| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.7 LAccepted-AOC | ₹33.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹33.8 LRejected-AOC | ₹33.8 L | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Due to Family Issue |
| Sl No | Description | Qty | Unit | ARIJITH ASSOCIATES L2 | C THAMIZHARASU L1 |
|---|---|---|---|---|---|
| 1.001.) Construction of Two Class room Building in PUM School at Seeliyampatty Panchayat | |||||
| 2.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 70.2 | cum | 250 ₹17,550 | 246 ₹17,269.20 |
| 3.00 | Rain water Harvesting Structure | 7.06 | cum | 250 ₹1,765 | 246 ₹1,736.76 |
| 4.00 | Supplying and Filling foundation and basement with filling Msand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 13.97 | cum | 1,800 ₹25,146 | 1,800 ₹25,146 |
| 5.00 | Rain water Harvesting Structure | 1.35 | cum | 1,800 ₹2,430 | 1,800 ₹2,430 |
| 6.00 | Refilling with excavated earth as per standard specifications etc complete | 67.58 | Sqm | 42 ₹2,838.36 | 42 ₹2,838.36 |
| 7.00 | Collection and supply of 40mm Metal and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specification | 2.03 | cum | 1,580 ₹3,207.40 | 1,579 ₹3,205.37 |
| 8.00 | Collection and supply of 20mm Metal and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specification | 2.03 | cum | 2,040 ₹4,141.20 | 2,032 ₹4,124.96 |
| 9.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation | 30.49 | cum | 5,460 ₹1.7 L | 5,459 ₹1.7 L |
| 10.00 | Rain water Harvesting Structure | 0.42 | cum | 5,460 ₹2,293.20 | 5,459 ₹2,292.78 |
Tender Value
Refer Docs
EMD Value
₹34,750
Closing Date
27 Jun 2025, 3:00 pmClosed
BDO BP Attur
BDO Office Taluk Office Campaus Attur
Construction of Two Class Room Building in PUM School at Seeliyampatty Panchayat of Attur Block at Salem District CFSIDS 2025-26 No.1
2025_RDTN_571278_1
Roc No.1989/2025/A2-CFSIDS-W.No-1
Open Tender
Civil Works
180 days
BDO Office Attur
As Per Tender Documents
3 documents required · 3 mandatory
₹0
₹34,750
BDO Office Attur
10 Mar 2026
20 Jun 2025
27 Jun 2025
20 Jun 2025
27 Jun 2025
20 Jun 2025
23 Jun 2025
Amount
1.) Construction of Two Class room Building in PUM School at Seeliyampatty Panchayat
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Rain water Harvesting Structure
Supplying and Filling foundation and basement with filling Msand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Rain water Harvesting Structure
Refilling with excavated earth as per standard specifications etc complete
Collection and supply of 40mm Metal and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specification
Collection and supply of 20mm Metal and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specification
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
Rain water Harvesting Structure
Brickwork in CM 1:5 mix using country bicks including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
Rain water Harvesting Structure
Teaches rack
Cupboard for Students
Chappal rack for School
Supply & Fabrication of steel including all cost and conveyance of all materials to site and all labour charges for etc., complete.
Supplying & Erecting centering for sides & soffiots including necessary supports for all Rcc works etc.complete
Centering Sides & Lintel beam
Reinforced Cement Concrete 1:1.5:3 mix using 20 mm metal for all items including cost & conveyance and labour charges etc complete.
Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Paving the floor with kota stone slab of size 600 x 600 of 18 / 20mm (un-polished) in all floors laid in of cement mortor 1:3 (one cement three M.Sand), 20mm thick and pointed with colour cement neatly including polishing with polishing stone and oxalic acid etc., so as to perfectly smooth and glossy and including hire charges for polishing machine and power consumption charges etc. The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.
Weathering course concrete using best quality broken brick jelly of size 20mm in pure slacked lime over the RCC roof slab in th proportion of brick jelly to lime being32:12.5 by the volume and laid over a single layer and consolidated to the required dsesign & finished thick. beating the concrete with wooden beaters of approved pattern, keeping the surface contantly wetted with sprinking lime & jaggery water as per standard specifications etc., complete as directed by the departmental officers. Rate for 10m3
Finishing the top of roof with one course of machine pressed tiles of size 20 x 20 x 2cm (100% new tiles ) of approved quality laid in CM 1:3, 12mm thick. With water proofing compound confirming to IS by 2% by weight of cement used & the joint pointed neatly to full depth of tiles with the same water proofing compound mixed with cement mortar, Red oxide etc., complete complying with standard specifications. Rate for 10m2
Paving the floor with pre-polished concrete anti-skid step tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty should be got approved by the Executive Engineer before use on work. (Based on SoR 2023-24) Wall putty Powder: (10 sqm/10x20 kg= 20Kg)
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
Teaches rack
Cupboard for Students
Chappal rack for School
Rain water Harvesting Structure
Distempering in two coats using oil bound distemper including cost and conveyance of all materials to site and all labour charges etc complete.
Teaches rack
Cupboard for Students
Painting in two coats using exterior emulsion paint including cost and conveyance of all materials to site and all labour charges etc complete.
Chappal rack for School
Rain water Harvesting Structure
Painting two coats over new iron work using synthetic enamal paint including cost and conveyance of all materials to site etc complete
Supply of Steel doors including cost etc complete.etc complete Steel Door (1.20 x 2.40m)
Supply of Steel windows including cost etc complete.etc complete Steel Window W (1.20 x 1.60m)
Labour charges for fixing Doors alongwith frames in position etc., complete (finished work) as per serial no W-0152
Labour charges for fixing Windows and Ventilators alongwith frames in position etc., complete (finished work) as per serial no W-0153
Supply and fixing of Cadapah slab of 20/30mm thick including cost and conveyance and all charges etc complete.
Teaches rack
Cupboard for Students
Chappal rack for School
Providing and fixing of PVC rain water down fall pipe 110mm dia with necessary T W Clamps, Plug, Shoes, bend, Screws, nails etc., complete
Wiring with 2x1.5 Sqmm (22/0.3) PVC insulated SC unsheathed Cu. Conductor of 1100 V grade in suitable PVC rigid pipe Concealed in wall and ceiling with PVC accessories in flush with wall with 3mm thick hylum sheet cover with TW switch box and 5a F.T switch with continuous earth wire connection of 14 SWG TC Wire of making good of the concealed portion with suitable colour for PVC Concealed light point / Fan point (for electronic regulator) SD.23
Wiring with 2x1.5 Sqmm (22/0.3) PVC insulated SC unsheathed Cu. Conductor of 1100 V grade in suitable PVC rigid pipe Concealed in wall and ceiling with PVC accessories in flush with wall with 150mmx100mmx113mm TW Switch box with 3 mm thick Hylem Sheet cover for 5 A 3 pin non inter locking CS plug with continuous earth wire connection of 14SWG TC wire and making good of the concealed portion with suitable colour for concealed PVC plug point SD.38
Supply and run of 2 of 4 Sqmm (56/0.3) PVC insulated SC unsheathed Cu.Conductor of 1100 v grade on 7/20 GI Bearer wire for Service connection mains (SD.65)
Supply and run of 2 of 4 Sqmm (56/0.3) PVC insulated SC unsheathed Cu.Conductor of 1100 v grade in 25mm dia GI Pipe (Class'B') Suitably bent at both ends with necessary angle iron upright and end supports for maints (SD.70)
Supply and fixing of 8 way single pole and neutral MCB sheet steel enclosure distribution board with double door (metal) 1 No. 32A DP MCB as incoming and 6 Nos. 6A to 32A SPMCB outgoing in flush with wall and making good of the concealed portion with earth connection only. The MCB DB and MCB's should be with ISI mark (like standard make) SD. No.167
Supply and fixing of TNEB meter Board suitable for 32A Three phase service connection with 32 A Fuse unit (500V) 32 A neutral link and earth ling (1"x1/8" Copper flat) on TW plank of size 600mm x 450mm x 19mm with supporting TW reepers of 1" thick an either side with painting with suitable bolt and nuts for fixing the TW plank on wall with earth connection and inter connection with 7/20 PVC insulated copper wire from EBV Meter to fues unit (SD.126)
Supply and fixing of single box type 4'-40W flourescent tube fitting with copper choke and condenser with TW round block on wall or ceiling with flourescent tube with PVC unsheathed copper leads from terminals to the fitting of Tube Light [SD 88 ]
Supply and fixing of 1200 mm ( 48") AC ceiling fan complete with stepped electronic 300 W regulator with 300 mm down rod on the existing clamp. SD 106
Provisions for drawing Bala painting including all cost and conveyance of men and materials etc.,(the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Manufacturing, Supplying and Fixing of Stainless Steel Hand rails for staircase near wet riser using 50mm dia 304L Grade Stainless Steel pipe of 1.60mm thick will be provided with tubular supports made of 304L Grade Stainless Steel pipe of 25mm dia of 1.60mm thick welded to the railing. The supports will be grouted into the wall and provided with 93.00mm thick Stainless Steel circular base plate of 304 Grade. The rate shall included for grouting into concrete with necessary supporting arrangements the hand rail in floor polishing buffing, bonding, cutting, grinding, conveyance, welding charges, electrical charges, etc. complete ( SOR. No.M-0652)
Provisions for Fibre White Writing Board
Provisions for String Bandal
Provisions for Magnetic Steel Ceramic Green Writing Board with Aluminium Sheet
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work (P. No.52 sl. No.124)
Teaches rack
Cupboard for Students
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
ARIJITH ASSOCIATES (BID ID -1377033)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid