Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹51.9 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹52.1 L+₹21,000.80 (0.40%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹61.3 L
EMD Value
₹41,000
Closing Date
11 Jul 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Officer
Arulmigu Varadharaja Perumal Temple at Vellur Siruvarai,Manamelkudi Thaluk,Pudukkottai District
Repair And Restoration Of Arulmigu Varadharaja Perumal Temple at Vellur Siruvarai,Manamelkudi Thaluk,Pudukkottai District
2024_HRCE_458187_1
43/AM Varadharaja Perumal Vellur/2024
Open Tender
Civil Works - Others
Item Rate
365 days
Arulmigu Varadharaja Perumal Temple at Vellur
Please refer tender documents
6 documents required · 6 mandatory
₹0
₹41,000
26 Sept 2024
28 Jun 2024
11 Jul 2024
28 Jun 2024
11 Jul 2024
28 Jun 2024
Amount
Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
Supplying and filling in foundation in basement with filling sand in layars of 150mm thickness well watered rammed and consolidated complying with relevant std specification including cost of supplying filling sand.
Cement concrete 1:5:10 (One of cement five of sand and ten of HBG jelly )for foundation using 40mm gauge HBG jelly inclusive of shoring strutting and baling out water where ever necessary ramming curing etc.,complete in respects complying with relevant Std
Brick masonry LIME MORTAR 1:2(one lime two sand)using Stock bricks including all varivargams, moulds, sthambams, mukapathrams, koodu, nasi and all ornamental brick work complete, all pancharams, agarais, karnakoodus, etc., forming core walls of Rajagopuram/ Vimanams complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete 100 cft for Kalkaram.
A)Vimanam/Gopuram of height upto 15'0"(excluding Kalkaram)
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime Mortor1:1:5 (One part of lime and one and half part of lime)complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Lime Mortor1:1:5 (One part of lime and one and half part of lime) and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. for kalkaram.
A)Vimanam/Gopuram of height upto 15'0"(excluding Kalkaram)
Labour charges for Removing the old cut stone Chithiravanam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Removing the old cut stone padma jegathi athisdanam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Removing the old cut stone kandam ubabeedam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Removing the old cut stone kabothagam ubabeedam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Removing the old cut stone padma athisdanam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Removing the old cut stone jegathi athisdanam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Removing the old cut stone kumatahagam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Removing the old cut stone pattiyal excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Removing the old cut stone kalvari excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Removing the old cut stone uthiram kampu Eluthagam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Removing the old cut stone kabothagam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Removing the old cut stone vyalavari excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Removing the old cut stone Pavukkal excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Supply of cut stone for carrying out Garbagraham,Arthamandapam,Mahamandapam and other temple structure upto 10feet length side wall,pavukkal,Uthiram and all hire charges for all tools and plants and clearing the site after completion of work etc., complete
Labour charges for Fixing the old cut stone Chithiravanam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Fixing the old cut stone padma jegathi athisdanam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Fixing the old cut stone padma athisdanam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Fixing the old cut stone jegathi athisdanam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Fixing the old cut stone Kumatahagam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Fixing the old cut stone Pattiyal excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Fixing the old cut stone Kalvari excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Fixing the old cut stone Kudam palagai excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Fixing the old cut stone Uthiram Kampu Eluthagam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Fixing the old cut stone Kabothagam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Fixing the old cut stone Viyalavari excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Fixing the old cut stone Pavukkal excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Fixing the old cut stone Nasi Thalai excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Fixing the New cut stone Chithiravanam Pattiyal Vari excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Fixing the new cut stone Kalvari excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Fixing the New cut stone Uthiram excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Fixing the new cut stone Kabothagam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Fixing the New cut stone Viyalavari excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Fixing the New cut stone Pavukkal excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for cut stone Nilaikkal (Nagapantham Kodikarukku and Karukku) excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for cut stone Pillars excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for cut stone Bothiyal excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Painting with multicolour (Panchavarnam) good Water based exterior Emulsion paints complete for the Vinamans/Gopurams, inculding cost and conveyence of all materials, lobour charges inculdinf Artist painter, working in heights, lifting of material, cost of brushes etc, complete-which including all extra for foldings-100sft, superficial area.
Flooring with cut stone slab of size 600mmX600mm and other sizes suitable for site requirement not less than 100mm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and lobour charges for paving and Pointing With Lime Mortor1:1:5 (One part of lime and one and half part of lime) etc complete.
Supplying & fixing Teak wood double leaf temple type door including all materials, labour charges for manufacturing and fixing in position including all furniture fittings etc complete with std. Specifications
Varnishing new and old wood work two coats of approved quality in all floors the rate includes cost of all materials,brushes,scaffolding charges etc complete
Scaffolding charges for Vimanans and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with coconut keeth coverings, providing ladder arrangements, country wood pland for working, inpection etc, complete hire charges only for erection, maintainance and removing the same on completion of the work 1 sq,ft.
A)Vimanam/Gopuram of height upto 15'0"Height
. Providing new sudhai vigrahams in the vimanams and Rajagopurams with galvanised iron rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in Lime Mortor 1:3 finishing the same with Lime Mortor 1:3 bringing to the correct shape (Lakshana) in conformift with silpa sastra inclusive of special ornaments, wiapons, peedam etc., complete and providing C.M. Nayam theervai wherever necessary. inclusive of cost and conveyance of all materials, such as cement broken bricks, and G.I. rods.binding wire all labour for working in heights, curing lifiting of materials etc., complete including cement painting 2 coats over a primary coat (one vigraham is accountable with one head, 4 hands with weapons, ornamental costumes etc., as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is pt\rovided the rate with peetam may be adopted as datailed hereunder)
Sudhai size above 1'0" upto 2'6"
Dismantling, clearing away and carefully stacking materials useful for reuse for any thickness of walls brick or stone in clay wall under 3 M High in respects complying with relevant std specification
Brick work in Lime Mortor 1:2(one part of lime and two part of sand) using country brick of size 83/4"x41/4"x2 3/4" including cost and conveyance of all materials and labour charges and all other incidental charges etc completc complying with standard specification.
Weathering course concrete with broken jelly 20mm size and pure slaked lime over RCC roof slab, the proportion being 32:12.5 for required depth of 80mm for giving required slope and thickness of roof on required, well beaten with wooden beater etc, complete with standard specifications.
Plastering with Lime Mortor1:1.5(One part of lime and one and half part of lime),20mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications.The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.
sub total
C GANESAN (BID ID -1079899)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_544716.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .