| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹20.2 L+₹98,396.60 (5.11%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Perumal S L2 | J Sankaran L1 |
|---|---|---|---|---|---|
| 1.01Providing MPP @ Sathick nagar in kolathur panchayat | |||||
| 1.02 | Cost of Geophysical Investigation Charges | 1 | m3 | 3,000 ₹3,000 | 2,000 ₹2,000 Lowest |
| 1.03 | Cost of 200mm dia PVC Casing pipe. | 3 | m3 | 2,500 ₹7,500 | 1,113.2 ₹3,339.6 Lowest |
| 1.04 | 200mm dia pvc Slotted pipes | 9 | no | 10,000 ₹90,000 | 1,308.2 ₹11,773.8 Lowest |
| 1.05 | 200mm dia End cap | 1 | no | 190 ₹190 Lowest | 190 ₹190 Lowest |
| 1.06 | Drilling of borewell in Sedimetary area anywhere in Tamilnadu in alluvial soil sedimentary strata of clay and sand stone shale pebbles including by first taking a pilot bore of 140 mm/150mm direct or reverse rotatry mud and circulation method using rotary rig , fuel, labour, drilling, betonite mud and water required for drilling at the site. Site will be shown by the Departmental officers officers icluding construction of mud pit using rotary rig are to be used. up to 60.00 m depth | 12 | m3 | 1,105.5 ₹13,266 Lowest | 1,105.5 ₹13,266 Lowest |
| 1.07 | Labour charges for inserting PVC casing pipes (with slots or without slots) in the drilled hole including jointing the pipes with PVC couplers with cement pasete etc., complete supply and packing the annular space with pebbles of size & quality as approved by the Executive Engineer,Departmental officers Board, 165 mm Casing assembly. | 12 | m2 | 380.6 ₹4,567.2 Lowest | 380.6 ₹4,567.2 Lowest |
| 1.08 | Reaming from 140mm/150mm dia pilot bore to 300mm dia bore as directed by the Departmental officers Board Officers upto 60m depth ending from ground level. | 12 | no | 433.3 ₹5,199.6 Lowest | 433.3 ₹5,199.6 Lowest |
| 1.09 | Charges for developing the borewells with Air compressor of 600 CFM capacityincluding transportation labour and fuel charges for compressor as directed by Departmental officers Board officers and conducting yield test by "V" notch methods | 8 | m3 | 1,937.1 ₹15,496.8 Lowest | 1,937.1 ₹15,496.8 Lowest |
| 1.10 | Cost and supply of 1.5 HP Three phase submersible motor as per IS 8034 without panel board of75 lpm x 125lpm. | 1 | m3 | 28,534 ₹28,534 Lowest | 28,534 ₹28,534 Lowest |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
12 Dec 2025, 3:00 pmClosed
BDO(VP), Merkanam Block.
BDO(VP), Merkanam Block.
Providing Bore Well, Culvert, Drinage 4 Works Kolathur Panchayat
2025_RDTN_629004_1
Merkanam/PMAGY-2025-26
Open Tender
Civil Works
Works
90 days
Block Developent Office, Merkanam.
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹20,000
Yes
14 Jan 2026
4 Dec 2025
12 Dec 2025
4 Dec 2025
12 Dec 2025
4 Dec 2025
Amount
Providing MPP @ Sathick nagar in kolathur panchayat
Cost of Geophysical Investigation Charges
Cost of 200mm dia PVC Casing pipe.
200mm dia pvc Slotted pipes
200mm dia End cap
Drilling of borewell in Sedimetary area anywhere in Tamilnadu in alluvial soil sedimentary strata of clay and sand stone shale pebbles including by first taking a pilot bore of 140 mm/150mm direct or reverse rotatry mud and circulation method using rotary rig , fuel, labour, drilling, betonite mud and water required for drilling at the site. Site will be shown by the Departmental officers officers icluding construction of mud pit using rotary rig are to be used. up to 60.00 m depth
Labour charges for inserting PVC casing pipes (with slots or without slots) in the drilled hole including jointing the pipes with PVC couplers with cement pasete etc., complete supply and packing the annular space with pebbles of size & quality as approved by the Executive Engineer,Departmental officers Board, 165 mm Casing assembly.
Reaming from 140mm/150mm dia pilot bore to 300mm dia bore as directed by the Departmental officers Board Officers upto 60m depth ending from ground level.
Charges for developing the borewells with Air compressor of 600 CFM capacityincluding transportation labour and fuel charges for compressor as directed by Departmental officers Board officers and conducting yield test by "V" notch methods
Cost and supply of 1.5 HP Three phase submersible motor as per IS 8034 without panel board of75 lpm x 125lpm.
Cost and supply of Three phase Panel board with two level guard and auto start as directed by the departmental officers etc, complete
Cost and supply of 2.5sqmm flat type three core copper cable.
Supply and delivery of for HDPE Hose as per TWAD board etc
Erection of pumpset
provision for HDPF 2000litre tank
Provision for pedestal for tank
Provision for Ms Kisok
EB doposit charges
provision pipe line
Provision for name board charges
Provision for photo charges
Construction of Drainage works and horizantal folter @ Singananthal in Kolathur panchayat
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with.
Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1:3:6mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete .
plastering in cement mortar 1:5 12mm thick all metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete .
Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Rectangular / Square, Tee/ Ell beams, Lintels,
horizantal filter
Provision for name board charges
Provision for photo charges
Construction of RCC 1.5M slab culvert @ Singananthal in Kolathur panchayat
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with.
Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1:3:6mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete .
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete .
Supplying and Fabricating and placing in position MS Steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and blinding wire all floors etc., complete complying with standard specification.
Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Rectangular / Square, Tee/ Ell beams, Lintels,
Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Rectangular / Square, Tee/ Ell beams, Lintels,
Rainforcement Cement Concrete 1:1.5:3 using 20 mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabricating charges, centering and shuttering but icluding curing and providing fixtures like fan clamps in the RCC floor or roof s
Provision for name board charges
Provision for photo charges
providing mnew bore well and motor assoreies @ kolathur panchayat
Cost of Geophysical Investigation Charges
Cost of 200mm dia PVC Casing pipe.(CS type)
200mm dia End cap
Labour charges for inseting PVC casing pipe assembly (with slots or without slots) in the drilled hole including jointing the pipes with PVC couplers with cement paste etc
Drilling Of Hard Rock Borewells including Transporation in bore well 200/300 mm dia including Cost and Conveyance Etc
Supply and Delivery ofthree phase submersible motor with 125 lpm x100m head Capacity as per IS 8034 / 2002 specification with ISI mark including Transportation charges etc, Complete.
Supply and Delivery of MS KIOSK of size 0.75 x 0.745 x 0.75 m using 16 guage thick alround cover MS sheet with 50 x 50 x 4 mm steel angles for fixing of meter board,switch board with MS door, lock and key including painting etc, complete.
Supply and Delivery of three phase 5.0 HP Panel board with two level guard and auto start for above pumpset with all accessories as per IE rules with IE Specifications etc, complete.
Supply and Delivery of 6.0 sqmm PVC insulated and PVC shearthed 3 core flat type copper cable confirming to IS 694/1990 with ISI mark.Panel board suitable for above pumpset with all accessories as per IE rules with IE Specifications etc, complete.
Supply and Delivery of HDPE 63 mm dia PN 10
provision for electrical arrengement
labour charges for fixing motor assories
provision for pipe line works
provision for mname board and photo charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Perumal S (BID ID -1531851)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.77 MB
BOQ_752155.xls
BOQ • 0.33 MB
TenderNotice.pdf
Tender Documents • 1.76 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .