Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAdmitted-Finance | ₹5.8 L | L1 | Admitted-Finance |
| 2 | L2₹6.1 LAdmitted-Finance | ₹6.1 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | REAL SERVICE ENTERPRISES L1 | V.R. ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00Rectification of Power House sewage PVC line and chamber at NCTPS-I | |||||
| 1.01 | Removal of ash/silt and disposal of the same at a distance of 5km away from the site including cost of labour, lead, lift, loading, unloading, transportation etc., complete. | 506.5 | cum | 135 ₹68,377.5 | 142 ₹71,923 |
| 1.02 | Dismantling the existing damaged R.C. Concrete and disposing the debris @ 2km away from the site as by the engineering lead, lift, labour charges, T&P etc complete. | 3 | cum | 4,977 ₹14,931 | 5,214 ₹15,642 |
| 1.03 | Brick work in CM 1:5 using fly Ash bricks including cost of all materials, lead, lift, labour curing etc., complete. | 25.5 | cum | 7,022 ₹1,79,061 | 7,357 ₹1,87,603.5 |
| 1.04 | Plastering in CM 1:5, 12mm thick including cost of all materials, lead, lift, labour, curing etc., complete | 472 | sqm | 312 ₹1,47,264 | 327 ₹1,54,344 |
| 1.05 | Providing and placing RCC 1:1.5:3 using 6 to 12mm HBG metal for pre-cast cover slabs including cost of all materials from work, curing, transporting and placing in position, lead, lift, labour and mixing charges etc., complete. | 32 | Nos | 399 ₹12,768 | 418 ₹13,376 |
| 1.06 | Supplying and fixing of best quality of PVC pipe 110mm dia of approved quality confirming to IS standard including cost of pipe, lead, lift, labour etc., complete. | 220.5 | m | 550 ₹1,21,275 | 576 ₹1,27,008 |
| 1.07 | Charges for fixing in position C.I manhole covers(light or heavy duty) of various sizes including cost of all materials, labour, lead, lift, etc., complete. | 15 | Nos | 2,335 ₹35,025 | 2,446 ₹36,690 |
Tender Value
₹6.6 L
EMD Value
₹6,600
Closing Date
11 Dec 2025, 2:00 pmClosed
SE/CM/NCTPS-I
NCTPS-I Chennai-120
Rectification of Power House sewage PVC line and chamber at NCTPS_I
2025_EB_626619_1
CE /NCTPS-I/SE/ CM/125/2025-26
Open Tender
Civil Works
60 days
CE/NCTPS-1
Refer Tender Document
2 documents required · 2 mandatory
₹0
₹6,600
Yes
12 Jun 2026
26 Nov 2025
12 Dec 2025
26 Nov 2025
11 Dec 2025
26 Nov 2025
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: CE/NCTPS-I
Name of Work: FOR NCTPS–I-CM Circle– CM-I-Rectification of Power House sewage PVC line and chamber at NCTPS-I
Contract No: CE/SE/CM/NCTPS-I/125/2025-26
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Scope of Work Item Code / Make Quantity Units HSN / SAC CODE Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE for Work portion in figures to be entered by the Bidder Rs. P BASIC RATE for Labour charges of Erection portion Rs. P BASIC RATE for consumables charges of erection portion Rs. P Packing & Forwarding Charges in percentage Freight & Insurance charges in precentage GST in percentage IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes in Rs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
1 Rectification of Power House sewage PVC line and chamber at NCTPS-I
1.01 Removal of ash/silt and disposal of the same at a distance of 5km away from the site including cost of labour, lead, lift, loading, unloading, transportation etc., complete. Item 1 506.5 cum Excess(+) Full Conversion INR
1.02 Dismantling the existing damaged R.C. Concrete and disposing the debris @ 2km away from the site as by the engineering lead, lift, labour charges, T&P etc complete. Item 2 3 cum Excess(+) Full Conversion INR
1.03 Brick work in CM 1:5 using fly Ash bricks including cost of all materials, lead, lift, labour curing etc., complete. Item 3 25.5 cum Excess(+) Full Conversion INR
1.04 Plastering in CM 1:5, 12mm thick including cost of all materials, lead, lift, labour, curing etc., complete Item 4 472 sqm Excess(+) Full Conversion INR
1.05 Providing and placing RCC 1:1.5:3 using 6 to 12mm HBG metal for pre-cast cover slabs including cost of all materials from work, curing, transporting and placing in position, lead, lift, labour and mixing charges etc., complete. Item 5 32 Nos Excess(+) Full Conversion INR
1.06 Supplying and fixing of best quality of PVC pipe 110mm dia of approved quality confirming to IS standard including cost of pipe, lead, lift, labour etc., complete. Item 6 220.5 m Excess(+) Full Conversion INR
1.07 Charges for fixing in position C.I manhole covers(light or heavy duty) of various sizes including cost of all materials, labour, lead, lift, etc., complete. Item 7 15 Nos Excess(+) Full Conversion INR
Total in Figures 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Quoted Rate in Figures Select
Quoted Rate in Words
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
BOQ_749253.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid