Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
9 Aug 2022, 5:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
se
edc ii fatehabad
o and m
2022_DVVNL_719507_1
T NO 36
Open Tender
Miscellaneous Works
Lump-sum
180 days
fatehabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
dvvnl
₹2,000
5 Sept 2022
4 Aug 2022
10 Aug 2022
4 Aug 2022
9 Aug 2022
4 Aug 2022
Amount
Carriage of following from 132 KV Taj Agra to 33/11 KV Substations through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) 8.5/9/11 Mtr. long PCC Poles.
Carriage of following from 132 KV Taj Agra to 33/11 KV Substations through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70 Kms.) 11 KV X-Arms, weasal conductor, G.I wire,Disc Insulators, Pin insulators, clamps and other required line material, if any.
Replacement of damaged poles of LT Lines by digging of pits and dismantling of all 11KV/LT accessories from the existing / damaged pole and erection of single new pole including fitting all accessories.
Replacement of damaged poles HT Lines by digging of pits and dismantling of all 11KV/33 KV accessories from the existing / damaged pole and erection of single new pole including fitting of all accessories.
Replacement of damaged poles 33 KV Lines by digging of pits and dismantling of all 11KV/33 KV accessories from the existing / damaged pole and erection of single new pole including fitting of all accessories.
Recostructions of damaged Double pole (Saction) on 11 KV Lines by dismantling of T/f, opening of all accessories of LT S/S then removing damaged poles by digging earth pit(s), erecting new poles then fixing of of LT S/S accessories such as Dropper channel, T/F base, Disc Insulators with fitting and other 11 KV accessories etc., required for proper completion of work.
Replacement of damaged Double pole structure on 33 KV Lines dismantling of T/f, opening of all accessories of LT S/S then removing damaged poles by digging earth pit(s), erecting new poles then fixing of of LT S/S accessories such as Dropper channel, T/F base, Disc Insulators with fitting and other 11/33 KV accessories etc., required for proper completion of work.
Erection of stays its tightning, binding, nozelling etc. of stay wire with stay and stay clamp of pole as per requirement of work at site.
Re- sagging and stringing of existing conductor in 11KV/ /LT line as per direction of supervising engineer including the cost of arrangement of labour,T&P, carrier etc. required for proper completion of work A) ACSR Weasel Conductor.
B)ACSR Dog Conductor.
C) 50/95/120 sqmm ABC.
C)50/95/120 sqmm ABC.
laying sagging, binding and jumpering etc of new and old used. following conductor as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work A) ACSR Weasel Conductor.
B)ACSR Dog Conductor.
C)50/95/120 sqmm ABC.
Straightening of tilted single 8.5 Mtr. PCC Polesof existing lines by opening of line conductor, digging earth pit, straightning of pole, filling the earth pit after straightning then relaying the line conductor, as per direction of supervising engineer including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
Replacement of damage STP by Providing Ms angle and other requirement including welding etc.
CHAUHAN ENTERPRISES
M/S RAGHUVIR CONTRACTORS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .