Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical BLOCK NO 14 VADAR HOSUING SOCETY GOKHALENAGAR ROAD NEAR MARUTI MANDIR SHIVAJINAGAR PUNE MAHARASHTRA INDIA 411016 | PUNE | MAHARASHTRA | 411016 | Accepted-Technical Accepted |
| 2 | Accepted-Technical MU PO PADALI TA SHIRUR KASAR DIST BEED 413249 | PADALI | BEED | MAHARASHTRA | 413249 | Accepted-Technical Accepted |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical SHRIRAM APARTMENT PLOT NO 31 SURANAGAR CHHATRAPATI SAMBHAJINAGAR | CHHATRAPATI SAMBHAJINAGAR | CHHATRAPATI SAMBHAJINAGAR | MAHARASHTRA | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical S NO 280 2 A GALO NO 1 2 3 PLOT NO 358 2 MANIK ELITE BARAMATI DIST PUNE 413102 | PUNE | MAHARASHTRA | 413102 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
11 Aug 2026, 5:00 pmClosed
EE BID Beed.
Jayakwadi Colony Nagar Road, Beed
Repairs to Existing Retaining wall And Providing Retaining wall at breached portion of left hand side guide bund at uthala river d-s of Uthala LMI Tank taq.Shirur ka dist.Beed
2026_CCCA_1324410_1
E Tender B-1/02/2026-27
Open Tender
Civil Works
Percentage
540 days
Beed
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹1.1 L
19 Oct 2026
4 Aug 2026
12 Aug 2026
4 Aug 2026
11 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Please refer booklet for detail estimate | - | - | - | - |
| 2 | Item No.1
Excavation in all kind of soil incluiding boulders upto 0.6 m Diameter (0.113cum) for canal seating of Embankment filter drains/catch water drains etc.,and placing the excavated stuff neatly in dump area or for formation of service road /embankment incluiding cost of all materials,machinery , labours,dressing bed and sides to required level and profile ,etc.,complete with lead upto 1 km and all lifts as directed. | 176.4 | Cum. | 102.65 | ₹18,107.46 |
| 3 | Item No.2
Excavation in Hard Murum including boulders upto 0.6 m Diameter (0.113cum) minimize damage to side slopes of excavation in water prism area by adopting any one or combination of line drilling/pre splitting /smooth blasting techniques and placing the excavated rock neatly in approved dump area including cost of all materials,machinery , labours,levelling bed etc.,complete with lead upto 1 km and all lifts as directed. | 212.8 | Cum. | 121.1 | ₹25,770.08 |
| 4 | Item No.3
Excavation in Soft rock without Blasting incluiding boulders upto 0.6 m Diameter (0.113cum) for canal seating of Embankment filter drains/catch water drains etc.,and placing the excavated stuff neatly in dump area or for formation of service road /embankment incluiding cost of all materials,machinery , labours,dressing bed and sides to required level and profile ,etc.,complete with lead upto 1 km and all lifts as directed. | 155.4 | Cum. | 144.1 | ₹22,393.14 |
| 5 | Item No.4
Excavation in hard rock of all toughness by ordinary blasting methods incluiding boulders upto 0.6 m Diameter (0.113 cum) minimising damage to side slopes of excavation in water prism area by adopting any one or combination of line drilling /pre-splitting /smooth blasting techniques and placing the excavated rock neatly in approved dump area including cost of all materials, machinery, labour,levelling bed etc.,complete with lead upto 1 km and all lifts as directed. | 310.8 | Cum. | 516.85 | ₹1,60,636.98 |
| 6 | Item No.5
Providing and fixing in positionTMT- FE- 500 bar reinforcement of various diameters for R.C.C. pile caps,footings, foundations, slabs, beams columns,canopies, staircase, newels, chajjas, lintels pardis,copings, fins, arches etc. as per detailed designs,drawings and schedules. including cutting, bending,hooking thebars,binding with wires or tack welding and supporting as required complete as directed.. | 20.58 | MT | 83,361.75 | ₹17,15,584.82 |
| 7 | Item No.6
Providing and laying in situ cement concrete of grade M-10 of trap/ granite / quartzite / graded metal for foundation and bedding with Batching Plant and Transit Mixer including placing, compacting, curing etc. complete with all lifts as directed. | 49.47 | Cum. | 4,622.6 | ₹2,28,680.02 |
| 8 | Item No.7
Providing and laying insitu cement concrete of grade M20 of trap/granite/gneiss/quartzite/graded metal
for RCC works of gallery, sluice, spillway crest,spillway down stream face, energy dissipating structures, intake structures, training walls, piers,abutments, slabetc.with Batching Plant and Transitmixer including centering, shuttering, scaffolding, compacting, curing etc. complete with all lifts etc.complete as directed. | 988.4 | Cum. | 6,325 | ₹62,51,630 |
| 9 | Item No.8
Back filling up to ground level behind the structures etc.complete with suitable material of approved
quality in layersnot exceeding20cmwithout disturbing the structure etc. complete as directed. | 684.32 | Cum. | 57.15 | ₹39,108.89 |
| 10 | Item No.9
Providing and laying weep holes of 100 mm diameter PVC pipes as per drawing for abutment returns, return walls etc. Complete. | 477.9 | Rmt. | 533 | ₹2,54,720.7 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
BOQ_2268358.xls
BOQ • 0.29 MB
Booklet.pdf
Tender Documents • 10.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .