Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹10 L
Closing Date
4 Sept 2026, 3:00 pm7d left
PROJECTS-REFINERY
Please refer tender document
2600027730-HD-09050
5100027730
Open Tender
Two Bid
Unknown (Unspecified Location)
₹0
₹10 L
13 Aug 2026
13 Aug 2026
4 Sept 2026
4 Sept 2026
13 Aug 2026 - 2 Sept 2026
20 Aug 2026
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | Excavation upto 1.5m | Excavation upto 1.5m — Earthwork excavation below ground level for all typesofsoil (excluding soft and hard rock) forfoundations,trenches, pavements, footings, and alliedworks, up to 1.5m depth, including removal ofvegetation/debris, dressingof sides, leveling, grading,ramming of bottoms,dewatering, keeping surface dry,disposal or stacking ofsurplus excavated material within100 m lead, and providingtemporary support to existingservices such aswater/sewage/electric/underground cables,complete as perdirections (excluding shoring and strutting). | - | cubic meter |
| 2 | Excavation > 1.5m | Excavation > 1.5m — Earthwork excavation below ground level for all typesofsoil (excluding soft and hard rock) forfoundations,trenches, pavements, footings, and alliedworks, up to 3.0m depth, including removal ofvegetation/debris, dressingof sides, leveling, grading,ramming of bottoms,dewatering, keeping surface dry,disposal or stacking ofsurplus excavated material within100 m lead, and providingtemporary support to existingservices such aswater/sewage/electric/underground cables,complete as perdirections (excluding shoring and strutting). | - | cubic meter |
| 3 | Manual Excvtion 0-1.5m | Manual Excvtion 0-1.5m — Manual excavation using insulated tools below groundlevelfor foundations, trenches, pavements, footings, andalliedworks, in all types of soils, for depth up to 1.5m,including all labour, materials, dressing ofsides,leveling, grading, ramming of bottoms, pumping andbailingout of rain or sub-soil water, disposal or stackingofsurplus excavated material within 100 m lead and lift upto1.5m, complete, including trial pits or otherspecificworks as directed by Engineer-in-Charge/HPCL. | - | cubic meter |
| 4 | Manual Excvtion >1.5m | Manual Excvtion >1.5m — Manual excavation using insulated tools below groundlevelfor foundations, trenches, pavements, footings, andalliedworks, in all types of soils, for depth up to 3.0m,including all labour, materials, dressing ofsides,leveling, grading, ramming of bottoms, pumping andbailingout of rain or sub-soil water, disposal or stackingofsurplus excavated material within 100 m lead and lift upto3.0m, complete, including trial pits or otherspecificworks as directed by Engineer-in-Charge/HPCL. | - | cubic meter |
| 5 | Backfilling 0-100M | Backfilling 0-100M — Backfilling/filling with available excavated soilintrenches, plinths, foundations, pits, and allied works,inlayers not exceeding 15 cm thickness,includingre- excavating deposited soil, breaking clods,spreading,watering, manual or mechanical ramming/compactiontoachieve 90% maximum dry density, dressing, andtrimming,with disposal within 100 m lead, complete asperEngineer-in-Charge directions. | - | cubic meter |
| 6 | T/D within 1Km-3km | T/D within 1Km-3km — Transportation of surplus excavated earth, debris, silt,ormud from the work site beyond the initial lead of 100m,including re-excavation of previously depositedmaterial,loading, conveying by tractor trolley/truck,unloading, anddisposal Inside the Refinery premises atlocationsapproved by the Municipal Corporation, includinglevelingand dressing of the area from where material isremoved,complete in all respects as per the directions oftheEngineer-in-Charge. | - | cubic meter |
| 7 | RR Masonary BGL | RR Masonary BGL — Supplying and laying approved brand abrasion-resistant,hardaggregate-based, non-metallic topping material onconcretefloors, as per manufacturer’s recommendations, toachieveheavy-duty wearing surface suitable for allheights. Thework includes surface preparation, mixing,placement,leveling, and finishing to ensure a durable,wear-resistantfloor. All works shall be carried out as perspecificationsand directions of the Engineer-in-Charge(EIC). | - | cubic meter |
| 8 | RR Masonary AGL | RR Masonary AGL — """""""Supplying and providing Random Rubble (RR) masonryinCement Mortar 1:6 (1 cement:6 sand) above groundlevel,including provision of bond stones as perstandardpractice. Work includes leveling with cementconcrete1:6:12 (1 cement:6 coarse sand:12 graded stoneaggregate of20 mm nominal size), curing, scaffolding, andall labor,tools, and equipment as directed bytheEngineer-in-Charge.Portland Slag Cement (IS 455)andBIS-approved cement shall be used. The work shallbeexecuted as per specifications, drawings, and directionsofthe Engineer-in-Charge.""""""" | - | cubic meter |
| 9 | RR MasoanryBGL(HPCL | RR MasoanryBGL(HPCL — """""""Supplying and providing Random Rubble (RR) masonryinCement Mortar 1:6 (1 cement:6 sand) using stonessuppliedby HPCL, including provision of bond stonesavailablewithin refinery and collection/shifting of stonesto thework site from any location within refinery asdirected bythe Engineer-in-Charge.Work includes levelingwith cementconcrete 1:6:12 (1 cement:6 coarse sand:12graded stoneaggregate of 20 mm nominal size), curing,scaffolding, andall labor, tools, and equipment as perstandard practiceand directions of the Engineer-in-Charge.BIS-approvedcement shall be used. Applicable for works upto and belowground level.""""""" | - | cubic meter |
| 10 | RR MasoanryAGL (HPCL | RR MasoanryAGL (HPCL — """""""Supplying and providing Random Rubble (RR) masonryinCement Mortar 1:6 (1 cement:6 sand) above groundlevel,including provision of bond stones as perstandardpractice. Work includes leveling with cementconcrete1:6:12 (1 cement:6 coarse sand:12 graded stoneaggregate of20 mm nominal size), curing, scaffolding, andall labor,tools, and equipment as directed bytheEngineer-in-Charge.Portland Slag Cement (IS 455)andBIS-approved cement shall be used. The work shallbeexecuted as per specifications, drawings, and directionsofthe Engineer-in-Charge.""""""" | - | cubic meter |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2600027730-HD-09050.pdf
TENDER_DOCUMENT • 15.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].