Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹25.4 LAdmitted-Finance | -23.00% | ₹25.4 L | L1 | Admitted-Finance |
| 2 | L2₹26.0 L+₹57,745.89 (2.27%)Admitted-Finance KALIPAHARI ASANSOL M BURDWAN ASANSOL SOUTH PASCHIM WEST BURDWAN BARDHAMAN PASCHIM WEST BURDWAN BARDHAMAN 713339 WEST BENGAL INDIA | PASCHIM BARDHAMAN | WEST BENGAL | 713339 | -21.25% | ₹26.0 L+₹57,745.89 (2.27%) | L2 | Admitted-Finance |
| 3 | L3₹26.2 L+₹82,164.15 (3.23%)Admitted-Finance ASANSOL BARDHAMAN BARDHAMAN 713336 WEST BENGAL INDIA | ASANSOL | BARDHAMAN | WEST BENGAL | 713336 | -20.51% | ₹26.2 L+₹82,164.15 (3.23%) | L3 | Admitted-Finance |
| 4 | L4₹26.3 L+₹91,733.47 (3.61%)Admitted-Finance | -20.22% | ₹26.3 L+₹91,733.47 (3.61%) | L4 | Admitted-Finance |
| 5 | L5₹28.7 L+₹3.3 L (12.9%)Admitted-Finance HOLDING NO 41 C O MIR AZAM KHAN KHAN RASJID MOHALLA JAMURIA BAZAR MAIN JAMURIA PASCHIM WEST BURDWAN WEST BENGAL INDIA 713336 | JAMURIA | PASCHIM BARDHAMAN | WEST BENGAL | 713336 | -13.09% | ₹28.7 L+₹3.3 L (12.9%) | L5 | Admitted-Finance |
Tender Value
₹38.9 L
EMD Value
₹48,700
Closing Date
11 Aug 2026, 5:00 pmClosed
Area Safety Officer, Satgram-Sripur Area
Office of the General Manager Satgram-Sripur Area P.O-Deochandnagar Dist-Paschim Bardhman West Bengal-713332
Construction of 11 nos of sectionalization stopping to sectionalize the eastern part of R-VI Seam Sripur seam of Bhanora West Block Colliery
2026_ECL_362761_1
SSA/GM/SURV/BWBC/26-27/14 Dated-29.07.2026
Open Tender
Miscellaneous Works
Percentage
270 days
Bhanora West Block Colliery, Satgram-Sripur Area
Please refer Tender documents.
4 documents required · 4 mandatory
₹48,700
28 Aug 2026
31 Jul 2026
13 Aug 2026
1 Aug 2026
11 Aug 2026
1 Aug 2026
31 Jul 2026 - 10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Work Description | |||||
| 1.01 | Labour cost
Recess cutting in side coal | 61.8 | cum | 2,046.6 | ₹1,26,479.88 |
| 1.02 | Recesscutting in floors stone | 12.62 | cum | 7,163.1 | ₹90,362.51 |
| 1.03 | Recess cutting in roof stone | 12.62 | cum | 7,163.1 | ₹90,362.51 |
| 1.04 | Volume of brick work | 261.49 | cum | 4,069.15 | ₹10,64,042.03 |
| 1.05 | Area of cement plaster both side | 348.92 | cum | 532.51 | ₹1,85,803.39 |
| 1.06 | Loading materials at surface | 518 | tub | 231.68 | ₹1,20,010.24 |
| 1.07 | Unloading materials at site | 518 | tub | 231.68 | ₹1,20,010.24 |
| 1.08 | White washing in stopping both side(U/G) | 348.92 | sqm | 66.56 | ₹23,224.12 |
| 1.09 | Materials cost
Brick | 1,01,458 | Nos | 12 | ₹12,17,496 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.67 MB
Tendernotice_2.pdf
PDF • 1.23 MB
BOQ_375665.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .