Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹76.7 LAccepted-Finance | ₹76.7 L | 1 | Accepted-Finance ok |
| 2 | 2₹81.5 L+₹4.9 L (6.38%)Accepted-Finance | ₹81.5 L+₹4.9 L (6.38%) | 2 | Accepted-Finance ok |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹70 L
EMD Value
₹1.4 L
Closing Date
5 May 2026, 5:00 pmClosed
EO
NAGAR PALIKA RAWATSAR
Construction work for the Indoor Stadium, Badminton Court, and Table Tennis Court at the sports ground of PM Shri Government Senior Secondary School, Ward No. 15, Rawatsar.
2026_DLB_553748_1
DLB2627WSOB02368
Open Tender
Civil Works
Percentage
60 days
RAWATSAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
MDRISL,EXECUTIVE OFFICER
₹1.4 L
Yes
12 May 2026
24 Apr 2026
6 May 2026
24 Apr 2026
5 May 2026
24 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dressing of earth work in surface excavation including cutting and filling upto 30cm depth including disposal of excavated earth upto 50m and lift upto 1.5 m. All kinds of soil | 869.7 | Sqm | 41 | ₹35,657.7 |
| 2 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.Depth upto 1.5 m | 249.5 | Cum | 229.5 | ₹57,260.25 |
| 3 | Earth filling with available surplus soil excavated from foundations and taken only from outside of building plinth in layers not exceeding 20cm in depth, consolidating each deposited layer including ramming and watering and consolidation with lead up to 50 m and lift upto 1.5 m. | 565.31 | Sqm | 159 | ₹89,883.5 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | 104.02 | Cum | 4,575 | ₹4,75,891.5 |
| 5 | Providing & fixing precast cement concrete coping 1 : 2 :4 mix 50mm thick complete as per specification parapet | 27.14 | sqm | 421.5 | ₹11,437.57 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) Footing plinth beam | 30.22 | Cum | 6,340 | ₹1,91,590.36 |
| 7 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete. | 127.4 | sqm | 236.5 | ₹30,130.1 |
| 8 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto two stories excluding cost of centring, shuttering, finishing and reinforcement : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 12.15 | Cum | 7,380 | ₹89,667 |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto two stories excluding the cost of centring, shuttering, finishing and reinforcement: including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar M-20 Grade Concrete (1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) -As per design mix) Slab Beam for holding truss at top | 13.64 | Cum | 7,660 | ₹1,04,487.76 |
| 10 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for :Suspended floors, roofs, landings, staircases, balconies, girders, cantilevers, bands, coping bed plates, anchor blocks, sills, chhajjas, lintel, beam, plinth beam etc. Lintels, beams, plinth beams, girders, bressumers and cantilevers. | 71 | sqm | 426 | ₹30,246 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_986517.xls
BOQ • 0.26 MB
Scan_0011.pdf
PDF • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .