Tender Value
₹1.1 Cr
EMD Value
₹2.7 L
Closing Date
29 Sept 2026, 5:00 pm2d left
General Manager (Jal)
Water Works Compound Sector-5 Noida
D/o Village (Replacement of Damaged, Chocked and small diameter size sewer line with big size diameter sewer line in Jeet Ram Colony Village Bhangel) Noida
2026_NOIDA_1186567_1
78/SM(Jal)-I/ET/2026-27
Open Tender
Civil Works - Others
Fixed-rate
150 days
NOIDA
Please Refer to Tender Document
3 documents required · 3 mandatory
₹5,310
NOIDA
₹2.7 L
29 Sept 2026
16 Sept 2026
30 Sept 2026
16 Sept 2026
29 Sept 2026
16 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of E/I. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 1,397 | Cum. | 923.42 | ₹12,90,017.74 |
| 2 | Earth work in excavation by mecanical means (hydraulic excavater)/manual means in over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) i/c disposal of excavated earth, lead up to 50 m and lift up 1.5, disposed earth to be levelled and neatly dressed in all kind of soil.The contractor has to detect different utilities like sewer line, water supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of E/I. | 4,826.43 | Cum | 136 | ₹6,56,394.48 |
| 3 | Extra for every additional lift of 1.5 or part thereof in all kind of soil. | 1 | Cum | - | - |
| 3.01 | 1.50 - 3.00 m | 1,927 | Cum. | 15.8 | ₹30,446.6 |
| 3.0199999999999996 | 3.00-4.50m | 1,186 | Cum. | 31.6 | ₹37,477.6 |
| 3.0299999999999994 | 4.50-6.00m | 100 | Cum. | 47.4 | ₹4,740 |
| 4 | Centring and shuttering including strutting, propping etc. and removal of form for Foundation, footings, bases of columns etc. for mass concrete. | 347 | Sqm. | 181.64 | ₹63,029.08 |
| 5 | Providing and laying in postion cement concrete of specified grade exculding the cost of centring and shuttering _ All workup to plinth level 1:4:8( 1 cement : 4 Coarse sand zone (ZOne-III) 8 Graded stone aggregate 40 mm Nominal size) | 348 | Cum. | 5,746.88 | ₹19,99,914.24 |
| 6 | P/L in position Cement Concrete of specified grade excluding the cost of centering and shuttering – all work up to plinth level 1:2:4 (1 Cement : 2 C. Sand (zone-cum III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources). | 15 | Cum. | 6,753.45 | ₹1,01,301.75 |
| 7 | P/L Non-Pressure NP-3 class RCC Spigot Socketed pipe confirming to IS : 458 : 2003 with latest amendment laying in true alignment & position on craddle including with rubber ring (confirming to IS : 5382 with latest amendment testing of laid pipe as per direction of E/I. complete in all respect. | 1 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
TD78.pdf
Tender Documents • 2.42 MB
BOQ_2233372.xls
BOQ • 0.34 MB
Capability_78.xls
Additional Documents • 0.05 MB
E-tender_letter.pdf
PDF • 3.84 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .