| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | SINGLE₹82,600Accepted-AOC BINA ROAD PARASI P O KAKRI DISTT SONBHADRA UP | SONBHADRA | UP | SINGLE | Accepted-AOC AWARD OF WORK TO SINGLE QUALIFIED BIDDER |
| Sl No | Description | Qty | Unit | CHANDRA MOTOR REWINDING WORKS L1 |
|---|---|---|---|---|
| 1.00Technical Specifications & Scope of Works: Repairing of two nos. ESAB make 40 KVA model-EASY WELD SSR- 600, 415 volt,50 HZ,3 phase,600 Amps welding transformer | ||||
| 2.00 | Labour Charges for Repairing of two nos. ESAB make 40 KVA model-EASY WELD SSR- 600, 415 volt,50 HZ,3 phase,600 Amps welding transformer including contractor profit. . . . | 1 | Job | 8,000 ₹8,000 Lowest |
| 3.00Materials required for above job | ||||
| 3.01 | Cost of Copper Strip enamel(including less copper scrap) | 70 | Kg. | 450 ₹31,500 Lowest |
| 3.02 | Cost of copper strip for glass covering, varnishing etc. | 70 | Kg. | 50 ₹3,500 Lowest |
| 3.03 | Cost of glass paper for layer insulating | 16 | Kg. | 170 ₹2,720 Lowest |
| 3.04 | Cost of Mica Paper | 16 | Kg. | 170 ₹2,720 Lowest |
| 3.05 | Cost of fiber glass sheet 10mm thick x 01 meter long for fixing of jointing of coil | 2 | Sheet | 325 ₹650 Lowest |
| 3.06 | Cost of stud bolts & nut size 3/8" X 1.5 ft. | 16 | Nos. | 145 ₹2,320 Lowest |
| 3.07 | Cost of fiber glass plate for bolting separator size 1.5 ft. | 16 | Job | 50 ₹800 Lowest |
Tender Value
₹1.0 L
EMD Value
₹1,400
Closing Date
8 Aug 2025, 11:00 amClosed
GENERAL MANAGER EXCAVATION, NCL KHADIA PROJECT
NCL KHADIA PROJECT, SHAKTINAGAR, SONEBHADRA, UP, 231222
Repairing of two nos ESAB make 40 KVA model EASY WELD SSR 600 415 volt 50 HZ3 phase 600 Amps welding transformer Sl no EM1103398 and EM1103405 Somnath Dragline of Dragline. Section of Khadia project.
2025_NCL_340024_1
KHD/G.M. (Excv)/E-Tender/25-26/ 465
Open Tender
Excavation Department Work
Item Rate
5 days
NCL KHADIA PROJECT, SHAKTINAGAR
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,400
23 Dec 2025
21 Jul 2025
9 Aug 2025
21 Jul 2025
8 Aug 2025
22 Jul 2025
21 Jul 2025 - 28 Jul 2025
Amount
Technical Specifications & Scope of Works: Repairing of two nos. ESAB make 40 KVA model-EASY WELD SSR- 600, 415 volt,50 HZ,3 phase,600 Amps welding transformer
Labour Charges for Repairing of two nos. ESAB make 40 KVA model-EASY WELD SSR- 600, 415 volt,50 HZ,3 phase,600 Amps welding transformer including contractor profit. . . .
Materials required for above job
Cost of Copper Strip enamel(including less copper scrap)
Cost of copper strip for glass covering, varnishing etc.
Cost of glass paper for layer insulating
Cost of Mica Paper
Cost of fiber glass sheet 10mm thick x 01 meter long for fixing of jointing of coil
Cost of stud bolts & nut size 3/8" X 1.5 ft.
Cost of fiber glass plate for bolting separator size 1.5 ft.
Cost of bobbin glass tape, cotton tape, varnish etc.
Cost of rotary switch
Cost of regulator
Cost of thyristor power module PWB 130A40
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_352492.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .