| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 2₹20.6 L−₹34,983 (1.67%)Accepted-AOC AMBATTUR | AMBATTUR | TIRUVALLUR | TAMIL NADU | 600053 | 2 | Accepted-AOC Bidder quoted the less than the estimate Value | |
| 2 | 1₹21.0 LRejected-Finance | 1 | Rejected-Finance Bidder quoted the More than the estimate Value |
| Sl No | Description | Qty | Unit | Shree Shayee Associates L2 | S.SELVARAJ L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for foundation in all soils and sub soils except in hard rock requiring blasting and depositing on bank with initial lead of 10m and initial lift of 2m inclusive of shoring, shuttering, bailing out water wherever necessary, refilling the foundation with excavated earth other than sandy soil in layers of not more than 150mm thick layers well rammed and depositing the surplus earth within the compound in place shown by the departmental officers and clearing and levelling the site etc,. complete. | 115 | 1 M³ | 150 ₹17,250 | 145 ₹16,675 Lowest |
| 2.00 | Plain Cement concrete 1:4:8 [one cement, four M-sand and eight course aggregates] using 40mm size Hard Broken/Machine crushed Granite Stone Jelly including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete complying with standard specification. | 10 | 1 M³ | 5,100 ₹51,000 | 5,025 ₹50,250 Lowest |
| 3.00 | Random rubble masonry in CM 1:5 [one cement and five M-sand] for foundation and basement using best new rough and bond stones including simultaneous pointing above ground level with the same mortar etc., complete complying with standard specification. | 81 | 1 M³ | 7,400 ₹5,99,400 | 7,319 ₹5,92,839 Lowest |
| 4.00 | Brick work In CM 1:5 mix using best Second Class Table Moulded Chamber Burnt Bricks 9"x4½"x3" having 350 kg/cm² compressive strength and 15% or less water absorbent in the period of 24hours immersement and confirming to ISI specifications including finishing, curing etc., complete complying with standard specification. | 44 | 1 M³ | 7,500 ₹3,30,000 | 7,400 ₹3,25,600 Lowest |
| 5.00 | Supplying, fabricating and placing in position of Steel Reinforcement using Mild Steel or Ribbed Tor steel bars for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete complying with standard specification. | 3.2 | 1 Qtl | 9,100 ₹29,120 | 9,038 ₹28,921.6 Lowest |
| 6.00 | Supplying and erecting centering for soffits of plane surfaces like RCC Slabs, Lintels, Sunshades, Square Columns, Staircase waists, Beams etc., including strutting 3m high using mild steel sheets of size 90cm x 60cm and BG 10 stiffened with M.S angles of size 25mm x 25mm x 3mm laid over silver Oak (C.W) joists of size 10cm x 6.5cm (spaced at about 90cm c/c) and supported by casurina props of 10cm to 13cm dia (spaced of 75cm c/c) etc., complete complying with standard specification. | 23 | 1 M² | 990 ₹22,770 | 980 ₹22,540 Lowest |
| 7.00 | Reinforced cement concrete 1:1½:3 [one cement, one and half M-Sand and three course aggregates] using 20mm size Hard Broken/Machine crushed Granite Stone Jelly for all RCC items of works excluding centering, shuttering and cost of reinforcement, including curing, fixing fan clamp and fixtures if necessary etc., complete complying with standard specification. | 4 | 1 M³ | 8,600 ₹34,400 | 8,565 ₹34,260 Lowest |
| 8.00 | Ceiling Plastering with cement mortar 1:3 mix (one cement three P-sand), 10mm thick in all floors for RCC slabs, Beams, Sunshades including packing, providing cement mortar beading for sunshades, staircase steps, landing slabs etc., as directed by the departmental officers etc., complete complying with standard specifications. | 16 | 1 M² | 300 ₹4,800 | 297 ₹4,752 Lowest |
| 9.00 | Plastering with cement mortar 1:4 mix (one cement four P-sand), 12mm thick in all floors using clean screened M-Sand and including cost of curing for fifteen days from the completion of the work and surface should free from undulations and including the cost of preparing the surface for plastering and protecting from other damages till setting of mortar etc., complete complying with standard specification. | 500 | 1 M² | 270 ₹1,35,000 | 264 ₹1,32,000 Lowest |
| 10.00 | Fabricating supplying & fixing of M.S Doors with single / two leaves with outer frame 40x40x6mm Angle, shutter frame 35x35x6mm Angle, MS sheet 20 gauge intermediate stiffener 'T' section 25x25x6mm, panel should be covered with 20 gauge M.S sheet with necessary Tower Bolt 30cm length, butt hinges, hold fast, aldrop and handle on both sides etc., complete with one coat of red oxide primer. | 17 | 1 M² | 4,800 ₹81,600 | 4,775 ₹81,175 Lowest |
Tender Value
₹21 L
EMD Value
₹42,000
Closing Date
5 Mar 2024, 3:00 pmClosed
Commissioner
Commissioner Tiruppur City Municipal Corporation
Construction of Pump Room and Construction of Compound wall at Indira Nagar in Ward No.1.
2024_MAWS_437922_1
E1 / 711 / 2024
Open Tender
Civil Works
Works
90 days
Tiruppur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹42,000
7 Oct 2025
4 Mar 2024
5 Mar 2024
4 Mar 2024
5 Mar 2024
4 Mar 2024
Amount
Earthwork excavation for foundation in all soils and sub soils except in hard rock requiring blasting and depositing on bank with initial lead of 10m and initial lift of 2m inclusive of shoring, shuttering, bailing out water wherever necessary, refilling the foundation with excavated earth other than sandy soil in layers of not more than 150mm thick layers well rammed and depositing the surplus earth within the compound in place shown by the departmental officers and clearing and levelling the site etc,. complete.
Plain Cement concrete 1:4:8 [one cement, four M-sand and eight course aggregates] using 40mm size Hard Broken/Machine crushed Granite Stone Jelly including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete complying with standard specification.
Random rubble masonry in CM 1:5 [one cement and five M-sand] for foundation and basement using best new rough and bond stones including simultaneous pointing above ground level with the same mortar etc., complete complying with standard specification.
Brick work In CM 1:5 mix using best Second Class Table Moulded Chamber Burnt Bricks 9"x4½"x3" having 350 kg/cm² compressive strength and 15% or less water absorbent in the period of 24hours immersement and confirming to ISI specifications including finishing, curing etc., complete complying with standard specification.
Supplying, fabricating and placing in position of Steel Reinforcement using Mild Steel or Ribbed Tor steel bars for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete complying with standard specification.
Supplying and erecting centering for soffits of plane surfaces like RCC Slabs, Lintels, Sunshades, Square Columns, Staircase waists, Beams etc., including strutting 3m high using mild steel sheets of size 90cm x 60cm and BG 10 stiffened with M.S angles of size 25mm x 25mm x 3mm laid over silver Oak (C.W) joists of size 10cm x 6.5cm (spaced at about 90cm c/c) and supported by casurina props of 10cm to 13cm dia (spaced of 75cm c/c) etc., complete complying with standard specification.
Reinforced cement concrete 1:1½:3 [one cement, one and half M-Sand and three course aggregates] using 20mm size Hard Broken/Machine crushed Granite Stone Jelly for all RCC items of works excluding centering, shuttering and cost of reinforcement, including curing, fixing fan clamp and fixtures if necessary etc., complete complying with standard specification.
Ceiling Plastering with cement mortar 1:3 mix (one cement three P-sand), 10mm thick in all floors for RCC slabs, Beams, Sunshades including packing, providing cement mortar beading for sunshades, staircase steps, landing slabs etc., as directed by the departmental officers etc., complete complying with standard specifications.
Plastering with cement mortar 1:4 mix (one cement four P-sand), 12mm thick in all floors using clean screened M-Sand and including cost of curing for fifteen days from the completion of the work and surface should free from undulations and including the cost of preparing the surface for plastering and protecting from other damages till setting of mortar etc., complete complying with standard specification.
Fabricating supplying & fixing of M.S Doors with single / two leaves with outer frame 40x40x6mm Angle, shutter frame 35x35x6mm Angle, MS sheet 20 gauge intermediate stiffener 'T' section 25x25x6mm, panel should be covered with 20 gauge M.S sheet with necessary Tower Bolt 30cm length, butt hinges, hold fast, aldrop and handle on both sides etc., complete with one coat of red oxide primer.
Painting two coats for New iron work surface using best quality synthetic enamel paint etc., complete complying with standard specification.
Painting two coats with approved Cement Paint over cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface and curing etc., complete as per standard specification.
Providing and Installations of CCTV Camera including server etc., complete.
Add GST @ 18%
Shree Shayee Associates
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .