Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.7 LAdmitted-Fee/PreQual/Technical/Finance AT GANDHICHOWK PO PS BHAWANIPATNA DIST KALAHANDI | BHAWANIPATNA | KALAHANDI | ODISHA | -31.99% | ₹7.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹7.8 L+₹11,211.51 (1.46%)Admitted-Fee/PreQual/Technical/Finance | -31.00% | ₹7.8 L+₹11,211.51 (1.46%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹8.4 L+₹67,948.59 (8.82%)Admitted-Fee/PreQual/Technical/Finance | -25.99% | ₹8.4 L+₹67,948.59 (8.82%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹8.5 L+₹79,160.11 (10.3%)Admitted-Fee/PreQual/Technical/Finance | -25.00% | ₹8.5 L+₹79,160.11 (10.3%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹8.6 L+₹90,484.88 (11.7%)Admitted-Fee/PreQual/Technical/Finance | -24.00% | ₹8.6 L+₹90,484.88 (11.7%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹11.3 L
EMD Value
₹11,400
Closing Date
18 Jul 2026, 5:00 pmClosed
EXECUTIVE OFFICER, BHAWANIPATNA MUNICIPALITY
EXECUTIVE OFFICER, BHAWANIPATNA MUNICIPALITY
Repair and Renovation of Jorepada School in Ward No-05
2026_ORULB_134177_2
BPM/07/2026-27
Open Tender
Civil Works - Others
Percentage
30 days
BHAWANIPATNA MUNICIPALITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹11,400
Yes
22 Jul 2026
3 Jul 2026
18 Jul 2026
3 Jul 2026
18 Jul 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling G.C.I. or A.C. sheet roofing after carefully removing the bolts and nuts including stacking the useful materials for reuse and removing the debris within 50m lead. Per 1 sqm | 185.65 | Sqm | 104.7 | ₹19,437.56 |
| 2 | Dismantling brick or stone masonry in clay under 3mtr height including stacking the useful materials for reuse and removing the debris within 50m lead. Per 1 cum | 10.02 | Cum | 1,479.17 | ₹14,821.28 |
| 3 | Dismantaling wrought and framed timber in roof frame work of floors after careful removal of nails, bolts etc.and stacking of the materials for reuse and removing the debries within 50 m. lead. | 14.43 | Cum | 920.2 | ₹13,278.49 |
| 4 | Removing old lime or cement plaster from walls including racking out joints 12mm deep and removing the debris within 50m lead. Per 1 sqm | 75.83 | Sqm | 88.4 | ₹6,703.37 |
| 5 | Dismentaling and removing 2.5 cm. Thick artificial stone flooring including stacking the useful materials for reuse and removing the debries within 50 meters lead. | 73.67 | Sqm | 117.9 | ₹8,685.69 |
| 6 | Dismantling and removing doors, windows and ventilators including removal of frame, hinges, fastening and stacking the same for reuse and removing the debris within 50m lead. Per 1 sqm | 9.12 | Sqm | 454 | ₹4,140.48 |
| 7 | Fly ash Brick masonary in cement mortar (1:6) by using 9" size Bricks including all cost, conveyance etc. complete. | 29.34 | Cum | 5,584.93 | ₹1,63,861.85 |
| 8 | 12mm thick cement plaster (1:6) for brick work (Per 1 Sqm.) | 246.47 | Sqm | 219.6 | ₹54,124.81 |
| 9 | priming walls with water based cement primer on new work one coat to give an even shade including cost of primer. | 778.03 | Sqm | 36.39 | ₹28,312.51 |
| 10 | Wall painting 2 coats with weather coat of approved shade on new work to give an even shade including cost of weather coat etc complete. | 778.03 | Sqm | 98.02 | ₹76,262.5 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
BOQ_599358.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .