Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹9.8 L+₹1.5 L (18.0%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | MANSOOR | MAARS ASSOCIATES |
|---|---|---|---|---|---|
| 1.00 | Dismantling the existing RCC for the required width & depth as per the instructions of engineer in charge including cost of all materials, labours, lead, lift, curing, etc. complete. | 6.25 | M3 | 29,375 ₹34,662.5 Lowest | 31,250 ₹36,875 |
| 2.00 | Supplying & providing RTS rod including cutting, bending, tying & fixing in position as per specification including binding wires, cost of all other materials, labours, lead, lift, curing, etc. complete. | 470.21 | Kg | 44,669.95 ₹52,710.54 Lowest | 51,723.1 ₹61,033.26 |
| 3.00 | Providing HILTI joint arrangements to the rods by drilling holes into the old concrete and new concrete to a required depth and injecting motor HIT - RE 500 @ 0.50ml./mm chemicals, rate including the cost of chemical, drilling arrangements, labour charges ,lead, lift, etc., complete | 24,000 | mm | 2,16,000 ₹2,54,880 Lowest | 2,88,000 ₹3,39,840 |
| 4.00 | Micro Concrete for RCC pedestal with shuttering (75mm Thickness) a) Applying One coat of Nito Zinc/equivalent primer after thorough cleaning of rust in the reinforcement rate including cost of all materials, labour, lead, lift etc., complete as directed by the engineer at site. B) Providing fabricating and erecting slurry tight form work with plywood shutters with suitable supports, which do not deform due to micro concrete including cost of all materials, labours, lead, lift, etc., complete as directed by the engineer at site. C) Providing micro concrete Rendroc RG (or) equivalent as per manufacture's specifications. This mixed micro concrete should be placed continuously for an average thickness of 75mm including cost of all materials, labours, lead, lift, etc., complete as directed by the engineer at site. D) Applying one coat of polymer modified Acrylic Emulsion (Nito bond AR or equivalent) on the finished concrete surfaces as a curing membrane including cost of all materials, labours, lead, lift, etc., complete as directed by the engineer at site. | 19.44 | M2 | 66,096 ₹77,993.28 Lowest | 71,928 ₹84,875.04 |
| 5.00 | Providing shuttering for supporting the reinforced cement concrete surfaces rate including cost of all materials, labours, lead, lift, etc. complete. | 12 | M2 | 6,480 ₹7,646.4 Lowest | 7,200 ₹8,496 |
| 6.00 | Providing RCC 1:1.5:3 using cement with 12 to 20mm metal including cost of all materials, labours, lead, lift, tools, curing etc. complete. | 3 | M3 | 29,400 ₹34,692 Lowest | 33,000 ₹38,940 |
| 7.00 | Supplying and providing the Conbextra GP2 or equivalent of 25kg bag and mixed with 25% of 6mm metal as per the instruction of engineer rate including cost of all materials, welding, shuttering arrangements, labour, lead, lift, hire charges for machine etc., complete. | 209.73 | Bag | 3,98,487 ₹4,70,214.66 Lowest | 4,40,433 ₹5,19,710.94 |
| 8.00 | Providing two coats of epoxy coatings with Nito-Cote ET 550/equivalent as protective coat over RCC Slab and Walls outside including cleaning the surface by brush and cloth, cost of all materials, labour, lead, lift, tools & plants, etc., complete. | 56.88 | M2 | 37,540.8 ₹44,298.14 Lowest | 39,816 ₹46,982.88 |
Tender Value
Refer Docs
EMD Value
₹8,600
Closing Date
8 Sept 2025, 2:00 pmClosed
CE TTPS Thoothukudi
Office of the SE Civil TTPS Thoothukudi
Dismantling the Impeller housing and suction duct pedestals for replacement of new bed bolt and Re erection of pedestals and grouting works in FD Fan 5A in Unit 5
2025_EB_594692_1
CE SE C TTPS 221 2025 26
Open Tender
Civil Works - Others
Item Rate
30 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,600
Yes
17 Nov 2025
19 Aug 2025
9 Sept 2025
19 Aug 2025
8 Sept 2025
19 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .