| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 CrAccepted-AOC | ₹3.9 Cr | L1 | Accepted-AOC PROPER |
| 2 | L2₹4.0 Cr+₹4.9 L (1.26%)Rejected-AOC | ₹4.0 Cr+₹4.9 L (1.26%) | L2 | Rejected-AOC Not Qualified for AOC |
Tender Value
₹4.0 Cr
EMD Value
₹7.9 L
Closing Date
4 Feb 2020, 2:00 pmClosed
Chief Engineer,W.R.Deptt
O/O Chief Engineer Water Resources Department Chandmari
Reconstruction of breached embankment of Puthimari River at Athgaon on R/B and Dakshin Ketekibari and Kachuarbari on L/B and improvement of Both Bank embankment in between Ch.21.80 Km to Ch.66.00 Km on R/B and Ch.18.50 Km to Ch.66.00 Km on L/B includ
2019_DoWR_14996_3
GHY.WEST/2019-20/SOPD-FDR/I
Open Tender
Civil Works
Works
120 days
PUTHIMARI
Please refer Tender documents.
3 documents required · 3 mandatory
₹8,000
The Executive Engineer, Ghy. West W R Division
₹7.9 L
Yes
14 Mar 2020
28 Jan 2020
5 Feb 2020
28 Jan 2020
4 Feb 2020
29 Jan 2020
Amount
Medium Jungles: Clearing medium jungles and trees upto 15 cm. girth including cutting, uprooting roots and stumps, removing them from the site of the work, etc. complete as directed. ( When 30% to 60 % of the area is covered by shrubs,trees etc)
Cutting banana trees, , uprooting roots & stumps including removing them from the site of work, etc. complete as directed
Earth work in embankment by truck carriage in ordinary/normal soil excluding sandy and rocky soil free from roots & vegetation and filling in uniform layers not exceeding 22cm. thick including ploughing or roughening or benching the seats, removing all debries, breaking clods up to 2.5cm cube, dressing as per design section including payment of forest royalty if any, etc. complete as directed. (10% deduction will be made from the section measured quantities of the completed and compacted on account of shrinkage). For initial lead beyond ½ Km and up to 4.00 Km and for all lifts
Compacting Original Ground (i) Compacting original ground supporting embankment Loosening, levelling and compacting original ground supporting embankment to facilitate placement of first layer of embankment , scarified to a depth of 150mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given Table 300.1& 300.2 for embankment construction as per Technical specification clause 301.4.1
Labour for ramming with cast iron rammer to proper compaction including watering if necessary , etc. complete as directed
Turfing with grass sods of largest possible rectangles of 12 cm. minimum thickness placed closely including dressing earth pagging with Jati bamboo split, watering till the grass grows for a lead up to 90mand all lifts.
Collection of sand gravel from approved quarry containing 60% sand and 40% gravel free from disintegrated and flacky pieces of vegetation and other deleterious matters, adherent coating etc. including stacking in suitable stacks at quarry site and payment of forest royalty etc complete as directed
Labour charge for laying of soling stone, brick bats, broken stone metal, sand gravel etc. on approach road including ramming dressing the seat and local carriage of materials up to a distance of 60 m complete as directed
Sailen Kumar Sharma
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .