Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹45.7 LAccepted-AOC PALI ROAD BEHIND CIVIL COURT SHAHDOL MP 484001 | SHAHDOL | SHAHDOL | MADHYA PRADESH | 484001 | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹45.8 L+₹8,756 (0.19%)Rejected-Finance PRAKASH NAGAR BIRSINGHPUR DISTT UMARIA M P | UMARIA | MADHYA PRADESH | 484001 | L-2 | Rejected-Finance Other Than L-1 | |
| 3 | L-3₹46.0 L+₹32,789 (0.72%)Rejected-Finance | L-3 | Rejected-Finance Other Than L-1 | |
| 4 | L-4₹46.3 L+₹58,393 (1.28%)Rejected-Finance BEHIND MAHA MIRTYUNJAY MANDIR SPO TYPE MPEB COLONY BIRSINGHPUR PALI DISTRICT UMARIA M P | L-4 | Rejected-Finance Other Than L-1 |
Tender Value
₹60.8 L
EMD Value
₹1.5 L
Closing Date
5 Oct 2020, 5:30 pmClosed
SEPNW SGTPS MPPGCL Birsinghpur
SEPNW SGTPS MPPGCL Birsinghpur
Annual maintenance work of Railway siding connceting crossing station with Power House, MGR and Pali mines with plant sidings and other sidings of SGTPS,Birsinghpur. Year-2020-21
2020_MPPGC_99136_1
SEC/BRS/464
Open Tender
Civil Works - Others
Item Rate
365 days
SGTPS MPPGCL BIRSINGHPUR
As per NIT
10 documents required · 10 mandatory
₹2,000
Payable TO Sr AO SGTPS Birsinghpur
₹1.5 L
Yes
2 Jun 2022
19 Sept 2020
9 Oct 2020
19 Sept 2020
5 Oct 2020
19 Sept 2020
Maintenance of permanent way and bridges as per specification and as per direction of Engineer-in-charge.
Out Side Power House
Inside Power House
Removing and taking out old worn out/damaged rails from existing track i/c returning the same to MPPGCL store, taking delivery from MPPGCLstore transporting to site ,cutting of rail, drilliing of hole as required,fixing in position on required grade, alignment and level etc complete the job as direction of Engineer-in-charge.
Removing and taking out old worn out/ damaged sleeper (any type of sleeper) from existing track and replacing the same by usable / new sleepers taking from MPPGCL store i/c fixing in position in required grade, level, alignment and packing of sleeper and other operation necessary for traffic movement in safely. Rate includes all transportation of sleeper from site to store & vise versa etc. complete the job as direction of Engineer-in-charge.
Removing and taking out old worn out / damaged crossings and switches with fittings excluding sleepers in connection with replacing the usable / new supplied by the deptt. Rate includes taking delivery from MPPGCL store and returning the same to store with all transportation fixing in proper alignment gauge level with all fastenings etc. complete the job to safe traffic and direction of Engineer-in-charge.
Crossing 1 in 8.5
Crossing 1 in 12
Switch - 1 in 8.5/1 in 12 (a) Tongue rail / Stock rail
(b) Liver box
Earth work for repairing of cess and embankment with hard soil i/c excavation, transporting to site with all leads and lifts compaction at OMC to dry density not below 90% with cost of watering and other miscellaneous works i.e. benching dressing etc complete the job as direction of Engineer-in-chagre.
Deep screening of existing track i/c points & crossing ballast under traffic including removing the core and excavation (150 mm) below the bottom of sleeper and recover the clean ballast by screening on wire mesh inserting the clean ballast into the track and giving Kachcha packing to make the track fit for 15 KM PH speed. Rate includes the dispossing off the all muck and other ancilliary work required to complete the job as per IR specification and satisfaction to Engineer-in-charge.
Disposal of slided earth from reaches of cutting portion of track from side drains and track with all leads and lift ensuring proper drainage slope etc. complete as per of direction of Engineer-in-charge.
Supplying of 50 MM crusher broken hard stone ballast as per I.R. specification,free from dust, vegetation etc, stacking along railway track,with all leads, lifts royalty and other taxes etc. as per direction of Engineer-in-charge
Running out of fresh 50MM gauge hard stone ballast on track as per requirement from stacks along the track leads with in 500M with all lifts labours T&P etc. complete the job as per direction of Engineer-in-charge
Fixing of MCI inserts ( Stem type 1.6 Kg each) in pocket of 100mm x 100mm x 150mm making by chiseling the R.C.C. beam in track hopper in specific manner and grouting with "Dobeckot resin" 500 C and Hardner "EH-411" and silica sand M-10 in ratio of 100:50:850 by weight or equivalent approved by Engineer-in-charge including breaking of old PSC sleepers for obtaining the inserts etc. complete the job in proper alignment level and fixing the rail fit for safe movement of traffic.
Removal of ash silt, debris boulders etc from culvert and making upsteream and sown stream chhanels to pass monsoon run off at K.M. 5/4 to 5/6 of colony Power house road by excavting and disposing off the same with 50 m lead 1.50 lifts in desire location with rate include safty arrangement and other expenses required to complete the work as per direction of required to complete the work as per direction of Engineer-In-charge.
Transportation of excavated material with all loading & unloading T&P, insurance etc complete lead upto 2 km
JYOTI TRADERS
R. L. TIWARI
RAJKAMAL INFRACON
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .