Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-AOC | ₹2.1 Cr | L1 | Accepted-AOC accept |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2.5 Cr
EMD Value
₹2.5 L
Closing Date
7 Aug 2024, 3:00 pmClosed
EXECUTIVE OFFICER
arumuganeri town panchayat
Construction of BT Road at Bharathi Nagar East Cross Street I, Bharathi Nagar East Cross Street II, Bharathi Nagar West Street Cross I, Bharathi Nagar west street Cross II,Bharathi Nagar Puthur Cross I,Lakshmimanagaram South street lane, Keela Shanm
2024_DTP_464614_1
154/2023
Open Tender
Civil Works
Works
ARUMUGANERI TOWN PANCHAYAT
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2.5 L
Yes
ARUMUGANERI TOWN PANCHAYAT
10 Aug 2024
20 Jul 2024
7 Aug 2024
20 Jul 2024
7 Aug 2024
20 Jul 2024
26 Jul 2024
Amount
Construction of Granular Sub-base by providing close graded material,mixing in a machanical plant at OMC,carriage of mixed material to work site,spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to acheive the desired density,Complete as per clause 401.
Providing and Laying, Spreading and Compacting graded stone aggregates to WET MIX MECADAM Specification in 250mm thick specification including premixing the materials with water at OMC in mechanical mix plant Carriage of mixed materials by tipper to work site laying in uniform layers with pavers in sub base/base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of materials,labour charges,rentals for machinery,fuel and all other incidental charges etc complete as per clause 406 of MORTH Specification
Providing and laying Prime coat over WMM surface using 7 kg of Emulsion bitumen (Ss1) per 10 sqm area for preparatory of surface including cost of material, labour charges rentals for machinery,fuel and all other incidental charges etc complete as per clause 502 of MORTH Specifications
Providing and laying Tack coat over WMM surface using 2.5 kg of Emulsion bitumen (Rs1) per 10 sqm area for preparatory of surface including cost of material, labour charges rentals for machinery,fuel and all other incidental charges etc complete as per clause 503of MORTH Specifications
Providing and laying 50 mm compacted thick Dense Bituminous Macadam using 0.24 cum of 26.5-13.2 mm graded metal and 0.25 cum of 13.2-2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70 bitumen (VG30) for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50 mm with mechanical paver to the specified grades and cross sections and compaction by vibratory roller to the required density etc.including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks,paver finisher, power rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 505 of MORTH Rev-5 specifications.
Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm, 0.13cum of 9.50-2.36 mm and 0.26cum of 2.36mm and below with 46.28kgs of VG 30 /VG 40 bitumen, 5.03 Kg of Plastic for 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20–30 tonnes capacity, conveying the mix by tipper trucks to paver site spreading the mix to uniform thickness of 40 mm with mechanical Paver to the specified grades and cross sections and consolidated by 80 - 10 tonne vibratory/ pneumatic roller to the required density etc., including labor for attending to paver site etc., including hire charges and fuel charges for 20 – 30t CMP with bitumen boiler, tipper trucks, paver finisher,/ 9m paver finisher, vibratory/ pneumatic rollers and all other tools and plant required including fule and all other incidental charges etc., complete as per specification using CMP as for clause 507of MORTH Rev-5.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .