| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAccepted-Finance | L1 | Accepted-Finance 1st lowest rate | |
| 2 | L2₹10.0 L+₹1,000.59 (0.10%)Rejected-Finance | L2 | Rejected-Finance 2nd lowest rate | |
| 3 | L3₹10.0 L+₹1,300.59 (0.13%)Rejected-Finance | L3 | Rejected-Finance 3rd lowest rate |
Tender Value
Refer Docs
EMD Value
₹19,999
Closing Date
4 Mar 2024, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Addl. District Magistrate, Uttar Dinajpur
office of the District Magistrate, Uttar Dinajpur
210/Planning_Dev.
2024_DMUD_674476_1
210/Planning_Dev.
Open Tender
CIVIL WORKS
Item Rate
60 days
Raiganj
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹19,999
11 Mar 2024
26 Feb 2024
6 Mar 2024
26 Feb 2024
4 Mar 2024
26 Feb 2024
Amount
Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding literate or sandstone) including removing. Spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches. leveling .dressing and ramming the bottom. Bailing out water as required complete. (a) Depth of excavation not exceeding 1.500 mm
Earth work in filling in foundation trenches or plinth with good earth in layers not exceeding 150 mm. Including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation
(b) (i) With carried earth arranged by the contractor within a radius of 1 km. Including cost of carried earth
Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches
(II) (I) Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor (A) [Pakur Variety](a) 1:3:6 proportion
Brick work with 1st class bricks in cement mortar (1:6) (a) In foundation and plinth (b) In superstructure, ground floor
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etcinitial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and directiono 4 m (i) Tor steel/Mild Steel I. SAIU TATA/RINL/JSWL/JSPL
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course,scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping (i) With 1:4 cement mortar,(c) 15 mm thick
(i) With 1:6 cement mortar,(b) 20 mm thick
(ii) With 1:4 cement mortar (b) 10 mm thick plasterplasterplasterover concrete surface
Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame exluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum should be correted upto three decimals (c) Sal : Siliguri
Panel shutters of door and window as per design having tongued and groove half lap jointed as per direction of the Engineer-in-charge including fitting and fixing shutter in position ,bt excluding the cost of hinges and other fittings in ground floor. (iii) 35mm thick shutters with 19mm thick panel of size 30 to 45 cm. (b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak
Supplying, fitting and fixing M.S. clamps for door and window frame made of flat bent bar, end bifurcated with necessary screws etc. by cement concrete(1:2:4) as per direction. (Cost of concrete will be paid separately) (b) 40mm X 6mm, 200mm Length
Anodised aluminium butt hinges of approved quality manufactured from extruded section conforming to I.S. specification (I.S. 205/66) and fitted and fixed with cadmium plated screws:
Anodised aluminium barrel / tower / socket bolt (full covered) of approved manufactured from extruded section conforming to I.S. 204/74 fitted and fixed with cadmium plated screws ..(e) 300mm long x 12mm dia bolt.
(c) 100mm long x 10mm dia bolt.
Anodised aluminium Aldrop / Sliding bolts of approved quality manufactured from extruded section conforming to I.S. specification (I.S. 2681/66) fitted and fixed complete
(a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows,railing etc. fitted and fixed with necessary screws and lugs in ground floor.(i) Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr
Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour.In ground floor.3 mm. thick topping (High polishing grinding on this item isnot permitted with ordinary cement). Using grey cement (iii) 35 mm. thick
Neat cement punning about 1.5mm thick in wall,dado,windowsill,floor etc. NOTE:Cement 0.152 cu.m per100 sq.m
Applying decorative cement based paint of approved quality after preparing the surface including scraping the same thoroughly (plastered or concrete surface) as per manufacturer's specification (iii) Two coats.
(a) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc
(b) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc
(A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand paperingetc.including using of approved putty etc. on the surface, if neces (a) On timber or plastered surface :(iv) Two coats (with any shade except white)
(b) On steel or other metal surface With super gloss (hi-gloss) - :(iv) Two coats (with any shade except white)
Supplying, fitting & fixing UPVC pipes A- Type and fittings conforming to IS:13592-1992 with all necessary clamps nails, including making holes in walls, floor etc. cutting trenches in any soil through masonry concrete structures etc if necessary and mending good damages including joining with jointing materails (Spun Yarn, Valamoid/Bitumen/M-Seal etc) complete. A) UPVC Pipes:(i) 75 mm. Dia.
BHAGYA LAXMI ENTERPRISE
SHIV SHAKTI ENGINEERING WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .