Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.8 LAccepted-AOC NOT AVAILABLE | NEW DELHI | DELHI | 110001 | ₹17.8 L | L1 | Accepted-AOC ok |
| 2 | L2₹20.0 L+₹2.2 L (12.2%)Rejected-Finance C O VERMA NIWAS SANJAULI SHIMLA 6 | SHIMLA | HIMACHAL PRADESH | 171001 | ₹20.0 L+₹2.2 L (12.2%) | L2 | Rejected-Finance reject |
Tender Value
₹21.2 L
EMD Value
₹42,490
Closing Date
18 Jun 2026, 6:00 pmClosed
Executive Engineer HPPWD Shimla Division No. III
E.E. Shimla DIVISION NO. III, HPPWD, Shimla-3
Special repair to NELs Skill lab in Block-A Second floor at IGMC SH CO partition work, flooring, cupboards, ceiling, painting and distempering sanitary installation etc. on Nels Lab at 2nd floor of Block B
2026_PWD_136263_4
SD-III-3999-4009dt.9-6-2026
Open Tender
Civil Works - Buildings
Percentage
30 days
IGMC
As per SBD
9 documents required · 9 mandatory
₹500
₹42,490
15 Sept 2026
11 Jun 2026
19 Jun 2026
11 Jun 2026
18 Jun 2026
11 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar | 8.8 | Cum | 805 | ₹7,084 |
| 2 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres. Of area 3 sq. metres and below | 12 | Each | 127 | ₹1,524 |
| 3 | Dismantling tiled floors laid in mortar upto floor two level including stacking of serviceable materials and disposal of un-serviceable materials within 20 metres lead (wooden/concrete joists to be measured and paid for separately) For thickness of tiles above 25mm and upto 40mm | 26.4 | Sqm | 34 | ₹897.6 |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) complete including carriage of materials in all leads and lifts | 0.4 | Cum | 6,441 | ₹2,576.4 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform with water proof ply 12 mm thick | 5 | Sqm | 297 | ₹1,485 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more | 40 | Kg | 76 | ₹3,040 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand) : 6 graded stone aggregate 20 mm nominal size) complete including carriage of materials in all leads and lifts | 2.08 | Cum | 4,661 | ₹9,694.88 |
| 8 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor all level. In Cement mortar 1:4 (1 cement :4 coarse sand) complete including carriage of materials in all leads and lifts | 159.56 | Sqm | 864 | ₹1,37,859.84 |
| 9 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length ( hold fast lugs or dash fastener shall be paid for separately). 2nd class deodar wood | 0.55 | Cum | 80,508 | ₹44,279.4 |
| 10 | Providing wood work in frames of false ceiling, partitions etc. sawn and fixed in position with necessary stainless steel screws etc. Rae wood/ Chill wood | 2.28 | Cum | 52,966 | ₹1,20,762.48 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
BOQ_201689.xls
BOQ • 0.31 MB
SBD2124035.pdf
Tender Documents • 2.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .