Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.8 LAccepted-AOC | ₹16.8 L | L1 | Accepted-AOC lower the tender rate |
| 2 | L2₹17.2 LRejected-Finance | ₹17.2 L | L2 | Rejected-Finance above the tender rate |
| Sl No | Description | Qty | Unit | P Sampath L1 | VS ANS SONS CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing Light Jungle ( W-0002 Page 27 SOR 2024-25 Volume 1) | 240 | Sqm | 6.44 ₹1,545.60 | 6.44 ₹1,545.60 |
| 2.00 | Providing and laying, spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 180 | Cum | 1,877.78 ₹3.4 L | 2,000 ₹3.6 L |
| 3.00 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev-5 Specifications | 1,440 | Sqm | 74.49 ₹1.1 L | 85 ₹1.2 L |
| 4.00 | Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications | 1,440 | Sqm | 17 ₹24,480 | 20 ₹28,800 |
| 5.00 | Providing and laying 75mm consolidated thick Dense Bituminous Macadam using 0.40cum of 37.50-13.20mm,0.35cum of 13.20-2.36mm and 0.36cum of 2.36mm & below size IRC metal with 71.30kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to the required temperature and mixing the minimum required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 75mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 of MORTH Rev-5 specifications. | 72 | Cum | 9,869.62 ₹7.1 L | 9,900 ₹7.1 L |
| 6.00 | Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with 45.27 kgs of 60/70 bitumen & 5.03Kg of Plastic waste from garbage collected at free of cost (Total-50.30 kg) and for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 40 mm with mechanical paver to the specified grades and cross sections and compaction by 80-100 KN power roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks,paver finisher, power rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 507 of MORTH Rev-5 specifications. | 43.2 | Cum | 10,452 ₹4.5 L | 10,452 ₹4.5 L |
| 7.00 | Providing and laying of hot applied Thermoplastic compound 2.50mm thick including reflectorising glass beads at 250gms per sqm area thickness of 2.5mm exclusive of surface applied glass beads as per IRC.35. The finished surface to be level, uniform and free from streaks and holes. | 50.75 | Sqm | 890 ₹45,167.50 | 890 ₹45,167.50 |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
19 Sept 2025, 3:00 pmClosed
EXECUTIVE OFFICER
THIRUPORUR TOWN PANCHAYAT OFFICE OMR, THIRUPORUR
Providing BT road at Ward No 7 Sowbakkiya Nagar in Thiruporur Town Panchayat Chengalpattu District
2025_DTP_604207_1
335/2025
Open Tender
Civil Works - Roads
THIRUPORUR TOWN PANCHAYAT
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
₹20,000
Yes
17 Jan 2026
15 Sept 2025
19 Sept 2025
15 Sept 2025
19 Sept 2025
15 Sept 2025
Amount
Clearing Light Jungle ( W-0002 Page 27 SOR 2024-25 Volume 1)
Providing and laying, spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev-5 Specifications
Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications
Providing and laying 75mm consolidated thick Dense Bituminous Macadam using 0.40cum of 37.50-13.20mm,0.35cum of 13.20-2.36mm and 0.36cum of 2.36mm & below size IRC metal with 71.30kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to the required temperature and mixing the minimum required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 75mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 of MORTH Rev-5 specifications.
Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with 45.27 kgs of 60/70 bitumen & 5.03Kg of Plastic waste from garbage collected at free of cost (Total-50.30 kg) and for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 40 mm with mechanical paver to the specified grades and cross sections and compaction by 80-100 KN power roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks,paver finisher, power rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 507 of MORTH Rev-5 specifications.
Providing and laying of hot applied Thermoplastic compound 2.50mm thick including reflectorising glass beads at 250gms per sqm area thickness of 2.5mm exclusive of surface applied glass beads as per IRC.35. The finished surface to be level, uniform and free from streaks and holes.
VS ANS SONS CONSTRUCTION (BID ID -1465571)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid