Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹3.7 L+₹68,748.30 (22.6%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹3.8 L+₹70,339.70 (23.1%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹3.8 L+₹74,659.55 (24.5%)Admitted-Finance | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SRI KRISHNA CONSTRUCTION L2 | RINA DEVI L3 | M/s Rai Construction Company L1 | M/S ARADHYA ENTERPRISES L4 |
|---|---|---|---|---|---|---|---|
| 1.00SILT CLEARANCE OF BAHADURPUR DY. FROM KM 0.000 TO KM 8.000 | |||||||
| 1.01 | Silt clearance/trench digging including lift upto 1.5m and lead upto 30m, including cost of driver/assistant driver, POL, maintencance of machine,contract or profit, taxes etc including partialy rough dressing & compaction. By hydraulic excavator equivalent capacity 25cum/hour. | 6,785.3 | Cum | 47.5 ₹3,22,301.75 | 47.5 ₹3,22,301.75 | 38.5 ₹2,61,234.05 Lowest | 48 ₹3,25,694.4 |
| 2.00SCRAPING OF BAHADURPUR DY BETWEEN KM. 8.000 TO KM 9.000 | |||||||
| 2.01 | Bed and Berm scraping of channel including desilting. | 2,630 | SQM | 2.9 ₹7,627 | 2.8 ₹7,364 Lowest | 2.8 ₹7,364 Lowest | 2.8 ₹7,364 Lowest |
| 3.00SILT CLEARANCE OF KHUDRA MINOR FROM KM. 0.000 TO KM. 3.000 | |||||||
| 3.01 | Silt Clearance in channel with dressing and section carrying discharge below one cumec without service road and its proper disposal including all lead & lift etc complete. | 927.2 | Cum | 47 ₹43,578.4 | 49 ₹45,432.8 | 39 ₹36,160.8 Lowest | 50 ₹46,360 |
Tender Value
₹4.5 L
EMD Value
₹9,000
Closing Date
9 Oct 2026, 12:00 pmClosed
Executive Engineer
Irrigation Division-2, Kushinagar
Silt clearance of Bahadurpur Dy. from km 0.000 to km 8.000 and Khudra Minor from km 0.000 to km 3.000, along with scrapping work of Bahadurpur Dy. from km 8.000 to km 9.000
2026_UPIDC_1191373_41
06/EE/ID2K/Tender/2026-27
Open Tender
Civil Works - Canal
Item Rate
Irrigation Division-2, Kushinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹677
₹9,000
Yes
17 Oct 2026
1 Oct 2026
9 Oct 2026
1 Oct 2026
9 Oct 2026
1 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SILT CLEARANCE OF BAHADURPUR DY. FROM KM 0.000 TO KM 8.000 | |||||
| 1.01 | Silt clearance/trench digging including lift upto 1.5m and lead upto 30m, including cost of driver/assistant driver, POL, maintencance of machine,contract or profit, taxes etc including partialy rough dressing & compaction. By hydraulic excavator equivalent capacity 25cum/hour. | 6,785.3 | Cum | - | - |
| 2SCRAPING OF BAHADURPUR DY BETWEEN KM. 8.000 TO KM 9.000 | |||||
| 2.01 | Bed and Berm scraping of channel including desilting. | 2,630 | SQM | - | - |
| 3SILT CLEARANCE OF KHUDRA MINOR FROM KM. 0.000 TO KM. 3.000 | |||||
| 3.01 | Silt Clearance in channel with dressing and section carrying discharge below one cumec without service road and its proper disposal including all lead & lift etc complete. | 927.2 | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
NIT1434.pdf
Tender Documents • 1.30 MB
BOQ_2248219.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .