| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC L1 Tenderer |
| 2 | L2₹1.1 Cr+₹3.2 L (2.90%)Rejected-Finance | ₹1.1 Cr+₹3.2 L (2.90%) | L2 | Rejected-Finance L2 Tenderer |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
10 Jan 2025, 3:00 pmClosed
The Additional Collector(D.) DRDA Chengalpattu
O/o The Additional Collector(D.) DRDA Chengalpattu
Strengthening of ECR to Karaithittu road 0 0 to 1 720 Pudhupattinam Village Panchayat in Thirukazhukundram Panchayat Union of Chengalpattu District having PKG No.07 under NABARD RIDF XXX Tranche 2024 25
2024_RDTN_514829_1
DIPR/5603/Tender/2024 dt.26.12.2024
Open Tender
Civil Works - Roads
Item Rate
180 days
Thirukazhukundram
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹1.2 L
O/o The Additional Collector(D.) DRDA Chengalpattu
13 Mar 2025
28 Dec 2024
10 Jan 2025
28 Dec 2024
10 Jan 2025
28 Dec 2024
2 Jan 2025
Amount
Clearing the Scrub Jungle including removing from the site disposal by burying or burying etc.complete
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m with all leads and lifts and all other incidential charges. etc., complete
Providing, Laying, Spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing and laying Prime coat over BT surface using 7.0 kgs. of emusion for 10 sqm.area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat by bitumen sprayer etc., complete as per clause 503 of MOST specification
Bituminous macadam 50 mm consolidated thickness using bitumen 60/70 grade as per clause 504 of MoRTH specification(Plastic waste)
Providing and laying tack coat over BT surface using 2.5 kgs. of emusion for 10 sqm.area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat by bitumen sprayer etc., complete as per clause 503 of MOST specification
BITUMINOUS CONCRETE 25mm THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site. spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-301 CMP with bitumen boiler, tipper trucks, paver finisher/9m paver finisher, vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc.. complete as per specification using CMP as per clauses 507 of MORTH Part-5
Filling with US Gravel for side berms including cost and conveyance of all materials to site and stacking them to departmental guage for premeasurements and labour charges for filling etc., complete
BITUMINOUS CONCRETE 25mm THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site. spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-301 CMP with bitumen boiler, tipper trucks, paver finisher/9m paver finisher, vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc.. complete as per specification using CMP as per clauses 507 of MORTH Part-5 For speed breaker
Supplying and fixing in position of 60 cm Equilateral triangle cautionary signboard
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads @250gms per sqm area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level uniform and free form streaks and holes etc complete as per MORT&H specification no.803
Supplying and fixing of KM stone of size 1.65 x 0.45 x 0.15m
Supplying and fixing of HM stone of size 0.75x 0.23x 0.10m
Construction of RCC Slab Culvert 1.5m span at ch 10m and 3.0m span @ Ch1/700
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
1.5m span at ch 10m
3.0m span at ch 1700m
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
1.5m span at ch 10m
3.0m span at ch 1700m
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
1.5m span at ch 10m
3.0m span at ch 1700m
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
1.5m span at ch 10m
3.0m span at ch 1700m
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmental Officers etc.Complete.
Up to Ground Level
1.5m span at ch 10m
3.0m span at ch 1700m
Above to Ground Level
1.5m span at ch 10 m
3.0m span at ch 1700 m
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
1.5m span at ch 10m
3.0m span at ch 1700m
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
1.5m span at ch 10m
3.0m span at ch 1700m
Cement concrete 1 : 1.5 : 3 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for all RCC works
1.5m span at ch 10m
3.0m span at ch 1700m
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications
1.5m span at ch 10m
3.0m span at ch 1700m
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
1.5m span at ch 10m
3.0m span at ch 1700m
Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900 mm. Dia. Semi spherical back fill arrangements with 100 mm. size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the backfill IN BETWEEN THE ABUTMENTS AND RETURNS. (For weep holes)
1.5m span at ch 10m
3.0m span at ch 1700m
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
1.5m span at ch 10m
3.0m span at ch 1700m
Construction of Un-Reinforced Dowel jointed at expansion and construction joint only. Plain cement concrete pavement , thickness as per design over a prepared sub base with 43 grade cement or or any other type as per clause 1501.2.2 M35 (Grade) coarse and fine aggregates confirming to IS : 383 maximum size of coarse aggregate not exceeding 25mm mixed in a concrete mixer not less than 0.2cum capacity and appropriate mix design and laid in approved fixed side formwork (steel channel laying and fixing of 125 micron thick polythene film, wedges steel plates including levelling the formwork as per drawing) spreading the concrete with showels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including operation including provision of contraction and expansion , construction joints, applying debonding strips, primer sealant, dowel bars, near approaches to bridge/culvert and construction joints admixtures as approved curing of concrete slabs for 14 days using compound (where specified) and water finishing to lines and grade as per drawing and technical specifications clause 1501.
Towards the charges for routline maintenance of the road work executed under NABARD RIDF XXX Tranche -2024-25 including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost For the First Year from the date of completion of work
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (for Construction & maintenance) above this row in column "BB" for all works in this package}
MBS ENTERPRISES (BID ID -1230122)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .