of pipes of various sizes etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Supply, delivery and fixing of Miscellaneous Spares for all Building and pumping stations/rechlorination building/SCADA room
Supply and delivery of Miscellaneous Spares for all Building and pumping stations / rechlorination buiding /SCADA room etc., complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Item Rate BoQ
BoQ_Ver4.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE-A7 (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only)
NUMBER #
Outsourcing of Operation and Maintenance of HWS & FMP Package - III First Year
Outsourcing of Operation and Maintenance of HWS & FMP- Package-III Supplying designed quantity of water to Package-III beneficiaries from Master Balancing Reservoir (MBR) at Madam including the following I) Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines, water meters, Valves, Pumpsets, Mechanical ,Electrical and ICA Equipments, Panel Boards, Air Conditioner and appurtenances, water retaining structures including protection of all scheme components etc. II) Preventive maintenance. III) Disinfection and delivery of water as per quality standards IV) Periodical cleaning of water retaining structures once in two months or whenever necessary V) ESI & EPF for labours Excluding the following i) Cost attending pipeline leaks and bursts. ii) Cost of repair and replacement works to Electro Mechanical, ICA installations. iii) Consumables for disinfection of water and iv) Electricity charges.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Supply and delivery of Liquid Chlorine
Supply and delivery of required liquid Chlorine (in 100 kg cylinder) as per IS specification and as amended from time to time. The contractor shall supply to the contractor's storage yard / site. The cost includes labour charges for loading, transit insurance, conveyance charges, unloading, processing and handling etc., complete and as directed by TWAD Board officers. Note: Additional quantity should be pumped as per the instructions of the Engineer, if any required.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Supply of Spares
Supply, delivery and fixing of Mechanical Spares
Supply and delivery of Mechanical Spares for all mechanical equipments/installations etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Supply, delivery and fixing of Electrical Spares
Supply and delivery of Electrical Spares for all electrical equipments/installations etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Supply, delivery and fixing of ICA Spares
Supply and delivery of ICA Spares for all ICAequipments/installations etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Supply, delivery and fixing of Pipe line appurtenances spares
Supply and delivery of Pipe line appurtenances spares for all types of pipes of various sizes etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
OW Pumpsets
Outsourcing to rewinding the following pumpsets with first class insulation wire (with minimum one year Guarantee) including removal of burnt coil, servicing the motor, replacing of bush, bearings, shaft etc., replacing of worn out parts, reconditioning of rotor etc., including removal and re-erection of pumpsets, testing, commissioning, conveyance charges etc., complete and as directed by TWAD Board officers.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
HSC Pumpsets
Charges for dismantling the motor threading out the rotor from the stator core pack, stripping out the old winding, rewinding the stator using dual coated polymide enameled special made copper wire with F style insulation, preheatening, vaccum impregnating the winding with Domisol resin, baking in oven, applying finishing varnishes for the overhang portions including assembling and conducting no load trial run at rated voltage including the cost of winding materials required after deducting the cost of copper scrap, including removal and re-erection of pumpsets, testing, commissioning, conveyance charges etc., complete and as directed by TWAD Board officers.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Leak and Burst rectification works in HDPE and DI pipes
Outsourcing to attending leaks and bursts in HDPE pipes of various sizes including earth work excavation in all type of strata, cost of de-watering from the trenches, removal of leak/burst pipe, lowering the new pipe of respective class, jointing with SS Clamps / butt fusion welding wherever necessary and refilling the trench after attending the leaks/bursts etc., complete excluding cost of pipes and specials within the time frame as specified in the Special conditions of Contract and as directed by TWAD Board officers.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
63 mm HDPE Pipe
Attending leaks and bursts in DI pipes of various sizes including earth work excavation in all type of strata, cost of de-watering from the trenches, removal of leak/burst pipe, lowering the new pipe of respective class, jointing with rubber gaskets / Mechanical Joints /SS Clamp wherever necessary and refilling the trench after attending the leaks/bursts etc., complete excluding cost of pipes and specials within the time frame as specified in the Special conditions of Contract and as directed by TWAD Board officers.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Attending leak & burst in MS Pipes including earth work excavation, Dewatering, hire charges for Gensets, hire charges for Welding machine Including Labour charges for Operating the equipment’s and fuel charges, grinding etc., Refilling Without road restoration etc, and as directed by TWAD Board Officers.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
700 mm MS Pipe
Supply and Delivery of DI pipes and HDPE pipes
Supply and delivery of the following Ductile iron S/S pipes conforming to IS 8329/2000 and as amended from time to time with ISI marking(QAP to be approved by the engineer, suitable for the existing quality of pipe) suitable for water supply main. The contractor shall supply the pipes to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading, etc., complete and as directed by TWAD Board officers for attending leaks and bursts in the pipeline
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
450mm DI K9 pipe
450mm DI K7 pipe
400mm DI K9 pipe
400mm DI K7 pipe
350mm DI K9 pipe
350mm DI K7 pipe
300mm DI K9 pipe
300mm DI K7 pipe
250mm DI K9 pipe
250 DI K7 pipe
200mm DI K7 pipe
200mm DI K9 pipe
150mm DI K7 pipe
150mm DI K9 pipe
100mm DI K9 pipe
100mm DI K7 pipe
Supply and delivery of the following sizes and class of HDPE pipes - PE 100 conforming to IS 4984/2016 and as amended from time to time(QAP to be approved by the engineer suitable for the existing quality of pipe) in standard lengths. The contractor shall supply the pipes to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading, etc., complete and as directed by TWAD Board officers for attending leaks and bursts in the pipeline.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
315mm HDPE PN6 pipe
280mm HDPE PN6 pipe
250mm HDPE PN6 pipe
225mm HDPE PN6 pipe
200mm HDPE PN6 pipe
180mm HDPE PN6 pipe
160mm HDPE PN6 pipe
160mm HDPE PN8 pipe
140mm HDPE PN8 pipe
140mm HDPE PN6 pipe
110mm HDPE PN6 pipe
110mm HDPE PN8 pipe
90mm HDPE PN6 pipe
90mm HDPE PN8 pipe
75mm HDPE PN8 pipe
75mm HDPE PN6 pipe
63mm HDPE PN6 pipe
63mm HDPE PN8 pipe
63mm HDPE PN10 pipe
Item Rate BoQ
BoQ_Ver4.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE-A8 (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only)
NUMBER #
Outsourcing of Operation and Maintenance of HWS & FMP Package - III Second Year
Outsourcing of Operation and Maintenance of HWS & FMP- Package-III Supplying designed quantity of water to Package-III beneficiaries from Master Balancing Reservoir (MBR) at Madam including the following I) Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines, water meters, Valves, Pumpsets, Mechanical ,Electrical and ICA Equipments, Panel Boards, Air Conditioner and appurtenances, water retaining structures including protection of all scheme components etc. II) Preventive maintenance. III) Disinfection and delivery of water as per quality standards IV) Periodical cleaning of water retaining structures once in two months or whenever necessary V) ESI & EPF for labours Excluding the following i) Cost attending pipeline leaks and bursts. ii) Cost of repair and replacement works to Electro Mechanical, ICA installations. iii) Consumables for disinfection of water and iv) Electricity charges.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Supply and delivery of Liquid Chlorine
Supply and delivery of required liquid Chlorine (in 100 kg cylinder) as per IS specification and as amended from time to time. The contractor shall supply to the contractor's storage yard / site. The cost includes labour charges for loading, transit insurance, conveyance charges, unloading, processing and handling etc., complete and as directed by TWAD Board officers. Note: Additional quantity should be pumped as per the instructions of the Engineer, if any required.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Supply of Spares
Supply, delivery and fixing of Mechanical Spares
Supply and delivery of Mechanical Spares for all mechanical equipments/installations etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Supply, delivery and fixing of Electrical Spares
Supply and delivery of Electrical Spares for all electrical equipments/installations etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Supply, delivery and fixing of ICA Spares
Supply and delivery of ICA Spares for all ICAequipments/installations etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Supply, delivery and fixing of Pipe line appurtenances spares
Supply and delivery of Pipe line appurtenances spares for all types of pipes of various sizes etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
OW Pumpsets
Outsourcing to rewinding the following pumpsets with first class insulation wire (with minimum one year Guarantee) including removal of burnt coil, servicing the motor, replacing of bush, bearings, shaft etc., replacing of worn out parts, reconditioning of rotor etc., including removal and re-erection of pumpsets, testing, commissioning, conveyance charges etc., complete and as directed by TWAD Board officers.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
HSC Pumpsets
Charges for dismantling the motor threading out the rotor from the stator core pack, stripping out the old winding, rewinding the stator using dual coated polymide enameled special made copper wire with F style insulation, preheatening, vaccum impregnating the winding with Domisol resin, baking in oven, applying finishing varnishes for the overhang portions including assembling and conducting no load trial run at rated voltage including the cost of winding materials required after deducting the cost of copper scrap, including removal and re-erection of pumpsets, testing, commissioning, conveyance charges etc., complete and as directed by TWAD Board officers.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Leak and Burst rectification works in HDPE and DI pipes
Outsourcing to attending leaks and bursts in HDPE pipes of various sizes including earth work excavation in all type of strata, cost of de-watering from the trenches, removal of leak/burst pipe, lowering the new pipe of respective class, jointing with SS Clamps / butt fusion welding wherever necessary and refilling the trench after attending the leaks/bursts etc., complete excluding cost of pipes and specials within the time frame as specified in the Special conditions of Contract and as directed by TWAD Board officers.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
63 mm HDPE Pipe
Attending leaks and bursts in DI pipes of various sizes including earth work excavation in all type of strata, cost of de-watering from the trenches, removal of leak/burst pipe, lowering the new pipe of respective class, jointing with rubber gaskets / Mechanical Joints /SS Clamp wherever necessary and refilling the trench after attending the leaks/bursts etc., complete excluding cost of pipes and specials within the time frame as specified in the Special conditions of Contract and as directed by TWAD Board officers.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Attending leak & burst in MS Pipes including earth work excavation, Dewatering, hire charges for Gensets, hire charges for Welding machine Including Labour charges for Operating the equipment’s and fuel charges, grinding etc., Refilling Without road restoration etc, and as directed by TWAD Board Officers.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
700 mm MS Pipe
Supply and Delivery of DI pipes and HDPE pipes
Supply and delivery of the following Ductile iron S/S pipes conforming to IS 8329/2000 and as amended from time to time with ISI marking(QAP to be approved by the engineer, suitable for the existing quality of pipe) suitable for water supply main. The contractor shall supply the pipes to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading, etc., complete and as directed by TWAD Board officers for attending leaks and bursts in the pipeline
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
450mm DI K9 pipe
450mm DI K7 pipe
400mm DI K9 pipe
400mm DI K7 pipe
350mm DI K9 pipe
350mm DI K7 pipe
300mm DI K9 pipe
300mm DI K7 pipe
250mm DI K9 pipe
250 DI K7 pipe
200mm DI K7 pipe
200mm DI K9 pipe
150mm DI K7 pipe
150mm DI K9 pipe
100mm DI K9 pipe
100mm DI K7 pipe
Supply and delivery of the following sizes and class of HDPE pipes - PE 100 conforming to IS 4984/2016 and as amended from time to time(QAP to be approved by the engineer suitable for the existing quality of pipe) in standard lengths. The contractor shall supply the pipes to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading, etc., complete and as directed by TWAD Board officers for attending leaks and bursts in the pipeline.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
315mm HDPE PN6 pipe
280mm HDPE PN6 pipe
250mm HDPE PN6 pipe
225mm HDPE PN6 pipe
200mm HDPE PN6 pipe
180mm HDPE PN6 pipe
160mm HDPE PN6 pipe
160mm HDPE PN8 pipe
140mm HDPE PN8 pipe
140mm HDPE PN6 pipe
110mm HDPE PN6 pipe
110mm HDPE PN8 pipe
90mm HDPE PN6 pipe
90mm HDPE PN8 pipe
75mm HDPE PN8 pipe
75mm HDPE PN6 pipe
63mm HDPE PN6 pipe
63mm HDPE PN8 pipe
63mm HDPE PN10 pipe
Item Rate BoQ
BoQ_Ver4.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE-A9 (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only)
NUMBER #
Outsourcing of Operation and Maintenance of HWS & FMP Package - III Third Year
Outsourcing of Operation and Maintenance of HWS & FMP- Package-III Supplying designed quantity of water to Package-III beneficiaries from Master Balancing Reservoir (MBR) at Madam including the following I) Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines, water meters, Valves, Pumpsets, Mechanical ,Electrical and ICA Equipments, Panel Boards, Air Conditioner and appurtenances, water retaining structures including protection of all scheme components etc. II) Preventive maintenance. III) Disinfection and delivery of water as per quality standards IV) Periodical cleaning of water retaining structures once in two months or whenever necessary V) ESI & EPF for labours Excluding the following i) Cost attending pipeline leaks and bursts. ii) Cost of repair and replacement works to Electro Mechanical, ICA installations. iii) Consumables for disinfection of water and iv) Electricity charges.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Supply and delivery of Liquid Chlorine
Supply and delivery of required liquid Chlorine (in 100 kg cylinder) as per IS specification and as amended from time to time. The contractor shall supply to the contractor's storage yard / site. The cost includes labour charges for loading, transit insurance, conveyance charges, unloading, processing and handling etc., complete and as directed by TWAD Board officers. Note: Additional quantity should be pumped as per the instructions of the Engineer, if any required.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Supply of Spares
Supply, delivery and fixing of Mechanical Spares
Supply and delivery of Mechanical Spares for all mechanical equipments/installations etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Supply, delivery and fixing of Electrical Spares
Supply and delivery of Electrical Spares for all electrical equipments/installations etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Supply, delivery and fixing of ICA Spares
Supply and delivery of ICA Spares for all ICAequipments/installations etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Supply, delivery and fixing of Pipe line appurtenances spares
Supply and delivery of Pipe line appurtenances spares for all types of pipes of various sizes etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
OW Pumpsets
Outsourcing to rewinding the following pumpsets with first class insulation wire (with minimum one year Guarantee) including removal of burnt coil, servicing the motor, replacing of bush, bearings, shaft etc., replacing of worn out parts, reconditioning of rotor etc., including removal and re-erection of pumpsets, testing, commissioning, conveyance charges etc., complete and as directed by TWAD Board officers.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
HSC Pumpsets
Charges for dismantling the motor threading out the rotor from the stator core pack, stripping out the old winding, rewinding the stator using dual coated polymide enameled special made copper wire with F style insulation, preheatening, vaccum impregnating the winding with Domisol resin, baking in oven, applying finishing varnishes for the overhang portions including assembling and conducting no load trial run at rated voltage including the cost of winding materials required after deducting the cost of copper scrap, including removal and re-erection of pumpsets, testing, commissioning, conveyance charges etc., complete and as directed by TWAD Board officers.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Leak and Burst rectification works in HDPE and DI pipes
Outsourcing to attending leaks and bursts in HDPE pipes of various sizes including earth work excavation in all type of strata, cost of de-watering from the trenches, removal of leak/burst pipe, lowering the new pipe of respective class, jointing with SS Clamps / butt fusion welding wherever necessary and refilling the trench after attending the leaks/bursts etc., complete excluding cost of pipes and specials within the time frame as specified in the Special conditions of Contract and as directed by TWAD Board officers.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
63 mm HDPE Pipe
Attending leaks and bursts in DI pipes of various sizes including earth work excavation in all type of strata, cost of de-watering from the trenches, removal of leak/burst pipe, lowering the new pipe of respective class, jointing with rubber gaskets / Mechanical Joints /SS Clamp wherever necessary and refilling the trench after attending the leaks/bursts etc., complete excluding cost of pipes and specials within the time frame as specified in the Special conditions of Contract and as directed by TWAD Board officers.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Attending leak & burst in MS Pipes including earth work excavation, Dewatering, hire charges for Gensets, hire charges for Welding machine Including Labour charges for Operating the equipment’s and fuel charges, grinding etc., Refilling Without road restoration etc, and as directed by TWAD Board Officers.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
700 mm MS Pipe
Supply and Delivery of DI pipes and HDPE pipes
Supply and delivery of the following Ductile iron S/S pipes conforming to IS 8329/2000 and as amended from time to time with ISI marking(QAP to be approved by the engineer, suitable for the existing quality of pipe) suitable for water supply main. The contractor shall supply the pipes to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading, etc., complete and as directed by TWAD Board officers for attending leaks and bursts in the pipeline
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
450mm DI K9 pipe
450mm DI K7 pipe
400mm DI K9 pipe
400mm DI K7 pipe
350mm DI K9 pipe
350mm DI K7 pipe
300mm DI K9 pipe
300mm DI K7 pipe
250mm DI K9 pipe
250 DI K7 pipe
200mm DI K7 pipe
200mm DI K9 pipe
150mm DI K7 pipe
150mm DI K9 pipe
100mm DI K9 pipe
100mm DI K7 pipe
Supply and delivery of the following sizes and class of HDPE pipes - PE 100 conforming to IS 4984/2016 and as amended from time to time(QAP to be approved by the engineer suitable for the existing quality of pipe) in standard lengths. The contractor shall supply the pipes to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading, etc., complete and as directed by TWAD Board officers for attending leaks and bursts in the pipeline.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
315mm HDPE PN6 pipe
280mm HDPE PN6 pipe
250mm HDPE PN6 pipe
225mm HDPE PN6 pipe
200mm HDPE PN6 pipe
180mm HDPE PN6 pipe
160mm HDPE PN6 pipe
160mm HDPE PN8 pipe
140mm HDPE PN8 pipe
140mm HDPE PN6 pipe
110mm HDPE PN6 pipe
110mm HDPE PN8 pipe
90mm HDPE PN6 pipe
90mm HDPE PN8 pipe
75mm HDPE PN8 pipe
75mm HDPE PN6 pipe
63mm HDPE PN6 pipe
63mm HDPE PN8 pipe
63mm HDPE PN10 pipe
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_762828.xls
BOQ • 0.90 MB
hwspkgonetothree.pdf
Tender Documents • 1.69 MB
Download all tender documents and submit your bid